Piping activities

6 replies [Last post]
George Bolton
User offline. Last seen 18 years 13 weeks ago. Offline
Joined: 21 Oct 2005
Posts: 11
Groups: None
Hi,

I am very interested in learning the logic sequence of piping activities for the construction of oil and gas, from the beginning to the end, and its relationship with structural erection and equipments set-up.

Thank you in advance.

Replies

Jithin Kambhikanam
User offline. Last seen 6 days 23 hours ago. Offline

Hi George,

You already have the answer. But let me add mine

Pipe Delivery - Shop Fabrication - Pipe Fabrication - Pipe Welding - Blasting - Painting - Pipe field Installation Above Ground - Pipelaying on the support - Welding - Hydrotest - For the whole piping at a time-  Leak Test/Nitrogen Flushing 

 

Dilip Konar
User offline. Last seen 6 years 19 weeks ago. Offline
Joined: 5 Mar 2012
Posts: 5
Groups: None

Dear Sir,
i want rate analysis format of pipe manufacturing process.
like how much manpower, machineries, material required and cosumed enery etc...and testing expenses.

Thanks

Mike Testro
User offline. Last seen 1 week 4 days ago. Offline
Joined: 14 Dec 2005
Posts: 4418

Hi Dilip

Excavaate > Bedding > String Out > Weld > Test > Cover Joint > Side Lay in Trencg > Backfill 1 > Warning tape > Backfill 2 > FOC > Backfill 3 > Fence / Markers.

Best regards

Mike Testro

Dilip Konar
User offline. Last seen 6 years 19 weeks ago. Offline
Joined: 5 Mar 2012
Posts: 5
Groups: None

Dear Sir,

 i want total process analysis  like pipe ( 2500mm innner dia) manufacturing with 20mm thickness plate including sand blasting and black painting outer surface.

Izam Zakaria
User offline. Last seen 7 years 16 weeks ago. Offline
Joined: 28 May 2006
Posts: 221
just roughly explaination....

str
prefab that’s mean mark cut act. for stiff,plateand etc

pip
we’ve
mark,cut,install,fit,field weld,soft weld,ndt,hydrotest,re-instate and etc..........

if u want the details act... plaese directly email to me

aizamcapri@gmail.com or maz.aizam@simedarby.com

actually i’m very happy with oil and gas industries...
if compare to design and maintenance side.....
but is better if u can involve with oil and gas...
Charleston-Joseph...
User offline. Last seen 2 years 35 weeks ago. Offline
Joined: 10 Jul 2005
Posts: 1347
Groups: None
Hello George,

I know this does answer your question.

How come your in th IT then you find interest in Piping activities.

I’m just curious.

Cheers,

Charlie