Guild of Project Controls: Compendium | Roles | Assessment | Certifications | Membership

Mechanical Engineer

Mechanical Engineer, Fighting For Safety & Security Equipment L.L.C, Various commercial Buildings

START Date: 
April, 2012
END Date: 
September, 2014

• Responsible for the Installation of Fire Protection System.

• Preparation of shop drawing for Fire Protection System using Auto Cad as per the NFPA standards and the local civil defence requirements.

• Estimation of Fire Protection System as per the Client drawings and Specifications.

• Review of Material take offs for all materials required in the site prepared by QS after detailed study of consultant drawings.

• Site Supervision and attending Client Meetings.

Experience Hours (Planning & Scheduling): 
2000
Experience Hours (Cost Management): 
1000

Mechanical Engineer, Malik Engineering Works, Various Fabrication

START Date: 
January, 2000
END Date: 
October, 2002

Company: Malik Engineering Works Pvt LTD, Palakkad, India

Designation: Mechanical Engineer

Company Profile: A well-reputed firm in the field of Fabrication of various engineering equipments

Job Profile: Performed all Engineering, Planning, Supervisory and Cost control activities for small scale fabrication projects.

Mechanical Engineer , CINDA E&C ltd, EPC FOR LNG Plant Cochin

START Date: 
July, 2009
END Date: 
August, 2012

Daily progress Report Technically to the client, Supervision of contractors works including fabrication, installation, testing, painting, commissioning of Oil & Gas facilities, progress monitoring and approvals, Maintain latest copies of all drawings and documents at the site office, Attend daily, weekly and monthly meetings with Client and Contractors, Witness all destructive & non-destructive tests, examinations etc. by the Contractors.

Experience Hours (Planning & Scheduling): 
900
Experience Hours (Cost Management): 
600
Experience Hours (Forensic Analysis): 
400

Mechanical Engineer, Hyundai Construction & Engineering, Al Dur Independent Water and Power Project

START Date: 
June, 2010
END Date: 
June, 2011

Mechanical Engineer                                                                                            &nbsp

Mechanical Engineer, S.C 24 IANUARIE PLOIESTI, PRIO LEHLIU

START Date: 
September, 2009
END Date: 
September, 2010

 

 

Metal construction , piping, etc

Work drawing elaboration

Technologichal route of materials

Elaboration of materials needs and specifications

 Design, material specifications, production tracking, file preparation and measurements

Mechanical Engineer, U.M.D, METKA BRAZI ; Coker Petromidia

START Date: 
October, 2010
END Date: 
May, 2011

Construction, installation and repairs refineries, petrochemical, oil and power installations

Mechanical Engineer, SC RUPS SA PETROBRAZI, Site REGHIN – PROLEMN

START Date: 
May, 2011
END Date: 
November, 2011

Constructions-assembly-spare parts reconditioning, refinery reparations, petrochemistry, oil and power equipments

Mechanical Engineer, Science-Tech Solutions Sdn Bhd, As per above

START Date: 
May, 2006
END Date: 
December, 2007

 

 

 

Project Title

Duration

Position

1

PSR-2 Revamp Project – Miscellaneous Enabling Works

Nov 2007 – Dec 2007

Mechanical Engineer, Science-Tech Solutions Sdn Bhd, As per above

START Date: 
May, 2006
END Date: 
December, 2007

 

 

 

Project Title

Duration

Position

1

PSR-2 Revamp Project – Miscellaneous Enabling Works

Nov 2007 – Dec 2007

Market Place

Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher. Teach yourself using on-line or book based learning or run your own in-house or public courses.
Syndicate content