Sr. Planner, Bam International Abu Dhabi LLC, Museum of the Future

START Date: 
January, 2017

Setting up of detailed baseline program with Primavera P6; prepared BoQ cost breakdown activity wise and loading baseline program activities with cost, quantity and manpower resources; issued start-up programmes to project team; Preparation of engineering (shop drawing, material and method statement) schedules and long lead procurement schedules in line with baseline programme; Setting up of progress measurement system including kpi’s and dashboard; Preparation of S-curves for cash flow; Updating baseline programme and reviewing it with project team; Prepared client progress reports and pre

Sr. Planner, Depa Qatar WLL (Present) & Prime Projects International (Previous), Golden Gulf Tower, Falcon Tower, Hamad Medical City Hospital Fit-Out, Ramada Hotel, Bagram Theater Internment Facility (BTIF)

START Date: 
April, 2012
My responsibilities in this project include preparation of baseline program based on BOQ, Design Drawings and Specifications. Update of project schedule, monitoring of project progress at site, attend risk and progress meetings, preparation of project weekly & monthly reports, attend lessons learned meetings, manage subcontractor schedule and schedule updates, preparation of extension of time claims and participate in technical meeting, prepare and update issue logs. Generate acceleration schedule to mitigate delay and slippages.
Experience Hours (Planning & Scheduling): 
10000
Experience Hours (Cost Management): 
2000
Experience Hours (Forensic Analysis): 
2000

Sr. Planner, DuPont, Engineering

START Date: 
July, 1986

Planner / Scheduler - Nuclear Power, Fossil and Chemical Plants.  Engineering and Maintenence Planning.

Sr. Planner, DuPont, Engineering

START Date: 
July, 1986

Planner / Scheduler - Nuclear Power, Fossil and Chemical Plants.  Engineering and Maintenence Planning.

Sr. Planner, DuPont, Engineering

START Date: 
July, 1986

Planner / Scheduler - Nuclear Power, Fossil and Chemical Plants.  Engineering and Maintenence Planning.

STRUCTURAL & SITE ENGINEER, SR. PLANNER, Meinhardt, Hopewell Holdings, CEPA, AOKI Corporation, etc, 3X660 MW Coalfired Power Station, Commercial Buildings, Airport Superhighways and Railways

START Date: 
April, 1989
END Date: 
August, 1997

HONGKONG PROJECTS INVOLVEMENT:

  • Project Planner and Controller of the West Kowloon Expressway project (WKES) (i.e. expressway, roads, bridges and MTRC floating railway tunnels) of the Airport Core Development Projects. Also involved in the project control and monitoring of the Northern Kowloon Site Roadworks and the Yam-O Section Site Development.
  • Project Management - Project planner of the assigned projects in Haeco Airport (HK) and China.

CHINA PROJECT INVOLVEMENT:

Sr. Planner, WS Atkins & Partners Overseas, Buildings and Infrastructure

START Date: 
March, 2006
END Date: 
January, 2008

Projects Experience :

Sr. Planner, AECOM, New Doha Port Project

START Date: 
May, 2005
  1. Prepare and coordinate with PMs for High Level Executive Dashboard Report.
  2. Prepare Master Work Programme from P6 with cost and resource loading, update and analyze fortnightly in coordination with sub-consultant and contractors’ updated programme.
  3. Programme/Planning specifications input for the package/contract being tendered.
  4. Establish WBS
  5. Evaluate and analyze consultants’ and contractors’ detailed schedules.
  6. Monitor and analyze Contractor and Consultants’ progress against the Master Work Programme
  7. Monitor actual cost and establish Earne