Construction Project Planner / Senior Planner, Ayoubco S.A.E., Lebanese University Campus - Hadath

START Date: 
July, 1997
END Date: 
April, 2000

Responsible for the preparation of schedules using Primavera program. Plans and optimize all resources employed. Keeps track progress of works. In charge of cash flow, claims related to delays in monthly schedule. Advises procurement for minimum material required each month. Coordinates site operation.

Experience Hours (Planning & Scheduling): 
2800
Experience Hours (Cost Management): 
1200
Experience Hours (Forensic Analysis): 
1450

JUNIOR DESIGNER, DAR EL HANDASA, DUHOK AIRPORT

START Date: 
July, 2011
END Date: 
July, 2011

As a civil engineer I have a good proficiency in the following subjects: Planning/scheduling for the project design phases, Coordination of infrastructure trades, as built networks auditing, Moreover, I’m in charge of design of water supply, Irrigation, firefighting, sewage and storm water networks, BOQ and specs preparation, Reporting, Shop drawings/ technical submittals review and comments Planning and Scheduling.

Akram Masri

First Name: 
Akram
Last Name: 
Masri
Oldest experience: 
Sep 2006 (17.7 yrs experience, WARNING: 36.7 years variance with Professional Since)
Years Experience: 
42

PLANNING ENGINEER, CAT Group, Planning Package - CAT Tenders

START Date: 
September, 2006

Planning Engineer - Estimation Dpt. - CAT Group, Beirut-Lebanon   (Nov. 2010 - Present)

Planning Engineer - Engineering Dpt. - C.C.C., Abu Dhabi-UAE        (Jul. 2009 - Oct. 2010)

Mechanical Engineer - Engineering Dpt. - C.C.C., Abu Dhabi-UAE    (Jan.2007 - Jun.2009) 

Employer's Representative , Credit Lyonnais Group (Foncière d’Orient) / Comair Group (JV), “Ellipse” High-Rise Building Project, and renovation of Credit Lyonnais Bank Branches Projects, Beirut, Lebanon.

START Date: 
July, 1992
END Date: 
January, 1994

Duties included preparing an EPC Level 6 schedule of works on PSN6 Project Management software which is similar to Primavera; preparing schedule of demolition works of the old Sursock Castle after dismantling all luxurious accessories; scheduling works for deep excavation on various aggregate site in a busy high-traffic area, then nailing and piling walls; conducting site progress and coordination meetings with subcontractors and construction team to coordinate work sequence with the overall project plan, and assuming follow-up of the consented upon sc

Planning Engineer / Project Coordinator, Murr Group, “Cap Sur Ville” Residential and Recreational Project, Lebanon. The project comprised 3 high-rise buildings (34 floors above ground and 2 basements each) with a height of 120 m, 18 buildings of 7 floors

START Date: 
January, 1994
END Date: 
August, 1995

Duties include ensuring that work is progressed as scheduled by identifying trends for management attention and by taking early prevention measures; reviewing the strategy of work submitted by the construction team of the various sections and adjusting the schedule to suit work constraints and open fronted areas; monitoring and reviewing the periodically project updated schedule; site coordinating between various trades and coordinating schedule variances; identifying delay and slippage, and providing recommendations for performance improvement and/or corrective

Section Engineer - External Works, Consolidated Contractors Company CCC / HOCHTIEF (JV), Rafic Hariri/Beirut International Airport Rehabilitation and Extension

START Date: 
August, 1995
END Date: 
August, 1997

Duties include preparing reinforced concrete shop drawings and the related bar bending schedules; designing pre-cast elements for terminal buildings and got Dar Al-Handasah approval; supervising concrete works in Utility Tunnel, Terminal Building New Elevated Arrival/Departure Bridge, infrastructure works related to electrical airfield lighting for the new East and West Runways with their taxiways; supervising turnkey construction of two electrical substations and concertina fencing on top of Boundary Walls; handing over the Elevated Water Tank, Civil Aviation P

Acting PM, Project Controls Engineer, Bemco Contracting Company, Al Habtour Hotel & Commercial Center

START Date: 
October, 2003
END Date: 
February, 2006

Project Controls, Contract Administration, Cost Control, Project manager Assistant and Acting PM during project close out.

Ghassan Zihri

First Name: 
Ghassan
Last Name: 
Zihri
Professional Since: 
Oct-2002 (21.5 yrs experience)
Oldest experience: 
Mar 2004 (20.2 yrs experience, WARNING: 1.3 years variance with Professional Since)
Years Experience: 
41