Sr.Planning Engineer, AL JABER GROUP (JTC) ,Qatar, New Doha International Airport Projects (NDIA) Package -66

START Date: 
April, 2010
END Date: 
June, 2011

Project: New Doha International Airport Projects (NDIA) Package -66 Corniche Landscaping, Bike Path, Bus Shelters and Parking Lot Shade Structure projects.

Sr.Planning Engineer, Athena Chhattisgarh Power Ltd, 2 x 600 MW Singhitarai Thermal Power Plant

START Date: 
May, 2007

Working as Sr.Planning Engineer at Athena Chhattisgarh Ltd, Hyderabad

Preparing & Updating Integerated schedule for 2 x 600 MW Singhitarai Thermal Power Plant

Sr.Planning Engineer, Mobty, Oil Refinery

START Date: 
January, 2010
END Date: 
January, 2012

Sr.Planning Engineer at Mobty and controlling more than 14 projects 

Sr.Planning Engineer, IBM India Private Limited (Global Business Services department), Mumbai International Airport Terminal 2

START Date: 
June, 2011
END Date: 
February, 2013

Sr.Planning Engineer for Mumbai International Airport Terminal 2 (Airport System integration & Information Broker Project)

Experience Hours (Planning & Scheduling): 
3500
Experience Hours (Cost Management): 
1500
Experience Hours (Forensic Analysis): 
3500

Sr.Planning Engineer, Afcons Infrastructure Limited, DMRC projects,(One Elevated Viaduct, One Underground Cut and Cover method) and Teder projects at Corparate Office

START Date: 
November, 2006
END Date: 
December, 2010

Work Profile at Corporate Office:

 

  1. Study the drawings and finalization of working methods and development of Conceptual drawing schemes for the project main activities.
  2. Preparation of Tender programs and Baseline programs in Primavera, time cycles and quantity calculations.
  3. Requirement of Manpower and Materials calculations.
  4. Preparation of Major equipment list and CAPEX for the projects.
  5. Co-ordination between the site planning team and Technical-di

Sr.Planning Engineer, GRIFFIN ENERGY LIMITED, Electrical & Instrumentation and commissioning for onshore oil and gas, EPC works for Civil, Mechanical

START Date: 
May, 2009
END Date: 
September, 2011

Responsible of handling Planning, Scheduling, Monitoring and control activities (for upstream, downstream, Turnaround Development projects)Planning ; Scheduling for EPC ; I activities fortheOil & Gas Fields and Production Facilities.My scope included putting together a CPM network using Primavera P3/P5 ,Planning, Scheduling, monitoring and reporting progress to management, Production of a critical path logic network fully resourced along with progress curves and manpower histograms.

Experience Hours (Planning & Scheduling): 
4650
Experience Hours (Cost Management): 
150
Experience Hours (Forensic Analysis): 
0

Sr.Planning Engineer, Delta Emirates Contracting Co.LLC, Red Residence ,Kensington Royal Tower ,Berlin City Center ,Exchange Tower

START Date: 
September, 2009
END Date: 
October, 2010

Currently handling Different Projects of Delta Emirates Mainly

1) 2B+G+22 & 2B+G+18 in Dubai Sport city –Client: - M/S Middle East Development -  Project CostAED277million

    Running Project         

2) 3B+14+R at Al Barsha Dubai –Client –Dubai Islamic Bank Project cost AED 147 million

  Project at Finishing Stage - Working on Claims/EOT

3) 4B+G+M+28 -Berlin City Center in Mizin -Dubai

 Working on Master programme /Baseline

Sr.Planning Engineer, First Kuwaiti, (various projects)

START Date: 
August, 2005
END Date: 
July, 2011

Define Project Management Procedures Up-Front.
Planning and scheduling the project works, utilizing a Project Definition Document.
Manage and Control the project.

Sr.Planning Engineer, Wara Construction company, INVESTMENT DAR TOWER (20 Floors commercial tower).

START Date: 
May, 2007
END Date: 
August, 2008

·   Prepare the Baseline Construction schedule and updating.

·   Prepare Schedule Of Values.

·   Cost loaded program.

·   Prepare Pre-meeting and monthly reports.

·   Prepare recovery construction schedule

·   Prepare Claim for Extension of time.

·   Prepare minutes of Co-ordination meetings.