EPC Lead Planner, PT. Raga Perkasa Ekaguna, EPCC South Sembakung Gas Plant

START Date: 
July, 2010
END Date: 
June, 2011

• Planning, scheduling and updating Master Schedule (Level 1 – 2) and detail schedule (Level 3 - 4).
• Review, monitoring and preparing project schedule report summaries (including Engineering Document Register, Procurement Schedule, Expediting Report, S-Curve and Progress & Invoice Monthly Report) of Master Schedule that have been assigned.
• Coordinate with Engineering team for monitoring the Engineering deliverable.
• Coordinate with Procurement and Logistic team to monitor material preparation before construction works.

Experience Hours (Planning & Scheduling): 
8000
Experience Hours (Forensic Analysis): 
3500

Rifa Ariefandi

First Name: 
Rifa
Last Name: 
Ariefandi

- Ability to develop and maintain detailed schedules as per WBS

- Ability to develop and update schedules, create reports and provide analysis using Microsoft Project and Primavera

- Ability to work well under pressure

- Effective and good communicator

- Well teamworker

Professional Since: 
Jan-2004 (20.8 yrs experience)
Oldest experience: 
Jul 2010 (14.3 yrs experience, WARNING: 6.5 years variance with Professional Since)
Years Experience: 
6

Planning Engineer, PT. Adhi Karya Construction Division, EPCC Melati Margonda’s Apartments

START Date: 
November, 2011
END Date: 
January, 2012

• Planning, scheduling and updating Master Schedule (Level 1 – 2) and detail schedule (Level 3 - 4) and also S-Curve.
• Review, monitoring and preparing project schedule report summary by weekly and monthly (including Progress Claim & Invoice Monthly Report) of Master Schedule which have been assigned.
• Coordinate with Procurement and Logistic team to monitor material preparation before construction works.
• Coordinate with Construction team and sub Contractor to achieve the target schedule as per contract milestone
 

Experience Hours (Planning & Scheduling): 
2000
Experience Hours (Forensic Analysis): 
1500

Planning and Control Engineer, PT.Teamworx Indonesia, Construction Engineering for various Factory Plant

START Date: 
February, 2012
END Date: 
July, 2012

• Review contractors project schedule and prepare join schedule of contractor work.
• Monitor and analyze ongoing construction schedule and advice works priority.
• Coordinate with Contractor to achieve the target as per milestone.
• Prepare and monitor status of variation works.
• Monitor the cost of construction to ensure that the cost still meet the required budget.
• Periodically prepare report by weekly and monthly

Experience Hours (Planning & Scheduling): 
3800
Experience Hours (Forensic Analysis): 
1800

Lead Planner - Offshore Works, PT. Gunanusa Fabricator, Yadana Subsidence Project EPSCC-1 and EPSC-2

START Date: 
August, 2012
END Date: 
March, 2014

• Review contractors project schedule and prepare join schedule of contractor work.
• Monitor and analyze ongoing construction offshore schedule and advice works priority.
• Prepare and monitor status of variation works.
• Coordinate with Construction and Operation to maintain the target schedule as Contractor 3 week look ahead plan.
• Intergrate the Fabrication planning with the Offshore work planning.
• Coordinate with Engineering team to accommodate input from Engineering task sheet.

Experience Hours (Planning & Scheduling): 
10500
Experience Hours (Forensic Analysis): 
8100

Site Project Controls Engineer, Exxon Mobil, EPC1 Banyu Urip Project ExxonMobil Cepu Limited

START Date: 
April, 2014
END Date: 
September, 2015

• Provide stewardship for Functional Support and daily-weekly reporting (POB, Dia-In Piping and QC cheksheet).
• Review and monitor the Contractor’s performance in the areas of scheduling and progress measurement, also provide input as necessary to assist the Company’s milestone are achieved.
• Prepare all required weekly reports and provide project execution report into the Project Execution Monthly Report.
• Coordinate with Construction team and Contractor team to maintain the target schedule as Contractor 3 week look ahead plan.

Bobby wicaksono

First Name: 
Bobby
Last Name: 
wicaksono

I worked at PJB in Indonesia, PJB is Power Generating Company. 

I have experiences on:

1. Maintenance Hydro Power Plant 55 MW

2. Operation Hydro Power Plant  55 MW

Professional Since: 
May-2006 (18.4 yrs experience)
Oldest experience: 
May 2006 (18.4 yrs experience)
Years Experience: 
48

Acting Control Engineer, PJB Indonesia, Sumut-2

START Date: 
November, 2017
END Date: 
April, 2018

I am Project Engineer in PJB Indonesia especially in Mechanical Enggineering.

Right now i am having IPP Steam Turbine Project in Medan, North Sumatera Indonesia.

Experience Hours (Planning & Scheduling): 
50
Experience Hours (Cost Management): 
50
Experience Hours (Forensic Analysis): 
100

primaditya sulistijono

First Name: 
primaditya
Last Name: 
sulistijono

I have experience in Electrical Engineering for 2 years at Gresik Steam Power Plant. Then I manage operation and maintenance activities for almost all power plant in Java.

Professional Since: 
Mar-2016 (8.6 yrs experience)
Oldest experience: 
Mar 2016 (8.6 yrs experience)
Years Experience: 
2

Planner, PT Pembangkitan Jawa Bali (PJB), Power Plant

START Date: 
August, 2017

I am an Assistant Analisys in Operation and Maintenance Planner for 1 year

Market Place

Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher. Teach yourself using on-line or book based learning or run your own in-house or public courses.
Syndicate content