Senior Panning Engineer, Descon Engineering Qatar, Shutdown Maintenance of LNG Plant

START Date: 
March, 2004

SABIR HUSSAIN

Plot # 1/A, Pink Comfort, Roshan colony                                                        

Flat # 304, Soldier Bazar # 2, Karachi  Pakistan.
Cell #1: 00974-74006313

Cell # 2: 00974-77761963 and Cell # 3: 0092-3002446179
Email :  sabirjiwani@hotmail.com

sabirhussainjiwani@gmail.com                                                                                                                                            

                                                                                     Objective:

 Working on a mission of personal development by taking up challenging assignments keeping in view a goal of career building in Oil & Gas / Petrochemical / Power  Plant assuring to provide effective maintenance and construction services by planning and systematic approach.

                                         

Technical Qualification:

 Bachelor of Engineering (B.E Mechanical)

From NED University of Engineering Science and Technology Karachi in 1999.

 Additional Qualification

 Executive MBA, Major in General Management

From Preston Institute of Management of Science and Technology Karachi in 2003.

 

FINAL YEAR DESIGN PROJECT

Energy Conservation:  Design a Rotary Regenerative Heat Exchanger

for recover heat from exhaust.

  

JOB EXPERIENCE

 

DESCON Engineering Qatar LLC

CLIENT:  Qatar Gas / Ras Gas / Dolphin Energy Ltd .

DESIGNATION:  Sr. Engineer (Mechanical)  

PERIOD: - May 2012 to Present

  • PROJECT:- Presently working as a Planning Engineer (offshore) in plant services for  preventive maintenance and offshore shutdown planning of Dolphin Energy Ltd.
  • Worked as a Lead Planning Engineer (onshore / offshore) in plant services department for modification , maintenance and shutdown turnaround planning of Qatar Gas & Ras Gas LNG Plant.

Responsibilities                                                                                          I

Preparation and finalization of scope of work for routine maintenance and planned shutdowns.

  • Weekly meeting with project manager and team to discuss and resolve issues.
  • Preparation of detailed integrated Level IV and Level 6 Plan using MS Projects & Primavera 6.0 as per Client requirement.
  • Estimate manpower, spares/material in consultation with Execution Engineers
  • Responsible to analyze schedule status, physical progress, man-hours consumption, productivity, network logic, work sequence and three weeks and Four months look ahead plans.
  • Preparation of bar charts, precedence networks, planning "S" curves, and other project planning management tools.
  • Attending Weekly meetings with Client and Sub-contractor to co-ordinate disciplines design and construction effort.
  • Submit report to the Client management and in-house management against planned activities, identifying the problem areas, critical indicators and possible solutions Daily , weekly and monthly as per client requirement.
  • Preparation of Budget of maintenance work and planned Shutdown and cost analysis according to resource needed for Job.
  • Costing and Estimation of Additional job other than base scope.
  • Monitoring the spares/materials purchasing and delivery schedule and follow up the material requirement with Procurement / commercial department.
  • Responsible for reviewing schedule matters, coordinating with field Discipline Engineers for practical remedial measures in timely manner.
  • Responsible for defining the Job Responsibilities of each craft down the line before execution of work.
  • Assistance in preparations of Test Package.  
  • Raise the requirements of construction items and operational consumables and tools and ensure the presence of required resource at workplace before execution of work.
  • Responsible in developing different what-if-analysis, case studies, recovery plans and project progress presentations.
  • Responsible for the preparations of scope for Sub-Contractor and follow up of finalization of Sub-Contractor along with Contract Engineer after approval of management.
  • Responsible for subcontractor’s resources analysis and planning.
  • Responsible to approve Subcontractor’s physical progress, schedule, and valuation.
  • Preparations of Lesson learnt and Observations & Recommendations for future work.

 

DESCON Engineering UAE.

CLIENT:  ADGAS Das Island      

DESIGNATION: - Planning Engineer.

PROJECT: - ADGAS Major plant overhaul .

PERIOD: - Jan 2012 to April 2012.

 

  • PROJECT:- (1) Worked for the Project planning of major overhaul Shutdown maintenance in ADGAS LNG plant.

 

Responsibilities                                                                                          I

 

  1. Visit plant as needed to get conversant with the area .
  2. Pre-engineering of R & Rs, WRs, MMC, MODs.
  3. Study static and rotating equipments scope.
  4. Ordering of materials for above in co-ordination with materials controller.
  5. For static equipment if any materials are found not ordered, co-ordinate with engineering dept.
  6. Estimate areas and quantities for painting, insulation, refractory as applicable.
  7. Estimate quantities for scaffolding pipes, fittings, boards and ladders.
  8. Prepare net works for all new jobs and modify networks for existing ones.
  9. Prepare project activities and scheduling in Primavera P6.
  10. Identify critical jobs and prepare method statements, TRA etc.
  11. Identify critical lifting jobs, get the lifting studies and related paper work done.
  12. Collect drawings and details pertaining to the individual areas and workscope.
  13. Prepare scope of work from the beginning and keep updating the same in regularly.
  14. Prepare main work book from the beginning and update regularly.
  15. Update weekly all status report / registers for all R&R, WRs, MODs and MMC.
  16. Go through spading list, make amendments / corrections as needed in consultation with Engineering dept of ADGAS.
  17. Prepare spading diagram as needed for individual equipment / piping works.
  18. Identify cold insulation work in R & R, WRs, MODs, MMC spading locations and Static equipments.
  19. Prepare Turnaround Village plan.
  20. Prepare tags and have them secured at site locations for various jobs.

SEFEC Engineering  (Pvt)  Ltd Karachi.

CLIENT:  Pakistan Refinery Limited Karachi.

DESIGNATION: - Deputy Manager Project.

PROJECT: - Major Repair of Steel Storage Tanks.

PERIOD: - March 2011 To Nov 2011.

  • PROJECT:- (1) Worked for the major repair of Steel Storage tank as per API653 at Pakistan Refinery Limited.

(2) Worked for the Erection, Installation and Commissioning of Steel structure at US-Embassy Islamabad..

(3) Worked for the Preparation of Contract / Proposal documents for PRL,OMV Pakistan, Attock Refinery Ltd and Futehally Chemical Pvt Limited.

 

Responsibilities                                                                                          I

 

1. Ensure through on-site supervision that the construction works are undertaken to required designs, specifications, standards and HSQE requirements.

2. Manage / supervise the sub-contractor under the EPC contract and be the nominated ‘Supervisor’. As assigned by Project Manager undertake contract administration, e.g. issue PM instructions to the Contractor and facilitate fair and reasonable resolution of compensation events and variations.

3. Monitor site progress including installation of required equipment against Accepted Programmes and 2-4 week look-ahead programs. Make recommendations where extra resource or alternative work processes are required to maintain or increase performance.

4. Monitor project cost and provide Project Manager with timely identification of deviations from budget.

5. Ensure that quantities of completed work items are agreed with the sub-Contractor.

6. Ensure maintenance of daily records of all site activities, including information on labour and plant, and any non-compliant materials or workmanship.

7. Identify problematic design issues and make recommendations that support engineering procedure as well as ensure the construction schedule is maintained.

8. Ensure Safety best practices are being utilized during all site activities

9. Co-ordinate construction activities and manage project interfaces.

10. Ensure that required liaison takes place with contractor, operational staff and other third parties.

11. Responsible for management of site team including personnel matters, staff training and development. Liaise with the Senior Construction Manager / Manager of Construction as appropriate.

 

Moody International Pvt Ltd Karachi.

DESIGNATION: - Construction Supervisor (Mechanical In-charge)

PERIOD: -  Nov 2010 to Feb 2011.

PROJECT: - Modification & Maintenance of British Petroleum Exploration and Production Plant facilities at MKP and Badin.

 

Byco Petroleum Pakistan Ltd Karachi.

DESIGNATION: - Sr. officer Project & Planning (Mechanical In-charge).

PERIOD: -  Oct 2007 to Oct 2010.

  • PROJECT: -. (1) Constructions of Pakistan biggest storage tanks as per API 650 and offsite utilities piping as per ASME B31.3. (2) Piping and Plant project works for the expansion of refining capacity of BPPL refinery from 18,000 bpd to 30,000 bpd.

(3) Worked for the up-gradation of refinery plant during shutdown and major turnaround revamp projects works of fuel oil and cooling water system , fuel gas system revamp, desalter relieve system etc. (4) Worked for the Construction of fire protection network piping in BPPL refinery plant. (5) Worked for the construction of on-shore SPM flow line of dia 28” as per API 1104 for Crude oil at BPPL refinery.

                  

RESPONSIBILITIES: -

  1. Follows all requirements of the company safety program, taking personal responsibility for safety in working environment. Promoting safety among peers, subordinates and supervisors.
  2. Interpreting design / drawing for construction & material procurement.
  3. Resolving drawing interpretation problems, conflicts, interferences and anomaly.
  4. Verifying that all completed construction complies with applicable codes, drawings, and specification, quality and safety requirements.
  5. Attending meetings with contractors and consultant to co-ordinate disciplines design and construction effort.
  6. Co-ordinate inspections with consultants and authorities as required by the contract.
  7. Inspect false work for conformance to design drawings and its rectifications.
  8. Monitoring progress throughout the construction process and comparing this with the projected schedule of work.

 

  1. Perform technical Evaluation of material and servicing contracts.
  2. Prepare Progress Schedule activity for completion the Projects, its follow up and timely execution.
  3. Invoice / Bills verification and check as per BOQ and Contract.
  4. Coordinate and correspondence with contractor and consultant for expedite and timely execution of project activities.
  5. Ensure construction work complies with all engineering standards, codes, specification,  design and best Engineering practices.
  6. Prepare monthly, weekly and daily progress report with S-curve and graphical presentation.
  7. Perform any other responsibility assigned by the immediate supervisor.

 

FWQ Enterprises (Pvt.) Ltd Port Qasim.

DESIGNATION: - Offshore Project Engineer

PROJECT: - Construction of Liquid Cargo terminal (Jetty) included Cross Country Pipe line  and piping Interchanges.

PERIOD: -  July 2006 to  Sep 2007

 

RESPONSBILITIES: -

1. Arrangement of Mechanical drawings and details for the assigned projects in coordination with consultants , contractors.

2. Participate in meetings with project team, consultant, contractors and others to resolve Engineering issues as needed.

3. Checking the feasibility reports and comprehensive time schedule for assigned Projects for initial planning, designing, tendering, budget approval and execution to handing over the projects.    

4. Monitoring the quality of work according to the standards timeline, codes, Specifications and procurement of materials as require.

5. Peparation of daily / weekly and monthly progress report.

 

Mapak Qasim Bulkers (Pvt) Ltd Port Qasim.

DESIGNATION: - Terminal Maintenance and Project Engineer

PROJECT: - Construction of Steel Storage tanks and Offsite Utility piping and Terminal Maintenance.

PERIOD: - Nov 2004 to June 2006.

 

RESPONSIBILITIES

  1. Fabrication of Storage Tanks, ducts, pipe alleys, handrails ,staircases and other

Miscellaneous fabrication Works. QC checks e.g Dimensional check, Dye Penetrate test, Radiography test etc according to <?xml:namespace prefix = st1 />API 650 and ASME Standards.

  1. Ensure that the storage tanks, pipelines, equipment, electrical systems and civil structure etc of Terminal are in sound condition.
  2. In case of any breakdown in the Terminal machinery, act promptly to rectify the defect in order to maintain smooth operation of the Terminal Utilities i-e Generators, Boiler , Compressors, pumps and other management facility.
  3. In case of any improvement required, discuss/ suggest/ submit proposal to Senior Executive for approval and/ or further actions.
  4. Ensure maintaining the general cleanliness and good housekeeping within the facility.
  5. Prepare feasibility for the upcoming projects for management review.
  6. Coordinate with contractors and terminal work-force to achieve the optimum efficiency for all engineering works being under taken within the terminal facility.
  7. Any other assignment given to me from time to time by Senior Executive.

 

Adnan Asdar & Associates (Pvt.) Ltd Karachi.

DESIGNATION: - Site Mechanical Engineer.

PROJECT: - Construction of Co-generation Power Plant.

PERIOD: -  July 2004 to Nov 2004.

 

SEFEC Engineering (Pvt.) Ltd Karachi.

CLIENT:  National Refinery Ltd, OMV Pakistan, PARCO, National Petro Carbon Ltd.

DESIGNATION: - Project Planning Engineer.

PROJECT:- Construction of Pressure Vessel, Heat Exchangers & Reactors.

PERIOD:- March 2004 to July 2004

 

RESPONSIBILITIES

1. Coordinating information for creating unique Program for individual Projects using MS Project

2. Preparation of Project Budget & Calculation of detailed man-hours, machine hours.

3. Preparation of project Cash flow.

4. Preparation of man power Calculation & utilization schedule.

5. Updating progress of work using MS Project.

6. Preparation of recovery program to catch up delays

7. Preparation of short term detailed schedule based on baseline schedule.

8. Attending meeting with Client and Sub-Contractor for resolving issue on Weekly basis.

 

Understanding of Standard Code:

 

  • API 650 & 653
  • ASME B31.3, B31.4, B31.8
  • API 1104
  • ASTM

 

 

Personal Profile:

 

        

  • Nationality              :-          Pakistani.
  • Date of Birth          :-           30-Sep-1972
  • CNIC #                   :-           42000-6367877-9
  • Passport #                :-          QT6898771.
  • Visa Status              :-          Work Visa         
  • Language Spoken    :-         English, Urdu & Gujarati

 

 

 Computer Proficiency:

 
  • Practically experienced with   Microsoft Windows, SAP , Internet, Smart Plant.

                                                            Microsoft Office (Word, Excel and PowerPoint)

                                                            Microsoft Project,

                                                            AutoCAD 2005,

                                                            Primavera P6.