Quantity Surveyor, Heriot-Watt University, Bank Muscat HQ

START Date: 
April, 2009

Past experince working as a Quantity Surveryor with a clinet in Oman. Nowadays studying for a MSc in Quantity Surveying at the Heriot-Watt University, Edinburgh. 

QUANTITY SURVEYOR, SOUTH WEST ARCHITECTURE, 2B+G+2P+26 HOTEL BUILDING

START Date: 
January, 2009

Pre Contract Stage:-

 

1.       Prepare a Sketch Stage Report including;

a.       Estimate of the total cost for the works at present prices based on the area, volume or some typical unit

2.       Prepare tender and contract documents as necessary for the surveys, studies or tests,

3.       analyze and report on tenders received

QUANTITY SURVEYOR, SOUTH WEST ARCHITECTURE, 2B+G+2P+26 HOTEL BUILDING

START Date: 
January, 2009

Pre Contract Stage:-

 

1.       Prepare a Sketch Stage Report including;

a.       Estimate of the total cost for the works at present prices based on the area, volume or some typical unit

2.       Prepare tender and contract documents as necessary for the surveys, studies or tests,

3.       analyze and report on tenders received

quantity surveyor, turner & townsend, Delhi metro

START Date: 
February, 2006
END Date: 
June, 2013

Cost Management, Contract management, Tendering, Quantity surveying, Cost Estimation, BOQ preparation

QUANTITY SURVEYOR, DKP LTD, CENTENARY BANK HEADQUARTERS

START Date: 
June, 2013

QUANTITY SSURVEYOR IS MY DESIGNATION AT THE COMPANY WHERE I CURRENTLY WORK.

Quantity Surveyor, Daito Construction Co. Ltd., Omuta-Saga Bridge

START Date: 
November, 1999
END Date: 
October, 2001

As a Quantity Surveyor (1999 to 2001), I was Tasked to handle jobs related to quantifying and tracking project activities for the construction of two span river crossing bridge connecting the city of Omuta, Fukuoka prefecture and Jojima, Saga Prefecture:

§  Quantity Take-Off (from IFC Drawing) and mark-up and record any variance for Claims

§  Prepares and submit quantity appraisal on every activity being done pertaining to civil, Mechanical and electrical Works.

Quantity surveyor, AL RAJHI CONSTRUCTIONS, Improvement of 5th Industrial intechange ,Sharjah Ring road and Tie in with Dubai

START Date: 
January, 2012

2006 April  - 2008 April:   M/S.Al Muhairy General Contracting Co  Abu Dhabi ,U.A.E

Position Held

:

Quantity Surveyor

Project

Quantity surveyor, AL RAJHI CONSTRUCTIONS, Improvement of 5th Industrial intechange ,Sharjah Ring road and Tie in with Dubai

START Date: 
January, 2012

2006 April  - 2008 April:   M/S.Al Muhairy General Contracting Co  Abu Dhabi ,U.A.E

Position Held

:

Quantity Surveyor

Project

Quantity surveyor, AL RAJHI CONSTRUCTIONS, Improvement of 5th Industrial intechange ,Sharjah Ring road and Tie in with Dubai

START Date: 
January, 2012

2006 April  - 2008 April:   M/S.Al Muhairy General Contracting Co  Abu Dhabi ,U.A.E

Position Held

:

Quantity Surveyor

Project

Quantity Surveyor, KWAZY Engineering and Construction, Offices, Building and Warehouses

START Date: 
March, 2002
END Date: 
July, 2008

Prepare monthly billing statement for project assigned.

Review bills from SUbcontractor.

Serves as a Document Controller.