Website Upgrade Incoming - we're working on a new look (and speed!) standby while we deliver the project

Algeria (AF.DZ)

Area Planning Engineer., KOUGC ALGERIA, PIPING

START Date: 
August, 2010

COST CONTROL AND PLANING FOR A PIPING PROJECT IN ALGERIA

ATOUSSI Abdelkrim

First Name: 
ATOUSSI
Last Name: 
Abdelkrim

 

Professional Since: 
Jun-2009 (16.1 yrs experience)
Oldest experience: 
Jun 2009 (16.1 yrs experience, WARNING: 0.0 years variance with Professional Since)
Years Experience: 
42

Consultant Project Management, ISGP, Various

START Date: 
January, 2011

Training program development.

Responsibilities/Tasks: Animator of project management (Cost, Time and scope management), Teaching Primavera project planner software (Schedule development, Schedule resource loading & Leveling and work progress control).

Consultant, KMC, Trainning Program

START Date: 
July, 2010
END Date: 
December, 2010

Training program development.Completed wrote learning course “Progress and Performance Measurement” and “Ms Project 2003”  

Senior Planner, G.E, HWD

START Date: 
September, 2009
END Date: 
May, 2010

Renewal and Change process to improve production.

Senior Planner, Ansaldo Energya, Power Plant 3x127,8 MW

START Date: 
December, 2008
END Date: 
April, 2009

Turbo-generator 3x126,7MV with electrical substation (workshop, administration building, post of centralized control with integral system : energy equipments, gas, gas oil, various water system, electrical,  measures and telephony system, supervisory and security system and many other services).

Senior Planner, Systra-RATP, Underground railway

START Date: 
July, 2006
END Date: 
December, 2008

9.1 kmof railway comprising 10 underground stations, maintenance workshop, administration building, post of centralized control with integral system (energy equipments, rail, rolling-stock, telephony system, supervisory and security system and many services).

Consultant Project Management, ISGP, Various Education Projects

START Date: 
February, 2003
END Date: 
June, 2006

Animator of project management (Cost, Time and scope management), Teaching Primavera project planner software (Schedule development, Schedule resource loading & Leveling andwork progress control).

Senior Engineer, GTP, Various

START Date: 
June, 1995
END Date: 
December, 2002

Formulating detailed cost estimate for piping and equipment disciplines.

Sharer in work estimate.

P3 Schedule preparation, based on engineering, materials delivery and procurement schedule Preparation documents: Schedule development, Schedule resource loading & Leveling andwork progress control :

- Gas storage tank (sphere : 2000 m3)

- Replace an existing pipeline (9,2 km of 10”,12”, 16” and 20”)

- Enhanced oil recovery in R / Baguel,

Market Place

No results found... (try selecting a different content filter)

Syndicate content