Primavera License

2 replies [Last post]
Tom Tom
User offline. Last seen 7 years 6 weeks ago. Offline
Joined: 17 Aug 2014
Posts: 31
Groups: None

I currently have a single Primavera license. I installed my Primavera database on my home server as I have had my laptop crash several. The problem is that sometimes I work from places with poor internet connection so I created another local database on my laptop. The check in/out makes it easier to sync the schedule back into the central database once I get a good internet connection. Do I need to buy an additional license for the second database. I believe I saw something in the oracle agreement saying every system requires a license or something like that. Any thoughts?

Replies

Tom Tom
User offline. Last seen 7 years 6 weeks ago. Offline
Joined: 17 Aug 2014
Posts: 31
Groups: None

Primavera license has changed since it was acquired by Oracle. The license enforcement is now open ended. You dont need to enter your license information to use P6 software. Anyone can now download and use the software. You just have to make you obtain a license for every user. How can Oracle trust people that much?

Dennis Hanks
User offline. Last seen 9 years 20 weeks ago. Offline
Joined: 17 Apr 2007
Posts: 310

 

 

Not sure of current requirements, so disregard. Years ago, when Primavera was not Oracle, I got written permission to install on both PC and laptop, as long as it was single user. Same for Pertmaster (PRA). Have you tried contacting them?