Scheduler, eDRAGON Power Builder, 37-Storey Residential Building

START Date: 
February, 2013
  1. Monitors project status & plan for catch-up as necessary.
  2. Analyzes related factors that causes delays & be able to scrutinize the delays to control probable slippage of schedule and or minimize its effect in the overall execution of the project.
  3. Tracks down and assess weekly progress.
  4. Prepares weekly and monthly accomplishment reports.
  5. Revision of project schedule.
  6. Prepares look ahead schedule.
  7. Prepares Manpower report.
  8. Attend management meeting as to present project status.

PLANNING ENGINEER, Thiess Industrial Projects, Wandoan Coal Handling & Preparation Plant - Wandoan Coal Project

START Date: 
November, 2011
END Date: 
January, 2012
  • Prepare resource & cost loaded loaded schedules for Process Plants in Coal Handling Sector
  • Effectively gather construction progress activity to provide advice and feedback to construction personnel on their work area activities monitored against the Construction Program.
  • Interface with construction personnel providing feedback on progress impacts on the Construction Program.
  • Interface with construction personnel on productivity.
  • Continual maintenance of the Construction Program through analysis of construction activity data and effective update
Experience Hours (Planning & Scheduling): 
500

Planning Engineer, Consolidated Contractors International Company W.L.L, Khursaniyah Gas Plant Project,Rabigh Olefin Plants Project, PNUFW

START Date: 
May, 2006
END Date: 
March, 2011

 

 

Responsible for the preparation of master project schedule and plans during execution stage. 

Prepare detailed forecast and actual output (including weight charts) for all discipline.

Planning Engineer, Consolidated Contractors International Company W.L.L, Khursaniyah Gas Plant Project,Rabigh Olefin Plants Project, PNUFW

START Date: 
May, 2006
END Date: 
March, 2011

 

 

Responsible for the preparation of master project schedule and plans during execution stage. 

Prepare detailed forecast and actual output (including weight charts) for all discipline.

SENIOR ENGR PLANNING, Masters Management Consultancy, Commercial Buildings

START Date: 
June, 2005
  • Overall responsibility of preparing plan for execution & monitoring of adherence of same.

Maintenance Planning Engineer, Abu Dhabi Polymer Company (BOROUGE), Routine/Shutdown Maintenance

START Date: 
August, 2000

Routine/Shutdown Maintenance Planning,scheduling,monitoring&updating in Petrochemical/Oil-Gas Industries by using SAP PM/MM/PS Modules,Primavera 6 and MS-Project.

Graduate in Mechanical Engineering (B.E.) with 10 Years Experience in the above mentioned field as a Maintenance Planning Engineer.

Counties worked India,Saudi Arabia,Qatar,Oman and now in UAE.

Shutdown/Project Scheduler, Shell Refining Co. Fom. Bhd, 2010 Inplot Mini Shutdown, 2011 Major Turnaround, 2011 MAB Pit Stop Shutdown

START Date: 
June, 2009

Current Role:

  • - Responsible in Planning/Schedule Development stage for Shutdown/Turnaround
  • - Develop Integrated Execution Schedule – Structure
  • - Develop Code Structure in P3E as per system - Systemisation Structure
  • - Data entry / import of detail job plans and estimates into scheduling tool.
  • - Create logical network of activities and, ultimately, a critical path of work and schedule, without overly constraining the schedule.
  • - Updates schedule as required – typically daily or shiftly - based on planner reporte