Guild of Project Controls: Compendium | Roles | Assessment | Certifications | Membership

Mechanical Design / Project Engineer

Mechanical Design / Project Engineer, Weir, & Oil & Gas Projects

START Date: 
October, 1989
END Date: 
August, 2013

Employment

Form Jan.1999: Present: Maintenance O&M  Lead Engineer, ADWEA Co., Abu Dhabi, UAE

 

Lead 12 engineers +38 skilled employee

1-Manage day-to-day maintenance activities using CMMS(MAXIMO), mechanical failures

Investigation ,overhauling, commissioning, start up and acceptance tests of gas turbine,

Water tube boilers, waste heat recovery boilers and MSF desalination unit , Logic Control

Mechanical Design / Project Engineer, Weir, & Oil & Gas Projects

START Date: 
October, 1989
END Date: 
August, 2013

Employment

Form Jan.1999: Present: Maintenance O&M  Lead Engineer, ADWEA Co., Abu Dhabi, UAE

 

Lead 12 engineers +38 skilled employee

1-Manage day-to-day maintenance activities using CMMS(MAXIMO), mechanical failures

Investigation ,overhauling, commissioning, start up and acceptance tests of gas turbine,

Water tube boilers, waste heat recovery boilers and MSF desalination unit , Logic Control

Mechanical Design / Project Engineer, Weir, & Oil & Gas Projects

START Date: 
October, 1989
END Date: 
August, 2013

Employment

Form Jan.1999: Present: Maintenance O&M  Lead Engineer, ADWEA Co., Abu Dhabi, UAE

 

Lead 12 engineers +38 skilled employee

1-Manage day-to-day maintenance activities using CMMS(MAXIMO), mechanical failures

Investigation ,overhauling, commissioning, start up and acceptance tests of gas turbine,

Water tube boilers, waste heat recovery boilers and MSF desalination unit , Logic Control

Mechanical Design / Project Engineer, Design, Production and Consulting, Miscellaneous

START Date: 
April, 1961

Mechanical Project Specialist with over 40 years of experience.  I have extensive experience in project engineering and management; design engineering; field/site engineering; stress analysis of industrial piping systems and vessel design; rotating equipment; design, modification, and implementation of specialized equipment and machinery; maintenance engineering; and aircraft engineering.

With emphasis on Field/Site work, I have supervised fabrication and installation of equipment; also consulted with Production Department and Process Engineering to ascertain the

Mechanical Design / Project Engineer, Hunting Engineering, Numerous

START Date: 
March, 1997
END Date: 
September, 1999

Hunting Engineering provide electrical & mechanical design solutions to the Ministry of Defence.

Employed to design mechanical elements for the fitting of communications suites into a broad range of military vehicles (often involving undertaking stress calculations with applicable ā€˜gā€™ loadings). The role involved all aspects of mechanical design; initial concept, liaison with customer, concept design, final design (and drawings), writing of installation procedures. I had to undergo a six week vetting procedure to obtain MOD security (SC level) clearance.

Mechanical Design / Project Engineer, ISEMCA (Installations and Electro-mechanic Service, Various Projects

START Date: 
June, 2001
END Date: 
February, 2003

Working as project Engineer in Air Conditioning System Projects, Installations and services, initially assisting part time in the preparation of drawings and preliminary calculations for small projects, and after my graduation being in charge of two areas: installation supervision, supervising 4 technicians for installations and organizing them for different projects, as well as coordinate with the other disciplines related with the installation.

Market Place

Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher. Teach yourself using on-line or book based learning or run your own in-house or public courses.
Syndicate content