Guild of Project Controls: Compendium | Roles | Assessment | Certifications | Membership

Akersolutions

Emeka Nwabuokei

First Name: 
Emeka
Last Name: 
Nwabuokei

I have worked my entire 10 year career for reputable contracting firms to all the major Operators in the world. I started my career with CNC FLUOR in Nigeria, as cost controller for major EPC projects both for local and international Organisations, one of which is Siraga and Tissot Gas Plant which according to records is the second largest in the world.

Professional Since: 
Mar-2004 (20.1 yrs experience)
Oldest experience: 
Mar 2004 (20.1 yrs experience)
Years Experience: 
10

Senior Planning Engineer, Akersolutions, TOTAL EGINA, Reliance KG-D6, ERHA Deepwater Project

START Date: 
August, 2011
END Date: 
August, 2012
  • Developed and maintained high quality schedules that clearly visualize the critical path.
  • Carried out early identification of potential progress risks and good control of risk mitigation.
  • Performed clear and accurate progress cut off reporting to management and clients.
  • Establish and maintain plans on all forms and all levels necessary, according to Project and Basis requirements
  • Collect progress information for all plans and reports as required
    • Monitor engineering, procurement and construction activities, highlight and comment irregulari

Lead Planner, Akersolutions, MURPHY MEDUSA

START Date: 
August, 2012
  • Prepared a Level 6 EPC Schedule for the entire scope using P6 version 8.2
  • Assisted Engineering in Preparation of the MDL and loading of planned dates into SAP
  • Created WBS In SAP
  • Created Networks and Activities in SAP to mirror the entire scope
  • Carried out Critical Path analysis on Project Schedule to ensure deliveries are on schedule
  • Carried out Weekly update of the schedule which is submitted to the client Responsible for planning all systems and manufacturing activities; interface directly with Stakeholders i.e.

Lead Planner, Akersolutions, MURPHY MEDUSA

START Date: 
August, 2012
  • Prepared a Level 6 EPC Schedule for the entire scope using P6 version 8.2
  • Assisted Engineering in Preparation of the MDL and loading of planned dates into SAP
  • Created WBS In SAP
  • Created Networks and Activities in SAP to mirror the entire scope
  • Carried out Critical Path analysis on Project Schedule to ensure deliveries are on schedule
  • Carried out Weekly update of the schedule which is submitted to the client Responsible for planning all systems and manufacturing activities; interface directly with Stakeholders i.e.

Lead Planner, Akersolutions, MURPHY MEDUSA

START Date: 
August, 2012
  • Prepared a Level 6 EPC Schedule for the entire scope using P6 version 8.2
  • Assisted Engineering in Preparation of the MDL and loading of planned dates into SAP
  • Created WBS In SAP
  • Created Networks and Activities in SAP to mirror the entire scope
  • Carried out Critical Path analysis on Project Schedule to ensure deliveries are on schedule
  • Carried out Weekly update of the schedule which is submitted to the client Responsible for planning all systems and manufacturing activities; interface directly with Stakeholders i.e.

Ariel Saavedra

First Name: 
Ariel
Last Name: 
Saavedra
Professional Since: 
Mar-1997 (27.1 yrs experience)
Oldest experience: 
Aug 1993 (30.7 yrs experience, WARNING: 3.6 years variance with Professional Since)
Years Experience: 
20

Akersolutions Lead Planner

START Date: 
August, 2008
Sennior Planning in Project Control, in Radomiro Tomic Exploitation Sulphides
CODELCO Chile.-

Market Place

Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher. Teach yourself using on-line or book based learning or run your own in-house or public courses.
Syndicate content