Vineeth k m

First Name: 
Vineeth
Last Name: 
k m
  1. Works in Head Office with Project Management Team.
  2.  Preparation of  schedule in Primavera to execute the work.
  3.  Monthly schedule will prepare depend upon the delivery schedule of customer supplied product and work fronts.
  4. Preparation of 3 Months Look ahead schedule with the details of Engineering, Materials and construction.
  5. Follow up the work progress by coordinating with Execution team.
  6.  Schedule and conduct the review meetings with in the project team and contractor.
  7.  Arrange the necessary tools and tackles for
Professional Since: 
Jun-2009 (14.9 yrs experience)
Oldest experience: 
Nov 2010 (13.5 yrs experience, WARNING: 1.4 years variance with Professional Since)
Years Experience: 
1

1.“planning engineer” or “project planner”, Shin Eversendai Engineering, construction field, Power infrastructure works

START Date: 
September, 2012

  Works in Head Office with Project Management Team.

 Preparation of  schedule in Primavera to execute the work.

  Monthly schedule will prepare depend upon the delivery schedule of customer supplied product and work fronts.

  Preparation of 3 Months Look ahead schedule with the details of Engineering, Materials and construction.

  Follow up the work progress by coordinating with Execution team.

 Schedule and conduct the review meetings with in the project team and contractor.

Site Planner, Shin Eversendai Engineering, 1 X 1000 MW Coal Fired Supercritical Boiler

START Date: 
December, 2011

 

Project: 1 X 1000 MW Coal fired Supercritical Boiler

• Implementing and supervision of mill, pulverizer and boiler installation for Power Plants of capacity 1000 MW.

• To ensure planning, scheduling & timely execution of all Mechanical Erection & Commissioning related work of 1 X 1000 MW Power Project at site.

• Good knowledge of boiler components, including pressure parts, pre assembly, structure erection of Heavy equipment with specific experience of preparation of lifting plan.