Guild of Project Controls: Compendium | Roles | Assessment | Certifications | Membership

SOUTH WEST ARCHITECTURE

Tony Jayathilake

First Name: 
Tony
Last Name: 
Jayathilake
Oldest experience: 
Mar 2010 (14.1 yrs experience, WARNING: 40.2 years variance with Professional Since)
Years Experience: 
3

Estimator / Quantity Surveyor, SOUTH WEST ARCHITECTURE, Six Star Hotel- 2B + G + PODIUM + 25 HOTEL BUILDING WEST BAY LAGOON (Falcon Tower) Project Handled Doha Qatar.

START Date: 
March, 2010

Checking variations, payment certificates, solving contractual issues and negotiating with contractor based on conditions of contract

Gishan Kandegedara Manannalage

First Name: 
Gishan
Last Name: 
Kandegedara Manannalage
Oldest experience: 
Jan 2009 (15.3 yrs experience, WARNING: 39.0 years variance with Professional Since)
Years Experience: 
4

QUANTITY SURVEYOR, SOUTH WEST ARCHITECTURE, 2B+G+2P+26 HOTEL BUILDING

START Date: 
January, 2009

Pre Contract Stage:-

 

1.       Prepare a Sketch Stage Report including;

a.       Estimate of the total cost for the works at present prices based on the area, volume or some typical unit

2.       Prepare tender and contract documents as necessary for the surveys, studies or tests,

3.       analyze and report on tenders received

QUANTITY SURVEYOR, SOUTH WEST ARCHITECTURE, 2B+G+2P+26 HOTEL BUILDING

START Date: 
January, 2009

Pre Contract Stage:-

 

1.       Prepare a Sketch Stage Report including;

a.       Estimate of the total cost for the works at present prices based on the area, volume or some typical unit

2.       Prepare tender and contract documents as necessary for the surveys, studies or tests,

3.       analyze and report on tenders received

Market Place

Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher. Teach yourself using on-line or book based learning or run your own in-house or public courses.
Syndicate content