Generated reports, procedures and engineered solutions to meet the contract and project specific client requirements for residential loft insulation works.
Prepared progress reports and procurement updates for including in project weekly / monthly reports to clients and internal management
Liaised with supervisors, clients, vendors and consultants
Performed site supervision and ensured all site safety aspect is being properly followed
Provided support to operational activities such as load outs, equipment maintenance etc.
I worked as an Assistant Engineer during development stage of Phil-Sino Center for Agricultural Technology (PhilSCAT) where we constructed the following:
1967 - mid 1968: 29 no. Manual design calculations for In-situ culverts on the (then) future Witbank to Middelburg freeway, from first principles to final drawings, in pencil, for submission to the Transvaal Chief Road Engineer. The drawings were traced in ink by qualified tracers before submission.
· العمل فى شركة عبر المملكة السعودية للتجارة والصناعة والمقاولات ( سبك ) في مشروع تصريف السيول بجدة تحت إشراف أرامكو السعودية، في قسم شئون الموظفن بوظيفة أخصائي شئون موظفين وعمل تحليل مسير الرواتب للعاملين بالمشروع وعمل عرض تقارير معلومات العمال و المراقبين والمهندسين والعمل على برنامـج ERB-Orecal .
Seconded to Transport for London (TfL) Major Projects Business Unit's Design Management Engineering Team, on the West London Tram Project as an Assistant Engineer, my responsibilities included:
Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher and PMI accredited REP. Teach yourself using on-line or book based learning or run your own in-house or public PMI accredited courses.
For 25+ years, APMX has been providing competency based project management training to Fortune 500 companies around the world, applying the principles of project based learning, designed to produce measurable results, generating a favorable “return on training investment”.