Position: Planning Engineer; Cost Control Engineer/Estimator, CHEMIMONTAZH LTD, Kazakhstan, TengizChevrOil Crude Export Project

START Date: 
May, 2005
END Date: 
April, 2007

I was involved in a project of Tengizchevroil as a Planner/Scheduler (Chevron Corporation), namely the Crude Export Project; I worked together with the planning team of TCO as the leader of Contractor’s planning team; I coordinated scheduling of the civil, electrical and piping works; all schedules had to be made in P3 format; my part time duty was also to manage contract issues and develop and monitor the project controls; I also had knowledge of US construction industry techniques

Planning Engineer; Cost Control Engineer/Estimator, ATCS - HILLSON DIVISION LTD, Kazakhstan, Several Agip KCO and TengizChevrOil Projects

START Date: 
May, 2007

1. 2010 to present; Agip KCO – Dietsmann SpA: Lagoon Mechanical Evaporator System civil, mechanical and electrical works

I was actively contributed to the elaboration of tender quotation from the project starting and developed the WBS of schedule, the project controlling and reporting system based on S-Curve analysis by earned value, collecting and checking data on site for the continuous progress analysis and for maintaining the project schedule

Askhat Khairullin

First Name: 
Askhat
Last Name: 
Khairullin

I am good teamplayer. Currently work in multinational company.

Professional Since: 
Oct-2008 (16.6 yrs experience)
Years Experience: 
0

Yuriy Kitarov

First Name: 
Yuriy
Last Name: 
Kitarov
Oldest experience: 
May 2009 (16.0 yrs experience, WARNING: 39.3 years variance with Professional Since)
Years Experience: 
40

PLANNING ENGINEER, KPO b.v., Plant shutdown maintenance

START Date: 
May, 2009

Planning Engineer  

- Implementation and preparation of Units shutdown planning, planned preventive and corrective maintenance, opportunity based planning, campaign maintenance and development planning.

- Development of reports, monitoring progress against plan.

- Tracking the list of material delivery for shutdown activities in support of the planning activity (Bookies board).

- Prepare the 4 weeks look ahead integrated plan,3 days look ahead during shutdown

- Major

Surendra Singh

First Name: 
Surendra
Last Name: 
Singh
Oldest experience: 
Jun 2001 (23.9 yrs experience, WARNING: 31.4 years variance with Professional Since)
Years Experience: 
9

Planning Manager, KazStroy Service, Oil & Gas Projects

START Date: 
June, 2001

 

  1. OIL LOADING TERMINAL FOR ZAIKHMUNAI
  2. KARACHAGANAK–URALSK GAS PIPELINE FOR KARACHAGANAK PETROLEUM OPERATING
  3. CHINAVORSKOE OIL & GAS CONDENSATE FIELD PROJECT FOR ZHAIKMUNAI

Chief Manager (Project Management) of the company.

Cristian Iorgulescu

First Name: 
Cristian
Last Name: 
Iorgulescu

Senior Planning Engineer, 43 years old, with more than 15 years experience in Oil and Gas sector, presently working as Planning Coordinator for Saipem in Kazakhstan.

I'm looking forward for continuous professional development, keeping in touch with other professionals and the latest news / technology in our field of activity.

For any further details please contact me on cristi_iorgulescu@yahoo.com

Cheers,

Professional Since: 
Aug-1994 (30.8 yrs experience)
Oldest experience: 
Aug 1994 (30.8 yrs experience)
Years Experience: 
16
Guild Accreditation: 
GPC Member
GPC Member Since: 
Fri, 2016-05-27 (All day) - Wed, 2055-05-05 (All day)

CONSTRUCTION/PLANNING ENGINEER, INDUSTRIALEXPORT, OIL-GAS SEPARATION PLANT AT AKSHABULAK, KAZAKHSTAN

START Date: 
May, 1998
END Date: 
December, 1999

CONSTRUCTION/PLANNING ENGINEER at AKSHABULAK, KAZAKHSTAN

Project: OIL-GAS SEPARATION PLANT mainly consisting of: Manifold, Separator Vessel, Scrubber Vessel, Heat Exchangers, Oil Storage Tanks, Pipe Rack, Flare System, Transfer Pump Houses, Booster Pump House, Pig Launcher and Pig Receiver skids, Diesel Generator Sets and Diesel Storage tanks, Water Treatment Plant, Air Compressors, PLC, Fire Fighting facilities and Water Storage Tanks, etc.
Client: RWE-DEA (GERMANY).

Responsibilities:

Supervising, coordinating an

SNR PLANNING ENGINEER, Saipem, CONSTRUCTION FOR KASHAGAN OIL FIELD

START Date: 
September, 2005
END Date: 
April, 2007

SNR.PLANNING AND CONTROL ENGINEER

Company activity field:Onshore and Offshore Oil and Gas facilities construction.

Project:PIPE RACKS, PILES, FLARES, JACKETS, BARGES construction and Load Out at Kuryk Base, Kazakhstan (onshore) for Kashagan Oil Field (offshore).

Client:AKCO (AGIP Kazakhstan Oil Company).

Responsibilities:

Developing L4-5 Project Schedule, using PRIMAVERA PROJECT PLANNER v 3.1.

Progress monitoring and measurement.

P3 schedule updating and analysis again