Guild of Project Controls: Compendium | Roles | Assessment | Certifications | Membership

Workpack progress reporting

Site Planning Engineer, MALAYSIA MARINE & HEAVY ENGINEERING SDN BHD, Gumusut Kakap Offshore Platform Development

START Date: 
June, 2007
END Date: 
May, 2008

1. Prepared and updated workpack and jobcard for Fabrication of Gumusut Kakap Floating Production System

2. Monitored and maintained benchmarking for each fabrication discpline

Experience Hours (Planning & Scheduling): 
2000

Planner, Enermech, Schiehallion Mooring Line Replacement

START Date: 
October, 2010
END Date: 
December, 2010

 

  • Developed a detailed Level 3 Installation schedule, in line with the projects WBS structure, using Microsoft Project.
  • Liaised with the Project Engineer on different installation options and produced a series of option plans for issue to the client.
  • Attended weekly client meetings, and advised on various installation options.

Tracked and issued progress to the client on Workpack status

Market Place

Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher. Teach yourself using on-line or book based learning or run your own in-house or public courses.
Syndicate content