Lead Estimator, Worley Parsons, Refinery and Industrial Plants Projects mainly Oil and Gas Clients

START Date: 
August, 2001
SUMMARY  

 

 

EXPERIENCE

Jan 1, 2013 - Present          Lead Estimator, Worley Parsons, Al-Khobar, Saudi Arabia

 

Projects:

 

Jan 17, 2009 – Dec. 31, 2012            Senior Estimator, Worley Parsons, Al-Khobar, Saudi Arabia

 

Projects:

 

Main Duties & Responsibilities:

Prepare Material Purchase Requisition (MR), and Material Technical Approvals (MTA)

 

Sept. 2006 – Nov. 2008       Planning Engineer, Arabian Fal Company, Ras Tanura, Saudi Arabia

 

Project:

 

Main Duties & Responsibilities:

(Management information system (MIS) being used in SRMD)

 

Aug. 2005 – Jul 2006           Project Inspector, Iligan City Waterworks System (ICWS), Iligan City, Philippines

 

Projects:

 

Main Duties & Responsibilities:

 

Feb 2004 – Aug 2005           Site Engineer, C.M. Furukawa Philippines Inc., Taguig City, Philippines

 

Project:

 

Main Duties & Responsibilities:

 

 

Aug 2003 – Feb 2004           Site Acquisition and Permitting Executive,EF Baldo & Associates, Pasig City, Philippines

 

Project:

 

Main Duties & Responsibilities:

 

Jan to Aug 2003                   Project Engineer II, JDL Construction/CAV Communication Philippines, Angeles City, Philippines

 

Project:

 

Main Duties & Responsibilities:

 

Aug 2001– Dec 2002           Engineer 1, RGL Construction, Caloocan City, Philippines

 

Project:

 

Main Duties & Responsibilities:

 

  • Four (4) years & seven (7) months  in Oil and Gas Projects Group of Worley Parsons Arabia Ltd. Co
  • Six (6)+ years in the Oil and Gas Industry primarily Saudi Aramco projects
  • Worked in Saudi Aramco’s Ras Tanura Refinery
  • Four (4) years & seven (7) months  in Oil and Gas Projects Group of Worley Parsons Arabia Ltd. Co
  • Six (6)+ years in the Oil and Gas Industry primarily Saudi Aramco projects
  • Worked in Saudi Aramco’s Ras Tanura Refinery for two (2)+ years
  • Eleven (11)+ years total professional working experience
  • Licensed Civil Engineer with 88% Licensure Board Exam Rating, Academic Scholar in University                
  • Familiar with International Engineering standards, codes and practices, Saudi Aramco Standards codes, practices and procedures and recognized estimating standards Richardson Cost Data, RS Means Cost Data, JS Page Estimating References and other industry estimating standards
  • Proficient in Microsoft Office Applications 2003, 2007, 2010 (Access, Excel, Word, PowerPoint, Outlook) and MS Project, SAP R3, Microstation V8, AutoCAD, Saudi Aramco AutoSACS,
  • Consistently delivered quality and complete costs estimates to various clients
  • Demonstrated strong ability to handle several projects at the same time
    • AL-KHAFJI JOINT OPERATIONS(Cost Estimation, RFQ Preparation, Vendor Coordination)
      • FEED for Khafji Well SCADA Change Order
    • MA’ADEN PHOSPHATE COMPANY (Cost Estimation, RFQ, MTO, Material Requisition Preparation, & Vendor Coordination)
      • AMP Additional Hydrogenation Reactor, AMP Stripper Strainer, PAP-01-K01-K03 Interconnection
    • S-CHEM (Saudi Chevron Phillips) GES Contract (Cost Estimation, Quantity Take Off & Material Technical Requisition Packages)
      •  
    • Saudi Aramco GES Contract (Cost Estimation, Qty Take Off & Material Technical Requisition)
      • BI-10-00633 Upgrading Abqaiq Transmission Lines, Abqaiq, Saudi Aramco
      • BI-10-01247 Upgrade Power Supply Marjan GOSPS, Safaniyah, Saudi Aramco
      • BI -10-00273 Long Haul Communications For Corporate Data Center, Dhahran, Saudi Aramco
      • BI- 10-00450 Manifa DCO , Tower And Security Facilities – Manifa, Saudi Aramco (Sumitomo LSTK)
      • BI-25-00010  Replace Control System at KKIA, Riyadh, Saudi Aramco
      • BI-10-00688 Sulfur Handling & Export – Berri Gas Plant, Saudi Aramco
      • Other Miscellaneous GES Projects involving piping, instrumentation, HVAC, structural, process, mechanical, communication and electrical discipline.
    • AL-KHAFJI JOINT OPERATIONS(Cost Estimation, RFQ Preparation, Vendor Coordination)
      • FEED for Khafji Well SCADA
    • SATORP – GCC, Jubail Export Refinery Package 8  Pipeline & Off Plot Facility  a Jubail Export Zone, KSA (Material Requisition)
    • Ibn Sina POM (Polyoxymethylene) FEED project  (Cost Estimate- Bulk Materials)
    • Ras Tanura Integrated Project (RTIP), Saudi Arabia (Preparation of MTO'S for Tank Farm Area)
    • S-Chem (Saudi Chevron Phillips) GES Contract (Cost Estimation, Quantity Take Off & Material Technical Requisition Packages)
    • Reporting directly to Project Manager/s, and in close coordination with Lead Engineers; main duties and responsibilities are:
    • Provide Expenditure Request (ER) Estimates / cost estimates
    • Review and determine the class of cost estimate required and the intent of the cost estimate
    • Define project inputs, outputs and design criteria necessary for the desired cost estimate accuracy
    • Collect equipment & MTO information for costing and compilation into the cost estimate
    • Prepare Material Take Off (MTO) / Bill of Quantities (BOQ) and enter into Material System (MTS)
    • Develop Type I, II, III & IV multi-discipline cost estimates for EPCM projects (including FEED / conceptual projects). These estimates are to include engineering, project management, procurement, fabrication, transport, installation, hook-up & commissioning and abandonment
    • Benchmark estimates by carrying out validation and verification of the estimate using high level norms
    • Compare with previous estimates, outcome costs and vendor prices
    • Ensure that all estimates follow the correct checking mechanisms prior to delivery
    • Prepare and issue Request for Quotations (RFQ) to client approved vendors
    • Coordinate and facilitate technical meetings and product presentations by vendors
    • Maintain database of quotations, material and labour unit costs
    • Assigned to South Refining Maintenance Division (SRMD), Ras Tanura Refinery, Saudi Aramco
    • Review Engineering Packages of projects for implementation in the South Refining Unit (SRU)
    • Prepare materials take off and cost estimates on work orders and engineering packages
    • Prepare Short Form Contracts SFC, Long Form Contracts (LFC), Scope of Works
    • Prepare 6 Point Justifications for Sole Source contracts
    • Prepare communication letters to the Northern Area Contracts Assistance Unit (NACAU)
    • Conduct Technical Evaluation of contractors’ submitted bids
    • Prepare technical direct charge purchase requisition (DCPR)
    • Follow-up on DCPR approval and resolve any inquiries till the purchase order (PO) is placed
    • Attend pre-bid conference meetings and job Explanation Meetings representing the division,
    • Attend job planning and execution meetings with SRMD Engineering Support Unit (ESU)
    • Check the availability of major, critical and sub-critical equipment spare parts through SAP System
    • Prepare detailed engineering drawings with materials list (with SAP Stock Numbers) and estimates
    • Search manuals and drawings in the Library to support craftsmen, planner and other engineers
    • Marked up P & ID diagrams for the completed projects implemented in the SRU
    • Prepare technical papers and PowerPoint presentations
    • Prepare daily update status reports of RTR South Refining Comprehensive Insurance activity
    • Perform as assistant to the Maintenance Director during major Testing & Inspection (T&I) activities
    • Co-designed and maintained the SOUTH REFINING OME MANAGEMENT SYSTEM
    • Monitor contractors actual quantities of work items done to advice contracts planners
    • Review the quotations submitted by the contractors and discussed with the contract planner
    • Monitor the status of equipment sent to Machine Shop Services Department (MMSD) shops
    • Assist Area/Contract Planner for technical concerns
    • Assist Lead Planner and ESU Supervisor in preparing the budget (Industrial Forecast)
    • Northern Water Supply/Drilling of One Unit Exploratory/Production Well at Brgy. Upper Hinaplanon, Iligan City
    • Drilling of One Unit Explanatory/Production Well at Brgy. Mandulog, Iligan City
    • Hinaplanon Pumping Station Phase IV-B Construction of 650, 00 gals. R.C. Reservoir, Site Development, Access Road,Installation of Piping and Valving Systems and Distribution Pipelines at Brgy. Luinab, Iligan City
    • Perform as Quality Inspector and Quantity Surveyor of the city waterworks projects
    • Submit progress status report and attended technical and administrative meetings
    • Review progress billing and claims by contractors for change or extra work orders
    • Assist construction division head on in-house implemented projects
    • Globe Telecom Project, Mindanao Area, Philippines; sixteen (16) telecommunication cell sites facilities ranging from 50 meters to 60 meters high antennae towers and site development works,
    • Supervise project implementation and construction
    • Coordinate with local building authorities, lot owner, community officials and other stake holders
    • Attend technical and administrative meetings,
    • Prepare estimates, work scheduling requirements, periodic project status/progress reports,
    • Review progress billing and claims by sub-contractors for change or extra work orders
    • Globe Telecom Project, Mindanao Area, Philippines
    • Represent the client to negotiate with lot owners for land/lot rental or lease package
    • Acquire required private and government permits and clearances and all relevant legal documents
    • Collect and submit required technical engineering plans and legal documentations,
    • Coordinate with contractors and facilitate acquisition of permit to operate for the completed facilities,
    • Globe Telecom Globe Telecom Phase 9 Projects/Construction of 5 telecommunication cell sites facilities ranging from 50 meters to 60 meters high antennae towers and site development works inOccidental Mindoro and Ilocos Sur, Philippines
    • Supervise implementation telecommunication cell sites facilities
    • Coordinate with local building authorities, lot owner, and other project stake holders
    • Attend technical and administrative meetings
    • Prepare estimates, work scheduling requirements, periodic project status/progress reports
    • Prepare claims for change or extra work orders
    • Review sub-contractors progress billings and claims for change or extra work orders
    • Globe Telecom for Phase 7, 8A & 8B Telecommunication Cell Sites Projects in Metro Manila, South, Central & North Luzon areas
    • AutoCAD Operator: drafting of installation, construction and as-built drawings
    • Site Acquisition & Permitting Agent: represented client in negotiations with lot owners for lot lease
    • Attend public meetings, acquired building and other permits from private and government agencies
    • Project Engineer: supervise construction of telecommunication facilities ranging from 40 to 70 m high
  • finery for two (2)+ years
  • Eleven (11)+ years total professional working experience
  • Licensed Civil Engineer with 88% Licensure Board Exam Rating, Academic Scholar in University                
  • Familiar with International Engineering standards, codes and practices, Saudi Aramco Standards codes, practices and procedures and recognized estimating standards Richardson Cost Data, RS Means Cost Data, JS Page Estimating References and other industry estimating standards
  • Proficient in Microsoft Office Applications 2003, 2007, 2010 (Access, Excel, Word, PowerPoint, Outlook) and MS Project, SAP R3, Microstation V8, AutoCAD, Saudi Aramco AutoSACS,
  • Consistently delivered quality and complete costs estimates to various clients
  • Demonstrated strong ability to handle several projects at the same time

 

 

EXPERIENCE

Jan 1, 2013 - Present          Lead Estimator, Worley Parsons, Al-Khobar, Saudi Arabia

 

Projects:

  • AL-KHAFJI JOINT OPERATIONS(Cost Estimation, RFQ Preparation, Vendor Coordination)
    • FEED for Khafji Well SCADA Change Order
  • MA’ADEN PHOSPHATE COMPANY (Cost Estimation, RFQ, MTO, Material Requisition Preparation, & Vendor Coordination)
    • AMP Additional Hydrogenation Reactor, AMP Stripper Strainer, PAP-01-K01-K03 Interconnection
  • S-CHEM (Saudi Chevron Phillips) GES Contract (Cost Estimation, Quantity Take Off & Material Technical Requisition Packages)
    •  

 

Jan 17, 2009 – Dec. 31, 2012            Senior Estimator, Worley Parsons, Al-Khobar, Saudi Arabia

 

Projects:

  • Saudi Aramco GES Contract (Cost Estimation, Qty Take Off & Material Technical Requisition)
    • BI-10-00633 Upgrading Abqaiq Transmission Lines, Abqaiq, Saudi Aramco
    • BI-10-01247 Upgrade Power Supply Marjan GOSPS, Safaniyah, Saudi Aramco
    • BI -10-00273 Long Haul Communications For Corporate Data Center, Dhahran, Saudi Aramco
    • BI- 10-00450 Manifa DCO , Tower And Security Facilities – Manifa, Saudi Aramco (Sumitomo LSTK)
    • BI-25-00010  Replace Control System at KKIA, Riyadh, Saudi Aramco
    • BI-10-00688 Sulfur Handling & Export – Berri Gas Plant, Saudi Aramco
    • Other Miscellaneous GES Projects involving piping, instrumentation, HVAC, structural, process, mechanical, communication and electrical discipline.
  • AL-KHAFJI JOINT OPERATIONS(Cost Estimation, RFQ Preparation, Vendor Coordination)
    • FEED for Khafji Well SCADA
  • SATORP – GCC, Jubail Export Refinery Package 8  Pipeline & Off Plot Facility  a Jubail Export Zone, KSA (Material Requisition)
  • Ibn Sina POM (Polyoxymethylene) FEED project  (Cost Estimate- Bulk Materials)
  • Ras Tanura Integrated Project (RTIP), Saudi Arabia (Preparation of MTO'S for Tank Farm Area)
  • S-Chem (Saudi Chevron Phillips) GES Contract (Cost Estimation, Quantity Take Off & Material Technical Requisition Packages)

 

Main Duties & Responsibilities:

  • Reporting directly to Project Manager/s, and in close coordination with Lead Engineers; main duties and responsibilities are:
  • Provide Expenditure Request (ER) Estimates / cost estimates
  • Review and determine the class of cost estimate required and the intent of the cost estimate
  • Define project inputs, outputs and design criteria necessary for the desired cost estimate accuracy
  • Collect equipment & MTO information for costing and compilation into the cost estimate
  • Prepare Material Take Off (MTO) / Bill of Quantities (BOQ) and enter into Material System (MTS)
  • Develop Type I, II, III & IV multi-discipline cost estimates for EPCM projects (including FEED / conceptual projects). These estimates are to include engineering, project management, procurement, fabrication, transport, installation, hook-up & commissioning and abandonment
  • Benchmark estimates by carrying out validation and verification of the estimate using high level norms
  • Compare with previous estimates, outcome costs and vendor prices
  • Ensure that all estimates follow the correct checking mechanisms prior to delivery
  • Prepare and issue Request for Quotations (RFQ) to client approved vendors
  • Coordinate and facilitate technical meetings and product presentations by vendors
  • Maintain database of quotations, material and labour unit costs

Prepare Material Purchase Requisition (MR), and Material Technical Approvals (MTA)

 

Sept. 2006 – Nov. 2008       Planning Engineer, Arabian Fal Company, Ras Tanura, Saudi Arabia

 

Project:

  • Assigned to South Refining Maintenance Division (SRMD), Ras Tanura Refinery, Saudi Aramco

 

Main Duties & Responsibilities:

  • Review Engineering Packages of projects for implementation in the South Refining Unit (SRU)
  • Prepare materials take off and cost estimates on work orders and engineering packages
  • Prepare Short Form Contracts SFC, Long Form Contracts (LFC), Scope of Works
  • Prepare 6 Point Justifications for Sole Source contracts
  • Prepare communication letters to the Northern Area Contracts Assistance Unit (NACAU)
  • Conduct Technical Evaluation of contractors’ submitted bids
  • Prepare technical direct charge purchase requisition (DCPR)
  • Follow-up on DCPR approval and resolve any inquiries till the purchase order (PO) is placed
  • Attend pre-bid conference meetings and job Explanation Meetings representing the division,
  • Attend job planning and execution meetings with SRMD Engineering Support Unit (ESU)
  • Check the availability of major, critical and sub-critical equipment spare parts through SAP System
  • Prepare detailed engineering drawings with materials list (with SAP Stock Numbers) and estimates
  • Search manuals and drawings in the Library to support craftsmen, planner and other engineers
  • Marked up P & ID diagrams for the completed projects implemented in the SRU
  • Prepare technical papers and PowerPoint presentations
  • Prepare daily update status reports of RTR South Refining Comprehensive Insurance activity
  • Perform as assistant to the Maintenance Director during major Testing & Inspection (T&I) activities
  • Co-designed and maintained the SOUTH REFINING OME MANAGEMENT SYSTEM

(Management information system (MIS) being used in SRMD)

  • Monitor contractors actual quantities of work items done to advice contracts planners
  • Review the quotations submitted by the contractors and discussed with the contract planner
  • Monitor the status of equipment sent to Machine Shop Services Department (MMSD) shops
  • Assist Area/Contract Planner for technical concerns
  • Assist Lead Planner and ESU Supervisor in preparing the budget (Industrial Forecast)

 

Aug. 2005 – Jul 2006           Project Inspector, Iligan City Waterworks System (ICWS), Iligan City, Philippines

 

Projects:

  • Northern Water Supply/Drilling of One Unit Exploratory/Production Well at Brgy. Upper Hinaplanon, Iligan City
  • Drilling of One Unit Explanatory/Production Well at Brgy. Mandulog, Iligan City
  • Hinaplanon Pumping Station Phase IV-B Construction of 650, 00 gals. R.C. Reservoir, Site Development, Access Road,Installation of Piping and Valving Systems and Distribution Pipelines at Brgy. Luinab, Iligan City

 

Main Duties & Responsibilities:

  • Perform as Quality Inspector and Quantity Surveyor of the city waterworks projects
  • Submit progress status report and attended technical and administrative meetings
  • Review progress billing and claims by contractors for change or extra work orders
  • Assist construction division head on in-house implemented projects

 

Feb 2004 – Aug 2005           Site Engineer, C.M. Furukawa Philippines Inc., Taguig City, Philippines

 

Project:

  • Globe Telecom Project, Mindanao Area, Philippines; sixteen (16) telecommunication cell sites facilities ranging from 50 meters to 60 meters high antennae towers and site development works,

 

Main Duties & Responsibilities:

  • Supervise project implementation and construction
  • Coordinate with local building authorities, lot owner, community officials and other stake holders
  • Attend technical and administrative meetings,
  • Prepare estimates, work scheduling requirements, periodic project status/progress reports,
  • Review progress billing and claims by sub-contractors for change or extra work orders

 

 

Aug 2003 – Feb 2004           Site Acquisition and Permitting Executive,EF Baldo & Associates, Pasig City, Philippines

 

Project:

  • Globe Telecom Project, Mindanao Area, Philippines

 

Main Duties & Responsibilities:

  • Represent the client to negotiate with lot owners for land/lot rental or lease package
  • Acquire required private and government permits and clearances and all relevant legal documents
  • Collect and submit required technical engineering plans and legal documentations,
  • Coordinate with contractors and facilitate acquisition of permit to operate for the completed facilities,

 

Jan to Aug 2003                   Project Engineer II, JDL Construction/CAV Communication Philippines, Angeles City, Philippines

 

Project:

  • Globe Telecom Globe Telecom Phase 9 Projects/Construction of 5 telecommunication cell sites facilities ranging from 50 meters to 60 meters high antennae towers and site development works inOccidental Mindoro and Ilocos Sur, Philippines

 

Main Duties & Responsibilities:

  • Supervise implementation telecommunication cell sites facilities
  • Coordinate with local building authorities, lot owner, and other project stake holders
  • Attend technical and administrative meetings
  • Prepare estimates, work scheduling requirements, periodic project status/progress reports
  • Prepare claims for change or extra work orders
  • Review sub-contractors progress billings and claims for change or extra work orders

 

Aug 2001– Dec 2002           Engineer 1, RGL Construction, Caloocan City, Philippines

 

Project:

  • Globe Telecom for Phase 7, 8A & 8B Telecommunication Cell Sites Projects in Metro Manila, South, Central & North Luzon areas

 

Main Duties & Responsibilities:

  • AutoCAD Operator: drafting of installation, construction and as-built drawings
  • Site Acquisition & Permitting Agent: represented client in negotiations with lot owners for lot lease
  • Attend public meetings, acquired building and other permits from private and government agencies
  • Project Engineer: supervise construction of telecommunication facilities ranging from 40 to 70 m high