1000 MW Coal based Power Plant Schedule.

7 replies [Last post]
Prashant Patel
User offline. Last seen 13 years 14 weeks ago. Offline
Joined: 19 Dec 2004
Posts: 6
Groups: None

Can anyone share his eperience of Making 1000 MW Coal based Power Plant Schedule.

Replies

Mike Testro
User offline. Last seen 3 weeks 1 day ago. Offline
Joined: 14 Dec 2005
Posts: 4398

Hi Sayed

Did you notice that the original date on this thread was 2006!!!

I am going to lock it now.

Best regards

Mike Testro Moderator.

Syed Ali
User offline. Last seen 1 year 37 weeks ago. Offline
Joined: 28 Nov 2007
Posts: 16

Hi Prashant,

You looking for sample schedules for 1000MW power plant?

Is it EPC or construction phase? If you go through SOW and drawings you will have what you need.

kamesh avasarala
User offline. Last seen 16 weeks 2 days ago. Offline

i THINK THERE IS NO 1000MW SINGLE UNIT IN THERMAL POWER IN INDIA . I HAVE 660MW SUPER CRITICAL L2 SCHEDULE IF ANY BODY WANTS I CAN SEND IF YOU HAVE ANY EXAMPLES PLEASE SNED ME IAM DOING 660MW THERMAL POWER PLANT IN INDIA AP.

Jin Xiaoxiong
User offline. Last seen 7 years 40 weeks ago. Offline
Joined: 17 Dec 2010
Posts: 2
Groups: None

I need one too~~~~~~~~~~~~~~~~~~~

Praves Suppa
User offline. Last seen 4 weeks 2 days ago. Offline
Joined: 16 May 2006
Posts: 39
Groups: None
Hello,

I experienced for the Combined Cycle Power Plant 2 Stages of 750 MW (EPC). I can give you for a short project case study if you want.

Br
Praves
Tu Huynh Van
User offline. Last seen 10 years 47 weeks ago. Offline
Joined: 8 Aug 2006
Posts: 21
Hi,

Your Projects are a EPC project or only a Construction phase?

you are Owner’s Scheduler or Contractor’s Scheduler?
Armando Moriles
User offline. Last seen 12 years 14 weeks ago. Offline
Joined: 9 Dec 2005
Posts: 104
Groups: None
Hi,

1. Is it a single unit 1000Mw Coal Fired Power Plant?
2. Are you working on the overall project schedule from civil to electro-mechanical works?


Arman