Guild of Project Controls: Compendium | Roles | Assessment | Certifications | Membership

UK-North West (Region)

Alan Turner

First Name: 
Alan
Last Name: 
Turner

Alan served his time as a Plater / Templatemaker for a Fabrication and Construction company in Greater Manchester in the 1970's, he has 10 years Structural steel fabrication experience with exposure to Structural detailing from GA's to programming NC Drilling machines in the UK.

Professional Since: 
Dec-2011 (12.4 yrs experience)
Years Experience: 
0

Senior Planning Engineer, RLB | Rider Levett Bucknall, Various Projects (Safety Improvements / Product Diversification / Obsolesence)

START Date: 
April, 2013

Responsible for producing credible, fully resourced and costed project schedules for various projects (modification - production / safety related, replacement of obsolete equipment, new processes).

Maintaining schedules current, and reporting deviations.

Producing KPIs.

Experience Hours (Planning & Scheduling): 
1400

Senior Planning Engineer, Simon Carves Ltd., New Build Polyethylene Plant for China

START Date: 
April, 2012
END Date: 
March, 2013

Responsible for:

Producing a credible, fully resourced and costed project schedule.

Maintaining schedule progress.

Highlighting areas of concern re; progress.

Producing KPIs.

Experience Hours (Planning & Scheduling): 
2000

Stuart Clarke

First Name: 
Stuart
Last Name: 
Clarke

I am Stuart Clarke i am 25 years old and I work for NG Bailey, Manchester Branch (UK). I have worked for NGB for 9 years this year (2014), serving four of them as an apprentice in heating and ventilation. I have recently moved off the tools to start a new career path in Planning so to date my experience is very limited, however I hope to develop my skills and become successful in this area.

I am currently working on Beacon Barracks Redevelopment Project, using Primavera P6 software, so any tips, hints, tricks would be very welcome if they could help me progress!

Professional Since: 
Aug-2005 (18.7 yrs experience)
Oldest experience: 
Mar 2014 (10.1 yrs experience, WARNING: 8.6 years variance with Professional Since)
Years Experience: 
44

Project Planner, N G Bailey & Co, Georges Dock Building, Liverpool

START Date: 
March, 2014

Georges Dock Building, Liverpool UK

The Georges Dock Building based in Liverpool UK was refurbishment project, converting unused office/storage space into a brand new, state of the art combined control room for Mersey Travel (Client) & Merseyside Police for the overseeing of the Mersey Tunnels.

The main use of the building itself is to supply fresh air, and extract fumes from the tunnels it is linked to however, it was the offices contained within the actual building that were being transformed. 

My ro

Experience Hours (Planning & Scheduling): 
350

EPM Consultant, Deltek, Various

START Date: 
February, 2008
END Date: 
February, 2010

A U.S. owned Software Company specialising in the tools and processes to facilitate effective Project/Programme Management.

Internally

·       Helped devised and implemented the group’s European EPM strategy.

·       Provide support to the sales teams in toolset demonstrations.

·       Provide support for the sales teams in EVM, Project and Programme Management solutions.

Experience Hours (Planning & Scheduling): 
1000
Experience Hours (Cost Management): 
3000

Senior Project/Program Planner, Iberdrola Engineering&Construction (Scottish Power), Portfolio of Network projects including substation, Overhead Line and U/G Cabling

START Date: 
April, 2012
END Date: 
March, 2014

·         Develop, maintain, monitor and update a multiproject program including Substation and Over head line (OHL) projects

·         Create rolled-up programmes and reports due to the nature of the job (up to 25 projects)

Experience Hours (Planning & Scheduling): 
4000

Ken Nems

First Name: 
Ken
Last Name: 
Nems
Professional Since: 
Jun-1988 (35.9 yrs experience)
Years Experience: 
0

P6 System Administrator, BAE Surface Ships, Shipbuilding

START Date: 
May, 2008
END Date: 
April, 2013
Duties include the setup, structure, administration and security of both Primavera P6 and Artemis Project View. Also assisted in the implementation of Project Genesis (replacement of all legacy systems) across BAE (Barrow & Southern Sites). Day to day duties also require me to set, monitor and cover an in-house developed ‘Job Scheduler’. This enables batched jobs to be run out of hours to minimise downtime on the Planning Systems databases.

P6 system Administrator, BAE Surface Ships, Shipbuilding

START Date: 
May, 2008
END Date: 
April, 2013
Duties include the setup, structure, administration and security of both Primavera P6 and Artemis Project View. Also assisted in the implementation of Project Genesis (replacement of all legacy systems) across BAE (Barrow & Southern Sites). Day to day duties also require me to set, monitor and cover an in-house developed ‘Job Scheduler’. This enables batched jobs to be run out of hours to minimise downtime on the Planning Systems databases.

Market Place

Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher. Teach yourself using on-line or book based learning or run your own in-house or public courses.
Syndicate content