Indonesia (AS.ID)

Production Facilities Project Planning & Control Engineer, PT Medco E&P Indonesia, Facilities Project

START Date: 
January, 2008
END Date: 
August, 2014

Project Planning and Control Engineer for Major Production Facilities Projects

Sulistianto Sunaryo

First Name: 
Sulistianto
Last Name: 
Sunaryo

Normal 0 false false false EN-US

Professional Since: 
Jun-1990 (29.5 yrs experience)
Years Experience: 
0

Rahmat Hidayat

First Name: 
Rahmat
Last Name: 
Hidayat

*** SENIOR / MANAGER PROJECT PLANNING & CONTROL (EPC IN OIL & GAS INDUSTRIES) ***

20+ years total experience with 10 years at fields

Motto: First Safety first, in time completion, & financial healthy are essential to Project

Professional Since: 
Jun-1996 (23.5 yrs experience)
Oldest experience: 
Jun 1996 (23.5 yrs experience)
Years Experience: 
22

SENIOR PROJECT PLANNING & CONTROLER, JOINT OPERATION BODY OF PERTAMINA (PHE) & MEDCO EP TOMORI SULAWESI , SENORO GAS DEVELOPMENT PROJECT

START Date: 
January, 2015
END Date: 
February, 2017

Planning and controlling the Senoro Gas Development Project in Sulawesi under Owner Organization & Management. The Project facilities consist of CPP Trains 2 X 155 MMScfd with 23 KM Sales Gas Pipeline, 5 Cluster of Wellheads, and Jetty Head Facility.

 

Experience Hours (Planning & Scheduling): 
2000
Experience Hours (Cost Management): 
750
Experience Hours (Forensic Analysis): 
1000

Zone Manager/Planning Manager, MNC, MNC Park

START Date: 
September, 2017
END Date: 
January, 2018
Project Manager of MNC Group- MNC Land Theme Park-Indonisia1.Review Cash flow,budget,schedule and obs of GC.2.Phasing Plan development incl.BOH,Ride,show and attaction.3.BIM Vendor proposal review and RFP developmemt.4. GC contract Negoxiation.5.
Experience Hours (Planning & Scheduling): 
900
Experience Hours (Cost Management): 
600
Experience Hours (Forensic Analysis): 
450

EPC Lead Planner, PT. Raga Perkasa Ekaguna, EPCC South Sembakung Gas Plant

START Date: 
July, 2010
END Date: 
June, 2011

• Planning, scheduling and updating Master Schedule (Level 1 – 2) and detail schedule (Level 3 - 4).
• Review, monitoring and preparing project schedule report summaries (including Engineering Document Register, Procurement Schedule, Expediting Report, S-Curve and Progress & Invoice Monthly Report) of Master Schedule that have been assigned.
• Coordinate with Engineering team for monitoring the Engineering deliverable.
• Coordinate with Procurement and Logistic team to monitor material preparation before construction works.

Experience Hours (Planning & Scheduling): 
8000
Experience Hours (Forensic Analysis): 
3500

Rifa Ariefandi

First Name: 
Rifa
Last Name: 
Ariefandi

- Ability to develop and maintain detailed schedules as per WBS

- Ability to develop and update schedules, create reports and provide analysis using Microsoft Project and Primavera

- Ability to work well under pressure

- Effective and good communicator

- Well teamworker

Professional Since: 
Jan-2004 (16.0 yrs experience)
Oldest experience: 
Jul 2010 (9.5 yrs experience, WARNING: 6.5 years variance with Professional Since)
Years Experience: 
6

Planning Engineer, PT. Adhi Karya Construction Division, EPCC Melati Margonda’s Apartments

START Date: 
November, 2011
END Date: 
January, 2012

• Planning, scheduling and updating Master Schedule (Level 1 – 2) and detail schedule (Level 3 - 4) and also S-Curve.
• Review, monitoring and preparing project schedule report summary by weekly and monthly (including Progress Claim & Invoice Monthly Report) of Master Schedule which have been assigned.
• Coordinate with Procurement and Logistic team to monitor material preparation before construction works.
• Coordinate with Construction team and sub Contractor to achieve the target schedule as per contract milestone
 

Experience Hours (Planning & Scheduling): 
2000
Experience Hours (Forensic Analysis): 
1500

Planning and Control Engineer, PT.Teamworx Indonesia, Construction Engineering for various Factory Plant

START Date: 
February, 2012
END Date: 
July, 2012

• Review contractors project schedule and prepare join schedule of contractor work.
• Monitor and analyze ongoing construction schedule and advice works priority.
• Coordinate with Contractor to achieve the target as per milestone.
• Prepare and monitor status of variation works.
• Monitor the cost of construction to ensure that the cost still meet the required budget.
• Periodically prepare report by weekly and monthly

Experience Hours (Planning & Scheduling): 
3800
Experience Hours (Forensic Analysis): 
1800

Market Place

See how the TIME - LOCATION - VIEW brings clearness to your work programmes
For 25+ years, APMX has been providing competency based project management training to Fortune 500 companies around the world, applying the principles of project based learning, designed to produce measurable results, generating a favorable “return on training investment”.
Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher and PMI accredited REP. Teach yourself using on-line or book based learning or run your own in-house or public PMI accredited courses.
Syndicate content