Manager /Civil/ UT(Project Management Consultant), RITES Ltd, Construction of Airport Metro Express line for Delhi Metro.

START Date: 
June, 2008
END Date: 
May, 2010

July 2008 – May 2010    MANAGER in Airport Line Consultant (ALC)( A Joint venture of OC-PBI-JARTS-   TONICHI-RITES) engaged through RITES LTD, for the Construction of AIRPORT METRO EXPRESS LINE from NEW DELHI to Indira Gandhi International Airport- Dwarka Sec. 21, a prestigious project of Delhi Metro Rail Corporation Ltd of Phase II.  http://www.delhimetrorail.com

. MANAGER / CIVIL/UT, RITES LTD.Member of the team of Airport Line Consultant over AMEL Project of DMRC since July 2008, as sectional in-charge of the following projects.

Cut &Cover tunnel, underground station of C-7, at Dwarka Sector-21 Amt 148 Cr— 90% of Total Earthwork and PCC, 367 metre length RCC tunnel, Raft of U/G Station completed.Project cost – 148.00 cr

  Elevated Viaduct over DhaulakuanflyoverAMEL-C2A 50Cr :  Pre stressed (Post-Tensioned) Continuous slab with integral column, of 634 metre length, passing over eight nos road at Dhaula kuan Intersection of New Delhi. Its include single length of 168m, 162m long with max span of 50 mtr,3rd largest in the world and 20 metre high ,highest Pillar of Delhi Metro.   completed. Project cost- 53.00 cr

Construction of DHAULA KUAN METRO STATION Elevated: AMEL- C2B, Amt 28Cr. Basement +3 floor, of total length of 300 metre, Including 160 metre Track slabs and Platform slab. Work completed. DMRC Ltd. Project cost- 30.00 cr

 Strengthening of Cantilever Piers nos CP-13 to CP-241 constructed for Eleveted Viaduct :AMEL-C2,DMRC Ltd.    Project cost- 15.00 cr