Guild of Project Controls: Compendium | Roles | Assessment | Certifications | Membership

Estimator

Estimator, MGL Group, 1)Water & Sewerage Pipelines 2) Buildings 3) Infrastructure

START Date: 
April, 2015

Estimator - MGL Group - preparing and pricing a range of schemes ranging from £10k to £5m

Project Engineer, Bids & Tenders preparation, Estimator, QS and scheduler, D.L. Cervantes Construction, Medium Rise Buildings

START Date: 
November, 1995
END Date: 
February, 2001

   Duties and Responsibilities:

 

·         Assigned as team head in the preparation of bid proposals.

·         Prepare cost estimates, quantity/materials take-off, master schedule, manpower and equipment schedules, bar chart, S-Curve, Pert-CPM, manpower histogram and detailed schedule.

Estimator, , Various

START Date: 
February, 2014

learning new things every day. Never stop learning. Estimating- Planning- Cost Controls

Estimator, Carillion Alawi LLC - Muscat - Oman, Building

START Date: 
May, 2008

v   Post contract work of Subcontractors Monthly Progress Bill.

v   Preparation and presentation of tenders and proposals

v   Receiving Client’s Inquiry / Project Requirements and Studying the BOQ s and the

          Contract Documents.

v   Taking off Quantities and preparing of variations.

Estimator, NRW, Civil and Building Projects

START Date: 
October, 2006

Estimator for civil construction, earthworks, concrete and steel structures, buildings in mining and infrastructure projects.

Estimator, C & A Pumps, blast furnace, TATA STEEL

START Date: 
November, 2011

Became a project control engineering apprentice shortly after I left school. I am now in my 4th and final year of my apprenticeship; I was a project control engineer for Siemens VAI after I spent the first year of my apprenticeship at NETA, after a year and a half at Siemens i was made redundant and I carried on progressing within NETA, after 3 months I started at Topside but after 5 weeks I decided I couldnt fulfill my aims as an proj. engineer while being there so i left.

Estimator, Technip, Kuantan and Segamat Compressor Station Expansion Project (Malaysia), Everest Project - Map Ta Phut (Thailand), Sisi Nubi Field Development Project – Phase 1 (Indonesia), Reformers and Aromatics Complex II Project - Map Ta Phut (Thaila

START Date: 
January, 2005
END Date: 
June, 2005

Prepared the bid cost estimate by means of computing the cost of mechanical equipment (pressure vessel, tank, column, heat exchanger, air cooled heat exchanger, compressor, and pump); calculating cost of bulk items; estimating the engineering, construction, and overhead cost; and summarizing all costs in Executive Price Sheet

Market Place

Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher. Teach yourself using on-line or book based learning or run your own in-house or public courses.
Syndicate content