Aker Solutions Planner
START Date:
August, 2009 Company : Aker Solutions Contracting AS
Type : Heavy Construction – Oil & Gas (EPC Contractor).
Project : Hook-Up and Installation Project.
AGIP KCO Project, Kashagan Offshore, Island D & A
Oilfields, Kazakhstan.
Duration : august 09 – till date (position changed).
Designation : Project Planner
Responsibilities:
• EPCI – Reporting
• Working on Safran software
• EPCI meeting
• Deviation report
Company : Aker Solutions Contracting AS
Type : Heavy Construction – Oil & Gas (EPC Contractor).
Project : Hook-Up and Installation Project.
AGIP KCO Project, Kashagan Offshore, Island D & A
Oilfields, Kazakhstan.
Duration : july 08 – till date.
Designation : QA/QC – Lead Engineer (Doc. Regulatory according
to GOST (local) standard)
Responsibilities:
• To maintain all the Quality Control documents as per GOST Standard RoK Snip Regulations (Mechanical , Welding, Painting, Electrical, Civil)
• To prepare Hidden Works Acts & Act of acceptance of Executed works .
• To organize meeting with Firecon ( 3rd part of Agip) & NIPI Nefte Gas (Author inspection) .
• To organize internal meeting inside of QA/QC team
• To prepare Work Log Books of all disciplines
• Preparation of Documents for Hydro testing (Steam Boilers , Vessels , Pipelines)
Company : Bateman Kazakhstan LLP
Type : Heavy Construction – Oil & Gas (EPC Contractor).
Project : Power Generation Plant & Utilities Construction Project.
AGIP KCO Project, Karabatan Oilfields, Kazakhstan.
Duration : December 05 – till July 08.
Designation : QA/QC – Regulatory Acts Coordinator.
Responsibilities:
• To maintain all the Quality Control documents as per the RoK SNiP regulations.
• To maintain all Quality Control documents as per the GOST GorTechNadzor regulations.
• To check all the Hidden Works Acts & Act of Acceptance of Executed Works and ensure their conformance with the RoK regulations.
• To maintain the Inspection Test Plans (ITP), maintain and update daily work logs for all the live work locations.
• To prepare various Work Logs necessary per the regulations of RoK.
• To coordinate the submission if the Works logs to the Client, local Government Design Institutes (KazNIPI & KazEnergoProm), Marine Inspection (Local Technical Inspector).
• To prepare Hand-Over Acts to Subcontractors.
• To prepare the Punch Lists.
• To coordinate with Subcontractors on all the Technical document preparation and submission.
• To participate in the Audit meetings on Executive Works; to discuss about observations & comments by the Client’s Consultants on the Quality Control Documents.
Company : Punj Lloyd Kazakhstan
Type : Heavy Construction – Oil & Gas (Sub - Contactor).
Project : Large & Small Bore Pipeline Project
TengizChevrOil (TCO) Asset Development Project,
Tengiz Oilfields, Kazakhstan.
Designation : Work Permit Coordinator
Duration : Aug. 2004 – Nov. 2005.
Responsibilities:
• To coordinate with Client and main Contractor representatives in obtaining permits (General Work Permit, Hot Work Permit, Confined Space Work Permit, Excavation Work Permit & Safety Task Analysis) to work at site.
• To ensure conformance of site activities to the stated norms in the approved Permits.
• Translations of Technical documentations, Work Permits, Contracts, General Letters, faxes, etc.
• Interpretation of verbal communications between Experts and Locals.
Company : Intertech Medical Assistance Ltd.
Type : Medical Services.
Project : Medical Department – Petro Kazakhstan
Kyzylorda, Kazakhstan.
Designation : Interpreter
Duration : Feb. 2004 – Mar. 2005.
Responsibilities:
• Translation of Conversations for Medical staff involved in First-Aid Training
• Translation of Medical documentation related to First Aid Trainings.
Company : Petro – Kazakhstan Kumkol Resources
Designation : Translator - Intern
Duration : Oct. 2003 – Nov. 2003.
Professional Trainings undertaken:
1. Work Responsible Person (WRP): Asserting that a person is competent as per TCO standards, to be in charge of a work area. Responsible for the execution of work in TCO oilfields.
2. Safety Task Analysis (STA): Asserting that a person understands the risks involved while working in TCO oilfields and knows what remedial measures are to be taken in case of an incident.
3. First Aid Training: Asserting that the person has knowledge of first aid treatment in case of an accident at site. Certified by SOS International.
4. Safety Trainings: Work at Height, Work at depth, Work in H2S prone areas, TCO/PFD Safety Trainings, Safety Leadership Training (SLT) – Fluor Daniel.
5. Blue book (HSE): Asserting that a person understands the risks involved while working in Oilfields and knows what remedial measures are to be taken in case of an incident.
6. BOSEIT : Asserting that a person understands the risks involved while working in Offshore project and knows what remedial measures are to be taken in case of an incident.
7. CTR Training ; Supervisor & Management training
Educational Qualification:
• 2009: CC PMSOFT Microsoft Corporation, Moscow Project Management University, University PMSOFT Group of Companies , Almaty branch
Primavera PMI Provider ID # 1492
PMI Program number # 601; # 602; #603
• 2005: Second High Diploma in Financial Studies from Kyzylorda State University, Kyzylorda.
• 2004: High Diploma in Translation & Office Management from Kyzylorda State University, Kyzylorda
Languages : Kazakh (Native), Russian, English & currently learning Italian.
Computer Proficiency : MS Office – Word, Excel, Power Point, Outlook; PDF Adobe.
References : Can be presented on request.
Contact Information:
Address : 3/27, Micro District “Merei”,
Kyzylorda City, Republic of Kazakhstan
Phone : +7 701 457 44 40 / +7 700 401 08 98
Email : galiya_2us@mail.ru; galiyaz@gmail.com
Type : Heavy Construction – Oil & Gas (EPC Contractor).
Project : Hook-Up and Installation Project.
AGIP KCO Project, Kashagan Offshore, Island D & A
Oilfields, Kazakhstan.
Duration : august 09 – till date (position changed).
Designation : Project Planner
Responsibilities:
• EPCI – Reporting
• Working on Safran software
• EPCI meeting
• Deviation report
Company : Aker Solutions Contracting AS
Type : Heavy Construction – Oil & Gas (EPC Contractor).
Project : Hook-Up and Installation Project.
AGIP KCO Project, Kashagan Offshore, Island D & A
Oilfields, Kazakhstan.
Duration : july 08 – till date.
Designation : QA/QC – Lead Engineer (Doc. Regulatory according
to GOST (local) standard)
Responsibilities:
• To maintain all the Quality Control documents as per GOST Standard RoK Snip Regulations (Mechanical , Welding, Painting, Electrical, Civil)
• To prepare Hidden Works Acts & Act of acceptance of Executed works .
• To organize meeting with Firecon ( 3rd part of Agip) & NIPI Nefte Gas (Author inspection) .
• To organize internal meeting inside of QA/QC team
• To prepare Work Log Books of all disciplines
• Preparation of Documents for Hydro testing (Steam Boilers , Vessels , Pipelines)
Company : Bateman Kazakhstan LLP
Type : Heavy Construction – Oil & Gas (EPC Contractor).
Project : Power Generation Plant & Utilities Construction Project.
AGIP KCO Project, Karabatan Oilfields, Kazakhstan.
Duration : December 05 – till July 08.
Designation : QA/QC – Regulatory Acts Coordinator.
Responsibilities:
• To maintain all the Quality Control documents as per the RoK SNiP regulations.
• To maintain all Quality Control documents as per the GOST GorTechNadzor regulations.
• To check all the Hidden Works Acts & Act of Acceptance of Executed Works and ensure their conformance with the RoK regulations.
• To maintain the Inspection Test Plans (ITP), maintain and update daily work logs for all the live work locations.
• To prepare various Work Logs necessary per the regulations of RoK.
• To coordinate the submission if the Works logs to the Client, local Government Design Institutes (KazNIPI & KazEnergoProm), Marine Inspection (Local Technical Inspector).
• To prepare Hand-Over Acts to Subcontractors.
• To prepare the Punch Lists.
• To coordinate with Subcontractors on all the Technical document preparation and submission.
• To participate in the Audit meetings on Executive Works; to discuss about observations & comments by the Client’s Consultants on the Quality Control Documents.
Company : Punj Lloyd Kazakhstan
Type : Heavy Construction – Oil & Gas (Sub - Contactor).
Project : Large & Small Bore Pipeline Project
TengizChevrOil (TCO) Asset Development Project,
Tengiz Oilfields, Kazakhstan.
Designation : Work Permit Coordinator
Duration : Aug. 2004 – Nov. 2005.
Responsibilities:
• To coordinate with Client and main Contractor representatives in obtaining permits (General Work Permit, Hot Work Permit, Confined Space Work Permit, Excavation Work Permit & Safety Task Analysis) to work at site.
• To ensure conformance of site activities to the stated norms in the approved Permits.
• Translations of Technical documentations, Work Permits, Contracts, General Letters, faxes, etc.
• Interpretation of verbal communications between Experts and Locals.
Company : Intertech Medical Assistance Ltd.
Type : Medical Services.
Project : Medical Department – Petro Kazakhstan
Kyzylorda, Kazakhstan.
Designation : Interpreter
Duration : Feb. 2004 – Mar. 2005.
Responsibilities:
• Translation of Conversations for Medical staff involved in First-Aid Training
• Translation of Medical documentation related to First Aid Trainings.
Company : Petro – Kazakhstan Kumkol Resources
Designation : Translator - Intern
Duration : Oct. 2003 – Nov. 2003.
Professional Trainings undertaken:
1. Work Responsible Person (WRP): Asserting that a person is competent as per TCO standards, to be in charge of a work area. Responsible for the execution of work in TCO oilfields.
2. Safety Task Analysis (STA): Asserting that a person understands the risks involved while working in TCO oilfields and knows what remedial measures are to be taken in case of an incident.
3. First Aid Training: Asserting that the person has knowledge of first aid treatment in case of an accident at site. Certified by SOS International.
4. Safety Trainings: Work at Height, Work at depth, Work in H2S prone areas, TCO/PFD Safety Trainings, Safety Leadership Training (SLT) – Fluor Daniel.
5. Blue book (HSE): Asserting that a person understands the risks involved while working in Oilfields and knows what remedial measures are to be taken in case of an incident.
6. BOSEIT : Asserting that a person understands the risks involved while working in Offshore project and knows what remedial measures are to be taken in case of an incident.
7. CTR Training ; Supervisor & Management training
Educational Qualification:
• 2009: CC PMSOFT Microsoft Corporation, Moscow Project Management University, University PMSOFT Group of Companies , Almaty branch
Primavera PMI Provider ID # 1492
PMI Program number # 601; # 602; #603
• 2005: Second High Diploma in Financial Studies from Kyzylorda State University, Kyzylorda.
• 2004: High Diploma in Translation & Office Management from Kyzylorda State University, Kyzylorda
Languages : Kazakh (Native), Russian, English & currently learning Italian.
Computer Proficiency : MS Office – Word, Excel, Power Point, Outlook; PDF Adobe.
References : Can be presented on request.
Contact Information:
Address : 3/27, Micro District “Merei”,
Kyzylorda City, Republic of Kazakhstan
Phone : +7 701 457 44 40 / +7 700 401 08 98
Email : galiya_2us@mail.ru; galiyaz@gmail.com
- Company:
- Industry:
- Region: