•Schedules
Engineering Schedule – I developed the level 4 logic driven engineering schedules in Primavera. The schedule was resource loaded with man-hours.
•Documents, Progress, Cost & Man-hour tracking and reports
Developed detail Basis of Schedule document
Developed Progress Reports – Setup weekly and monthly reports consisting of narrative, S-Curves, Schedule, Cost & Man-hour Report, PAAF Register and Progress Analysis Report.
Developed CTR (Cost, Time & Resource) & “InControl”