Senior Principal Planning Engineer, Saipem, Aramco, Long Term Agreement Projets

START Date: 
December, 2013
SENIOR PRINCIPAL ENGINEER - PLANNING           SAIPEM SHARJAH ENG. (SHARJAH / UAE)

 

Mar 2013 – to date              Working as a Project Control Eng. with Primavera P6 reporting to Planning Manager in SAIPEM, Sharjah.

                                        

                                         LTA Projects (for Saudi Aramco): EPCI projects for jackets, decks, flow lines.

                                         Also preparing various bid schedules for EPC, EPCI, EPIC projects.

 
SENIOR PRINCIPAL ENGINEER – PLANNING Eng.      SAIPEM – DUBAI DRYDOCKS (DUBAI / UAE)

 

Dec 2011 – Mar 2013           Working as a Planning/Project Control Engineer with Primavera P3 reporting to Planning Manager in SAIPEM, Dubai Drydocks.

                                        

                                         FSRU TOSCANA (Livorno Conversion Project) for OLT:

                                         Preparation and update of weekly, monthly planning / progress reports. Update & monitor daily manpower on board. Prepare and monitor Integration schedule with reports including piping, structural, electrical & instrument cables. Prepare, update and monitor Precommissioning and Commissioning Schedule. Prepare Weekly & Monthly Project Board for Main Office in Milan, Italy.

 
SENIOR PRINCIPAL ENGINEER – PLANNING Eng.      SAIPEM – DUBAI DRYDOCKS (DUBAI / UAE)

 

Jul 2009 – Sep 2011            Working as a Planning/Project Control Engineer with Primavera P3 reporting to Planning Manager in SAIPEM, Dubai Drydocks.

                                        

                                         FPSO AQUILA Phase II (Firenze FPSO Conversion Project) for ENI:

                                         Complete conversion in accordance with Client requirements & RINA. Preparation and update of weekly, monthly planning / progress reports. Update & monitor daily manpower onboard. Prepare and monitor Integration schedule with reports including piping, structural, electrical & instrument cables. Prepare, update and monitor Precommissioning and Commissioning Schedule. Prepare Weekly & Monthly Project Board for Main Office in Milan, Italy.

 
SENIOR PRINCIPAL ENGINEER – PLANNING       SAIPEM – SHARJAH ENGINEERING (SHJ / UAE)

 

Oct 2008 – Jun 2009            Working as a Planning/Project Control Engineer with Primavera P3 reporting to General Mng in Sharjah Eng, Office

                                        

                                         FPSO GIMBOA (FPSO Conversion Project):

                                         Follow-up until first oil

 

                                         FPSO AQUILA (FPSO Conversion Project):

                                         Involved in bid preparation at Saipem Milano Office between Nov.2008 and Dec.2008.

                                         Evaluate material deliveries, POs and prepare a summary schedule of vessel delivery at the completion of conversion.

 

SENIOR PROJECT ENGINEER – Project Control                     FPSO GIMBOA – (OFFSHORE)
 
Jan 2009 – Feb 2009          Working as a Project Control Engineer on board FPSO Gimboa reporting to Construction Mng during final construction and Commissioning in Angola waters (28/28 rotation).
                                         Responsible of Job Cards daily preparation and update with HCS (Hook-up Control System) software. Prepare and issue daily progress report of ITRAs, ITRBs, Loop Checks, Punch list As and Bs by using WinPCS. Prepare and issue weekly Manhours at Completion report. Update daily subsea commissioning schedule. Update daily P3 schedule of “Road Map to First Oil”. Liaise with discipline heads for the daily activities on going on board.
 
SENIOR PROJECT ENGINEER – Project Control                      FPSO GIMBOA – (OFFSHORE)
 
Sept 2008 – Oct 2008         Working as a Project Control Engineer on board FPSO Gimboa reporting to Construction Mng during the sea trials & voyage to Angola (6 weeks).
                                         Responsible of Job Cards daily preparation and update with HCS (Hook-up Control System) software. Prepare and issue daily progress report of ITRAs, ITRBs, Loop Checks, Punch list As and Bs by using WinPCS. Prepare and issue weekly Manhours at Completion report. Liaise with discipline heads for the daily activities on going on board.

 

 
 
SENIOR PRINCIPAL ENGINEER – PLANNING Eng.      SAIPEM – DUBAI DRYDOCKS (DUBAI / UAE)

 

Aug 2007 – Aug 2008          Working as a Planning/Project Control Engineer with Primavera P3 reporting to Planning Manager in SAIPEM, Dubai Drydocks.

                                        

                                         FPSO GIMBOA (FPSO Conversion Project) for SONANGOL:

                                         Complete conversion project in accordance with Client requirements. Preparation and update of weekly, monthly planning / progress reports. Prepare and monitor Integration schedule. Prepare and monitor fabrication and instalment stages of Integration progress reports including piping, structural, electrical & instrument cables. Update daily manpower. Prepare Weekly & Monthly Project Board for Main Office in Milan, Italy.

 

COMPANY OWNER & MANAGING DIRECTOR  of  TROY MARINE L.L.C.(DUBAI / UAE)

 

Sept 2006 – May 2007         Main contractor of V1 Advanced Composite Technologies FZCO and RAKV1 Composites L.L.C. Managing of a team of 39 boat builders and laminators for the following projects:

 

                                          70ft. Sports Fisher (in Ras Al Khaimah): Constructing hull, deck and superstructure plugs and moulds with epoxy (Ampreg 22), glass fibre and carbon with vacuum bagging system. Constructing hull longitudinal and transversal supports and floors.

                                         

                                          60ft. Sailing boat (in Jebel Ali Free Zone): Constructing hull, deck and superstructure plugs and moulds with epoxy (Ampreg 22), glass fibre and carbon with vacuum bagging system. Building Hull product with sandwich system.

 

                                          80ft. Sailing boat (in Jebel Ali Free Zone): Constructing hull plug with epoxy (Ampreg 22), glass fibre and carbon with vacuum bagging system.

                                         

                                          44ft. Sailing boat (in Jebel Ali Free Zone): Constructing hull plug and mould with epoxy (Ampreg 22), glass fibre and carbon with vacuum bagging system. Building Hull product with sandwich system.

 

                                          Modular Floating Home (in Ras Al Khaimah): Constructing pillars, pillar supports, beams, beam supports, wall panels with epoxy (Ampreg 22), glass fibre and carbon with vacuum bagging system. Assembly of home with steel connection pieces, honeycomb floor panels, doors & windows.

 

Jun 2006 – Mar 2007            Subcontractor of Sunrise Shiptrading L.L.C. Managing of a team of 14 teak applicators for the following project:

                                          46 meters Motor Yacht “M/Y Umm Hurair”:

                                          1. Leveling, underlaying with wood grating, manufacturing & fixing of exterior teak decking    of 450 sq.m with Sika

                                          2. Leveling, underlaying with wood grating, manufacturing & fixing of interior teak decking of 260 sq.m with Sika

                                          3. Manufacturing & fixing of exterior teak capping rails of 90 run.m

                                          4. Manufacturing & fixing of teak deck seats of 4 nos.

 

Aug 2004 – Jul 2006            Main contractor of Palm Marine FZCO. Managing of a team of 58 boat builders and laminators for the following projects:

                                          56ft.Palm Cruiser X 2, 42ft.DSS Boats X 2, 42ft.Flybridge X 2, 60ft.Palm Cruiser X 1, 42ft. Walkaround X 1 : Constructing hull, deck and superstructure plugs and moulds with polyester, glass fibre and carbon with hand lay-up system. Constructing hull, deck and superstructure products. Turn key delivery with complete interiors, exteriors, teak decking and services.

                                         

Feb 2004 – Aug 2005           Subcontractor of Platinum Projects FZCO. Managing of a team of 46 boat builders for the following projects:

                                          164 meters Motor Yacht “M/YPlatinum” for H.H Shaikh Mohammed Al Maktoum:

                                          1. Leveling, manufacturing & fixing of exterior teak decking of 1250 sq.m with Sika

                                          2. Manufacturing & fixing of exterior teak handrails of 680 run.m

                                          3. Installation of crew panels of 6,250 sq.m

                                          4. Installation of insulated floating floor panels of  1,150 sq.m

                                          5. Manufacturing & installation of aluminium partition panels of 11,600 sq.m

 

Nov 2003 – Apr 2004           Subcontractor of MCD Marine Construction Division of Abu Dhabi Navy. Managing of a team of 18 teak applicators for the following project:

                                          70 meters House Boat for Shaikh Khalifa of Abu Dhabi:

                                          1. Leveling, manufacturing & fixing of exterior teak decking of 900 sq.m with Sika

                                          2. Manufacturing & fixing of exterior teak handrails of 165 run.m

                                          3. Manufacturing & fixing of teak stairs & deck furniture

                                          4. Manufacturing & fixing of exterior ceiling panels of 235 sq.m

                                          5. Manufacturing & fixing of exterior teak bulwark panels of 90 sq.m

 

 
PLANNING ENGINEER    SBM-SAIPEM (DUBAI DRYDOCKS) (DUBAI / UAE)

 

Mar 2003 – Oct 2003            Working as a Planning Engineer with Primavera P3 reporting to Project Manager in SBM Dubai Drydocks.

                                         FPSO MYSTRAS, Drilling Rig Conversion Project (FPSO):

                                         Complete conversion of the rig project in accordance with Client (Nigeria) requirements. Preparation and update of weekly, monthly construction schedules, bar charts. Preparation and update of weekly, monthly planning reports and submit them to the main office to SBM Monaco.  Attend weekly production meetings with suppliers and main subcontractor (Dubai Drydocks). Prepare projections and one month look-ahead schedules and reports. Monitor the progress daily on board the ship.

 

PLANNING MANAGER      INTERNATIONAL MARINE CONTRACTORS (DUBAI / UAE)

 

Mar 2002 – Feb 2003           Working as Planning Manager with Primavera P3 reporting to Project Manager.

                                          Outfitting project of 167 meter Motor Yacht (M/Y Platinum-Royal Yacht of Dubai)

                                          Responsible of 12 engineers, planners, schedulers, purchasers.

                                          Coordination and planning of design, structural, electrical, machinery, HVAC, piping, stainless steel, insulation, teak decking, framing, panelling, painting, flooring departments.

                                          Preparation and update of weekly, monthly construction schedules

                                          Preparation and update of weekly, monthly progress reports

                                          Purchasing all required tools, machinery, safety equipment

                                          Preparation of monthly progress invoices to the Client

                                          Review and approval of subcontractors’ monthly progress invoices

 

 
PLANNING MANAGER/COORDINATOR      TUZLA SHIPYARD & TOURISM CO (ISTANBUL / TURKEY)

 

Aug 1999 – Feb 2002           Working as Planning Manager/coordinator with Primavera reporting to Shipyard Manager.

                                          New building of Container ships, various ship repair projects in 350 meter floating dock

                                          Responsible of 6 engineers, planners in planning dept.

                                          Coordination and planning of all departments in the shipyard.

                                          Preparation and update of monthly construction schedules.

                                          Preparation and update of monthly progress reports

                                          Purchasing all required tools, machinery, safety equipment.

                                          Coordination of subcontractors, collecting, reviewing and approving the quotations.

                                          Coordination of work in floating dock during the ship repairs

 

PLANNING ENGINEER      TUZLA SHIPYARD & TOURISM CO.  (ISTANBUL / TURKEY)

 

Apr 1997 –Jul 1999            SCARABEO 7 CONVERSION PROJECT

Working as planning engineer with Primavera reporting to Scottish Planning Manager.

Complete conversion of the rig project in accordance with Client (Saipem) requirements. Preparation and update of weekly, monthly construction schedules, bar charts. Preparation and update of weekly, monthly planning reports.Attend weekly production meetings with Client and shipyard departments. Prepare projections and one month look ahead schedules and reports. Monitor the progress daily on board the ship.                  

 

PLANNING ENGINEER      SEDEF SHIPYARD   (ISTANBUL / TURKEY)

 

Apr 1995 – Mar 1997          Working as planning engineer reporting to Planning Manager.

New building container ships for Germany.

Responsible of machinery, insulation, HVAC departments

                                         Purchasing all required material, tools, machinery.

Coordination of subcontractors, collecting, reviewing and approving the quotations

 

 
COORDINATOR             NOTIKA TEKNIK   (ISTANBUL / TURKEY)

 

Dec 1992 – Aug 1993         Working as coordinator reporting to Shipyard Manager.

New building 60ft composite sailing boat with West System Epoxy.

Responsible of hull product, interiors and outfitting

                                         Purchasing all required material, tools, machinery.

 

 
PROJECT ENGINEER      TURKTER SHIPYARD   (ISTANBUL / TURKEY)

 

Oct 1990 – Jul 1992           Refurbishment of “M/Y SAVARONA” 131meter motor yacht

        Working as project engineer reporting to British Project Manager working for Donald Starkey Design.

Responsible of 95 workers for all interiors and exterior teak decking work.