Elevator Engineer, ETA-MELCO ENGINEERING (PTE) LTD, The Monarch Apartment (2B+30+R) - 4 Elevator Installation

START Date: 
July, 2006
END Date: 
April, 2007
  • Preparation of work schedules for installation of elevators.
  • Prepare & monitor the Project cost control.
  • Pre installation works coordination with contractor.
  • Co-ordinate with workers, customers to achieve time bound targets.
  • Interacting with clients, consultants and contractors for requirements at site and attending regular meeting.
  • Monitoring and tracking the project status along with safety and quality checks.
  • Sending “correspondence letter” to clients, consultants and contractors.
  • Guide and motivate the workers to maintain
Experience Hours (Planning & Scheduling): 
900

kasun madusanka

First Name: 
kasun
Last Name: 
madusanka

i'm a Bsc engineering graduate working as a planning engineer in sri lanka company and have completed planning works in  10 million US dollers poject.have ability to complete planning works using planning tools such as Primawera or MS project.

Professional Since: 
Apr-2011 (14.3 yrs experience)
Years Experience: 
0

Project Manager, Amana Pipeline Construction LLC, Fuel Hydrant and Fuel Storage Facility, Mattala Rajapaksa International Airport

START Date: 
July, 2012
END Date: 
November, 2013

  - Responsible for leading a team of professionals to deliver to the Client a facility that meets their expectations and complies with international standards.

 - Responsible for ensuring that the project is completed safely, within the prescribed period and budget, and compliant with the required quality.

 - Responsible for preparing the contractual letters, including the preparation and submission of the Extension of Time Claims. 

Stephen Lewis

First Name: 
Stephen
Last Name: 
Lewis
Professional Since: 
Jan-2006 (19.5 yrs experience)
Years Experience: 
0

Prageeth Chandrasiri

First Name: 
Prageeth
Last Name: 
Chandrasiri
Professional Since: 
May-2016 (9.2 yrs experience)
Oldest experience: 
Oct 2004 (20.8 yrs experience, WARNING: 11.6 years variance with Professional Since)
Years Experience: 
43

Planning Engineer, CEA, Infrastructure

START Date: 
October, 2004

I engage in Following Works,

1). Scheduling Roads, Higways & Expressways

2). Preparation of Programms for All kinds of Works

3). Progress Monitoring & Programme Updating

4). Preparation of Progress Reports (S - Curve, Physical, Financial Progress, etc)

5). Delay Analysis for EOT Claims

6). Evaluating EOT Claims (Time)

Gishan Kandegedara Manannalage

First Name: 
Gishan
Last Name: 
Kandegedara Manannalage
Oldest experience: 
Jan 2009 (16.5 yrs experience, WARNING: 39.0 years variance with Professional Since)
Years Experience: 
4

QUANTITY SURVEYOR, SOUTH WEST ARCHITECTURE, 2B+G+2P+26 HOTEL BUILDING

START Date: 
January, 2009

Pre Contract Stage:-

 

1.       Prepare a Sketch Stage Report including;

a.       Estimate of the total cost for the works at present prices based on the area, volume or some typical unit

2.       Prepare tender and contract documents as necessary for the surveys, studies or tests,

3.       analyze and report on tenders received

QUANTITY SURVEYOR, SOUTH WEST ARCHITECTURE, 2B+G+2P+26 HOTEL BUILDING

START Date: 
January, 2009

Pre Contract Stage:-

 

1.       Prepare a Sketch Stage Report including;

a.       Estimate of the total cost for the works at present prices based on the area, volume or some typical unit

2.       Prepare tender and contract documents as necessary for the surveys, studies or tests,

3.       analyze and report on tenders received

Market Place

No results found... (try selecting a different content filter)

Syndicate content