Senior Planning Engineer (directly reporting to the project manager), Industrial Construction &Engineering company (SIAC), three projects of budget cost (16000000$)

START Date: 
October, 2003
END Date: 
May, 2005

 

<

1-Small companies building-Smart village-Giza- Egypt

(71,595,360 L.E.)

A total area of 8000 m2 consisting of a basement and two (4-floors) buildings on 1800m2 each.

 

2- Master Foods Plant-6 October city-Egypt

Planning Manager (directly reporting to projects regional manager), Egyptian Centers for Real Estate Development (member of Alhokair Group –Saudi Arabia), Mall of Arabia -Egypt ($650,000,000 overall, $330,000,000 for construction)

START Date: 
December, 2007
END Date: 
November, 2012

gross area of the project 879,770 m2)

A built area of 243,567 m2, 5500 cars parking area of 225,000 m2 , 153,628 m2 for shopping mall on two floors, 16 cinemas, 182,432m2 green area.

Senior Planning Engineer (directly reporting to the project director), Dar Al-Handasah, Shair and Partners, San Stefano grand plaza - Alexandria -Egypt ($350,000,000)

START Date: 
February, 2007
END Date: 
November, 2007

(gross area of the project 30,000m2)

A total area of 440,000 m2 consisting of three parking floors, one 3-floor shopping mall, 3-floor administration area, six restaurants, ten cinemas, one 1500-persons capacity ballroom, 125 beds Four Seasons hotel, and 10 high-rise residential towers: (A) The West towers towards the sea, consisting of 26 floors including 400 furnished luxury apartments and (B) The East towers consisting of 30 floors with 500 apartments.

George Samir

First Name: 
George
Last Name: 
Samir
  1. Excellent software, hardware and network troubleshooting and maintenance skill
  2.    Good social and communication skills
  3.     Able to work under pressure
  4.     Good understanding of networks applications
  5.     Good understanding of security concepts and applications
  6.     organized flexible, self-confident and team player
Professional Since: 
Sep-1984 (40.9 yrs experience)
Years Experience: 
0

esaeed kawag

First Name: 
esaeed
Last Name: 
kawag

Mechanical Engineer

Professional Since: 
Jul-1992 (33.1 yrs experience)
Years Experience: 
0

quantity surveyer, Khattab Contracting, Many Villas in Alshrouk City, New Cairo City, New Maady City

START Date: 
July, 2007
END Date: 
May, 2009

 

* From 01-07-2007 till 20-05-2009Iworked at “Khattab Construction Company

   As Technical Office Engineer in charge of:-

- Quantities Surveying for:-

1-           Site Works “Excavation & backfilling works, Landscaping works, paving &

Mahmoud Abohashem

First Name: 
Mahmoud
Last Name: 
Abohashem

Planning and Project Controls Engineer with 5 years professional experience in construction projects management (High Rise Buildings , Power Plants, Industrial Facilities, Embassies), self motivated and believing in continuous development, PMP and PSP certified, next step is preparation of CCP certificate from AACE, still have much to learn and always will be.

Skills:

  • Primavera P6
  • Planning and Scheduling
  • Progress Monitoring
  • Cost Loading and Updating
  • Contracts
  • Time Impact Analysis
  • Attendance Management
Professional Since: 
Aug-2008 (17.0 yrs experience)
Oldest experience: 
Aug 2008 (17.0 yrs experience)
Years Experience: 
4

Project Controls Engineer, ARCONS, Alkhalij Power Plant - Sirt Libya

START Date: 
December, 2009
END Date: 
July, 2012

• Reviewing and studying contract agreement.
• Preparation of Method Statement for Erection of steel structure and tanks.
• Preparation of master and detailed project schedule (Primavera P6).
• Updating and follow up project schedule.
• Preparation of Daily, Weekly & Monthly Progress Reports.
• Preparation and follow up Material Control System.
• Control and follow up of monthly payments.
• Coordination and control of all incoming and outgoing e-mails and letters from and to the client.

PLANNING COORDINATOR, Mancon Consutlancy and Project Management , Mantrac Takoradi New Facility-Ghana

START Date: 
July, 2012
END Date: 
June, 2013

* Preparing master and detailed time schedule (using primavera P6 and MS Project).
* Coordination with design team to prepare tender package
* Evaluation and awarding of contractors.
* Preparation of contract agreements complying with FIDIC standards.
* Preparation of projects budget.
* Following up construction phase (time and cost).
* Coordination with different project parties (emails - meetings).
* Document controlling (project documents - historical data - lessons learned)

Project Controls Team Lead, BP, Rehabilitation Project

START Date: 
October, 2007
END Date: 
June, 2008

Responsible for the planning, scheduling and programming of Brownfield major projects.