Guild of Project Controls: Compendium | Roles | Assessment | Certifications | Membership

PT. Adhi Karya (Persero) Tbk

Chief Project Engineer, PT. Adhi Karya (Persero) Tbk, Urgent Recovery Project after Tsunamy Disaster (Meulaboh - Calang); Rehabilitation and Reconstruction Project for National Road of Nanggroe Aceh Darussalam

START Date: 
November, 2005
END Date: 
December, 2007

Managed all engineering process with detail as follow:

  1. Provide the existing Topographic Survey Data
  2. Provide Shop Drawing, Construction Drawing and As Built Drawing
  3. Provide Master Schedule, Detail Schedule and Work Method
  4. Monitor the Construction Progress and Cost Controlling,
  5. Provide Monthly Progress and Invoicing
Experience Hours (Planning & Scheduling): 
2300
Experience Hours (Cost Management): 
2000

Planner, PT. Adhi Karya (Persero) Tbk, Apartment Project, The View

START Date: 
September, 2005
END Date: 
October, 2005

Provide a Material Schedule for fast track project (The View, Apartment Project), Jakarta, Indonesia

Experience Hours (Planning & Scheduling): 
300

Project Engineer, PT. Adhi Karya (Persero) Tbk, Jakarta Monorail Project

START Date: 
April, 2005
END Date: 
August, 2005

Provide and supervise the work method and soil investigation survey on the preparation of Train Depo of Jakarta Monorail Project

Experience Hours (Planning & Scheduling): 
300
Experience Hours (Cost Management): 
350

Planner , PT. Adhi Karya (Persero) Tbk, Sumatera East Coast Highway Project, CA-03 Package (Seputih Banyak - Menggala)

START Date: 
November, 2002
END Date: 
March, 2005
  • Responsible to provide Master and Detail Schedule
  • Provide Project Quality Plan
  • Provide Safety and Health Environment Plan
Experience Hours (Planning & Scheduling): 
3000
Experience Hours (Forensic Analysis): 
1600

Project Engineer, PT. Adhi Karya (Persero) Tbk, Hospital Building Construction and Road Construction

START Date: 
January, 2002
END Date: 
October, 2002

Learning about project business, project management, tender and bidding, work analysis for creating budget work plan and work method. Projects during this programme are:

1. General Hospital of Cengkareng Project, Jakarta, Indonesia.

2. Nunukan Outer Ring Road Project, Nunukan Island, North Kalimantan, Indonesia.

Experience Hours (Planning & Scheduling): 
1250

Rinto Tampubolon

First Name: 
Rinto
Last Name: 
Tampubolon

Project Planning, Project Control

Professional Since: 
Dec-2011 (12.4 yrs experience)
Years Experience: 
0

Project Control & Project Engineer, PT. Adhi Karya (Persero) Tbk, Spillway and Embankment Project in LAPINDO Mud Flow, Sidoarjo

START Date: 
August, 2006
END Date: 
July, 2007

Key Role               :          

 

ü  Review the design of awarded project.

ü  Act as Liaison Engineer who coordinate with the Design Consultant, Sub Contractors, Vendors and all related Institution which involved in the process of feasibility study.

Project Control & Project Engineer, PT. Adhi Karya (Persero) Tbk, Modernization of Manado University (1st Stage Construction)

START Date: 
August, 2009
END Date: 
September, 2010

Key Role              :

ü  Review the design of awarded project.

ü  Prepare all the requirement of feasibility study which consist of: alternative design, cost estimation, construction program, procurement planning, projected cash flow, etc