Indonesia (AS.ID)

Project Control / Project Services Manager, PT Resindo, Awak mas Gold mining Project

START Date: 
April, 2018

Scheduling and cost controling for various Mining and Energy Project  ( for feasibility project) 

Experience Hours (Planning & Scheduling): 
2000
Experience Hours (Cost Management): 
1000
Experience Hours (Forensic Analysis): 
600

Officer of Powerplanf Stockist Business, PT Pembangkitan Jawa Bali, Critical Part and Service Procurement for PLN FTP 1 Powerplants

START Date: 
December, 2013
END Date: 
February, 2018
1. Receiving Delivery Orders based on Assignment Contract of Critical Parts from 37 powerplant of Fast Track Project 1 PLN. 2. Implementing Direct Contract to OEM based on the Delivery Orders (including clarification of technical specifications between users and manufacturer until settlement of contract with manufacturer). 3. Processing claims to manufacture based on users findings of the critical parts.
Experience Hours (Planning & Scheduling): 
8000
Experience Hours (Cost Management): 
8000
Experience Hours (Forensic Analysis): 
800

Laili Sulistyarini

First Name: 
Laili
Last Name: 
Sulistyarini
Professional Since: 
Dec-2017 (2.0 yrs experience)
Years Experience: 
0

Scheduler, PT INTI KARYA PERSADA TEKNIK, Lumut Balai Geothermal Power Plant Project (55 MW) at Muara Enim, South Sumatera, Indonesia. Client: PT Pertamina Geothermal Energy (Marubeni Corporation).

START Date: 
June, 2017
Jun 2017- present PT INTI KARYA PERSADA TEKNIK (IKPT) Assigned as SITE PLANNING AND SCHEDULING ENGINEER for Lumut Balai Geothermal Power Plant Project (55 MW) at Muara Enim, South Sumatera, Indonesia. Client: PT Pertamina Geothermal Energy (Marubeni Corporation). • Developed detail construction schedule, expand from Project Master Schedule for better work and progress monitoring for construction team and client. Liaised and coordinate with subcontractor and discipline engineer to come up with agreed workable construction schedule.

Planning & Project Control Engineer, PT ADHI KARYA, 2 x 7 MW Fired Coal Steam Power Plant Project (PLTU) at Tembilahan, Indragiri Hilir, Riau Province, Sumatra Island, Indonesia

START Date: 
September, 2016
END Date: 
June, 2017
Sep 2016 – Jun 2017 PT ADHI KARYA (Persero) Tbk. Assigned as PROJECT CONTROL ENGINEER for 2 x 7 MW Fired Coal Steam Power Plant Project (PLTU) at Tembilahan, Indragiri Hilir, Riau Province, Sumatra Island, Indonesia; Owner: PT.

Site Planner, Siemens, Singapore Jurong Cogeneration Project, ExxonMobil.

START Date: 
September, 2015
END Date: 
March, 2016
Sep 2015 – Mar 2016 AMIDA GLOBAL PTE LTD. Seconded to SIEMENS, Batam Fabrication Yard as SITE PLANNER for Singapore Jurong Cogeneration Project, ExxonMobil. The scope of works is a substation building with aprox weight 665 MT Major E&I equipments inside the building are Gas Insulated Switchgear, switchgear, transformers, and overhead bridge crane.

Bambang Wicaksono

First Name: 
Bambang
Last Name: 
Wicaksono
Primavera P6, Ms. Project, Pert Master, Visual Basic for Application in Excel and Ms. Access.
Professional Since: 
Nov-2001 (18.1 yrs experience)
Oldest experience: 
May 2008 (11.6 yrs experience, WARNING: 6.5 years variance with Professional Since)
Years Experience: 
48

Site Planner, GE Oil and Gas, Fabrication of Subsea Manifolds and Associated Equipment for the Gorgon Upstream Project

START Date: 
October, 2010
END Date: 
July, 2012
Oct 2010 – Jul 2012 PT INTI BRUNEL TEKNINDO Seconded to GE OIL AND GAS as SITE PLANNER for Fabrication of Subsea Manifolds and Associated Equipment for the Gorgon Upstream Project. • The works are done in PT McDermott Indonesia as the sub-contractor of GE Oil and Gas to do the fabrication. The scope of works are Manifold, PTS and CDU modules and foundations, PLETs, DW and PPI SSPLRs, flowline spools, and well jumpers.

Albertus Wahyu Anindityo

First Name: 
Albertus Wahyu
Last Name: 
Anindityo
Professional Since: 
Mar-2011 (8.8 yrs experience)
Years Experience: 
0

adi kusuma

First Name: 
adi
Last Name: 
kusuma

SUMMARY OF WORK EXPERIENCES:

I have been working as a Planning Engineer/ Project Controller for around 5 years. Starting from January 2013 with PT Technip Indonesia until April 2017. After that joined with PT Mott MacDonald from September 2017 until now.

Professional Since: 
Jan-2013 (6.9 yrs experience)
Years Experience: 
0

Market Place

Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher and PMI accredited REP. Teach yourself using on-line or book based learning or run your own in-house or public PMI accredited courses.
See how the TIME - LOCATION - VIEW brings clearness to your work programmes
For 25+ years, APMX has been providing competency based project management training to Fortune 500 companies around the world, applying the principles of project based learning, designed to produce measurable results, generating a favorable “return on training investment”.
Syndicate content