Construction programme development

SUB AGENT, Edmund Nuttall UK, Tunnels

START Date: 
August, 2006

Sub Agent for a civil engineering contractor looking to get into project and programme management roles.

Duties

Short term (quartely) planning for a section of works in a civil engineering project using MS Projects

Montoring and updating progress

Project Planner / Technical Assistant, Gama For Trading and Contracting-Cairo, Unilever factory, Cairo Egypt

START Date: 
August, 2002
END Date: 
September, 2004

Planning Engineer  & Technical Office Engineer

  1. Creating Time Schedule
  2. Cost Control Reports
  3. Cash Flow
  4. Monthly Payment Certificate
  5. Updating Time Schedule
  6. Monthly Progress Reports
  7. Quantity Surveying

Planning Engineer, Manazel Construction Company, Ashbeliah Housing Project (400 villas)

START Date: 
November, 2004
END Date: 
September, 2006
  1. Productivity Report and Monthly update of Actual man hours versus Budget Man-hours
  2. Preparing cash –flow chart and comparing expected expenditure against schedule income.
  3. Comparing actual cost report to the budget cost and projecting the cost at the end of the projects
  4. Total Budget report including direct and indirect cost, Labor, material, equipment and subcontractor.
  5. Material Coordinator & Follow up
  6. Workshop Drawing (Structural)
  7. Quantity Surveying

Planning Engineer, Saudi Tumpane Compant ltd, Shuaibah Independent Water Power Plant, Water Leakage detection Project In Riyadh City

START Date: 
November, 2006
END Date: 
March, 2008
  1. Responsible For The Development Of for construction, Schedule.
  2. Take The Lead In The Creation Of Work Breakdown Structures (WBS) And Development Of Schedules And Budget Data (Including Resource Loading) For Those WBS Elements.
    Analyzes Unit Rates To The Extent That The Estimate To Complete Unit Rates Is Well Understood And Defendable.
  3. Analyzes Schedule Progress And Performance And Identifies Developing Problem Areas.
    Assembles And Compiles Schedule And Cost Data And Inputs Into The Project Control Database And Provide Output To The Project Team.