Website Upgrade Incoming - we're working on a new look (and speed!) standby while we deliver the project

Oil / Gas / Power

PROJECT CONTROLS ENGINEER, Fluor- Cnc , CHEVRON DIBI LONG, NAVGAS GAS PLANT, EXXON MOBIL INIM, TOTAL OML 99, TOTAL OML 100 ETC

START Date: 
March, 2004
END Date: 
August, 2011
  • Prepared a level 4 CPM schedule plus a comprehensive Basis of schedule document
  • Preparing level 4 Progress Measurement Matrix to calculate earned values Linked to the MDR
  • Reviewed Subcontractors calculation & schedule
  • Monitored weekly trends; SPI(t), CPI and to advise the project manager
  • Prepared weekly & Monthly report
  • Gave Project Controls advise as needed
  • Participated in weekly meetings with client
  • Re-forecasting planned Project Progress
  • Monitoring and controlling all contractors on the Project
  • Preparati

PROJECT CONTROLS ENGINEER, Fluor- Cnc , CHEVRON DIBI LONG, NAVGAS GAS PLANT, EXXON MOBIL INIM, TOTAL OML 99, TOTAL OML 100 ETC

START Date: 
March, 2004
END Date: 
August, 2011
  • Prepared a level 4 CPM schedule plus a comprehensive Basis of schedule document
  • Preparing level 4 Progress Measurement Matrix to calculate earned values Linked to the MDR
  • Reviewed Subcontractors calculation & schedule
  • Monitored weekly trends; SPI(t), CPI and to advise the project manager
  • Prepared weekly & Monthly report
  • Gave Project Controls advise as needed
  • Participated in weekly meetings with client
  • Re-forecasting planned Project Progress
  • Monitoring and controlling all contractors on the Project
  • Preparati

Senior Planning Engineer, Akersolutions, TOTAL EGINA, Reliance KG-D6, ERHA Deepwater Project

START Date: 
August, 2011
END Date: 
August, 2012
  • Developed and maintained high quality schedules that clearly visualize the critical path.
  • Carried out early identification of potential progress risks and good control of risk mitigation.
  • Performed clear and accurate progress cut off reporting to management and clients.
  • Establish and maintain plans on all forms and all levels necessary, according to Project and Basis requirements
  • Collect progress information for all plans and reports as required
    • Monitor engineering, procurement and construction activities, highlight and comment irregulari

Lead Planner, Akersolutions, MURPHY MEDUSA

START Date: 
August, 2012
  • Prepared a Level 6 EPC Schedule for the entire scope using P6 version 8.2
  • Assisted Engineering in Preparation of the MDL and loading of planned dates into SAP
  • Created WBS In SAP
  • Created Networks and Activities in SAP to mirror the entire scope
  • Carried out Critical Path analysis on Project Schedule to ensure deliveries are on schedule
  • Carried out Weekly update of the schedule which is submitted to the client Responsible for planning all systems and manufacturing activities; interface directly with Stakeholders i.e.

Lead Planner, Akersolutions, MURPHY MEDUSA

START Date: 
August, 2012
  • Prepared a Level 6 EPC Schedule for the entire scope using P6 version 8.2
  • Assisted Engineering in Preparation of the MDL and loading of planned dates into SAP
  • Created WBS In SAP
  • Created Networks and Activities in SAP to mirror the entire scope
  • Carried out Critical Path analysis on Project Schedule to ensure deliveries are on schedule
  • Carried out Weekly update of the schedule which is submitted to the client Responsible for planning all systems and manufacturing activities; interface directly with Stakeholders i.e.

Lead Planner, Akersolutions, MURPHY MEDUSA

START Date: 
August, 2012
  • Prepared a Level 6 EPC Schedule for the entire scope using P6 version 8.2
  • Assisted Engineering in Preparation of the MDL and loading of planned dates into SAP
  • Created WBS In SAP
  • Created Networks and Activities in SAP to mirror the entire scope
  • Carried out Critical Path analysis on Project Schedule to ensure deliveries are on schedule
  • Carried out Weekly update of the schedule which is submitted to the client Responsible for planning all systems and manufacturing activities; interface directly with Stakeholders i.e.

Planner, Alcon Nigeria Limited, Fabrication of Mechanical & Structural Equipment for Oil & Gas

START Date: 
February, 2014

As a Planner in Alcon Nigeria Limited Structural Fabrication & Precast Yard since February 2014, i Schedule, Cost Project & Undertake Daily Progress Measurement. I also ensure that Resources allocated to activities are Effeciently Allocated. And each Individual Project Finishes as at when Scheduled.

Planner, Alcon Nigeria Limited, Fabrication of Mechanical & Structural Equipment for Oil & Gas

START Date: 
February, 2014

As a Planner in Alcon Nigeria Limited Structural Fabrication & Precast Yard since February 2014, i Schedule, Cost Project & Undertake Daily Progress Measurement. I also ensure that Resources allocated to activities are Effeciently Allocated. And each Individual Project Finishes as at when Scheduled.

Planner, Alcon Nigeria Limited, Fabrication of Mechanical & Structural Equipment for Oil & Gas

START Date: 
February, 2014

In my present job as a Planner in the Structural , Mechanical & Civil precast Fabrication Yard, i schedule , cost Projects &  do a proper control to ensure that Resources allocated to activities are Efficiently used & Project finishes at when Scheduled. I do daily Progress Measurement as a Control tool.

Planner, Alcon Nigeria Limited, Fabrication of Mechanical & Structural Equipment for Oil & Gas

START Date: 
February, 2014

In my present job as a Planner in the Structural , Mechanical & Civil precast Fabrication Yard, i schedule , cost Projects &  do a proper control to ensure that Resources allocated to activities are Efficiently used & Project finishes at when Scheduled. I do daily Progress Measurement as a Control tool.