Guild of Project Controls: Compendium | Roles | Assessment | Certifications | Membership

Planning & Cost Control Engineer, Saif Bin Darwish, Infrastructure development Samkha Lot-4

START Date: 
May, 2002

 

SOUMYA ROY                                                                                                                                                     ADDRESS: 10, COLONEL BISWAS ROAD, 

KOLKATA-700019

E-MAIL: roysamu@rediffmail.com                         

Ph.no: 033-22807044 (Kolkata)

Contact No. +91-9748023266 (Mobile) - Only Msg (India No)

 

                    +971-529471261 (UAE No)                                                                    

                   

KEY QUALIFICATIONS:

 

Graduate Civil Engineerwith 10+ years of professional experience with International Bidding Contractors and Construction Supervision/Design Consultants.  Worked on World Bank funded & State funded projects. Progress Oriented Construction Supervision monitoring maintaining Quality of Road & Structural works. Have 5+ yrs of site experience of execution of Major and Minor bridges as well as Protective Structure (Retaining wall/Reinforced Earth wall) and checking & drafting of detail working drawings for the same(RCC /PSC Structures) and Flexible Pavement Works. I was involved in repair and rehabilitation ofdistressed bridges and construction supervision of new bridges on Well and Pile foundations and have knowledge cable profiling & prestressing in bridges. Monitoring Construction activities related to Flexible Pavement to ensure compliance with Technical Specifications (MORTH, IRC) laid down as per theFIDIC Contract Regulation. Have 5+ Yrs of experience in Planning Function mainlyBudgeting Process, and Project Monitoring & Cost ControlExercise. Also an active internal ISO auditor for Company.

 

WORK EXPERIENCE / PROJECT DETAILS:

  • Nov 2011 till Sept-2012.

 

M/s AFCONS Infrastructure Ltd

 

Presently working as MIS in Charge for Construction of Viaduct for Metro Rail from New Garia to Airport Link (Pkg ANV1 & ANV3) –Overall 10.96 km of Project Length. Client –RVNL. Project Cost – 4460 Million. Key Responsibilities were preparation of Project Budget and Monthly MIS & Cost Control Statements with day to day planning related monitoring Works.

 

  • April 2007 TO Oct 2011.

M/s Hindustan Construction Company Ltd.

 

  • Nov-2009 –Oct-2011.

 

As Planning-Manager for Kolkata Elevated Corridor Project -4 Lane 9.154KM long flyover connecting existing AJC Bose Flyover to E.M Bypass beyond Parama Rotary towards Airport & Garia. CLIENT-KMDA. Project Cost-3179 Million. (JNNURM & State Funded). Major Responsibilities included Primary Design Co-ordination, Preparation Overall Contractual Program & updation etc Cost Control Measures through Project Budget Projections & Estimation and Contractual Correspondence related to EOT/ Impacted schedule etc.   

 

 

  • April 2007 to Nov-2009.

 

As aPlanning Engineer at Paradip Road Project at NH-5A. CLIENT: PPRCL / NHAI. Project Cost: Rs. 3270 Million. (ParadipPortConnectivity Project) Preparation of Season Budget, Cost To Company Calculation for a project on Quarterly basis and reviewing the same at the end of each Quarter. Costing Analysis of Actual vs. Budget with Variance. Estimation of balance quantities and identification of variations, quantity work out from GFC Drawings issued. Preparing and Analyzing MIS with Accounts Executive reporting to the Project Controller regarding shortcomings, identifying improvement zones and shortfalls as well remedial measures taken up. Preparation of Monthly as well as season work programs. Checking of Working Drawings and Bar Bending Schedule for issue to Client/Consultant. Preparation of Claim Documents regarding EOT/ Overstay etc. Proper documentation of Drawings, Work methodology and contractual letters etc. Preparation of Client Program, Monthly Client Report, Flash report Physical and Financial Status of the project to the Management. Preparation of review slides regarding project performance on Quarterly basis. Technical Co-Ordination in between all the Service Dept at Site level. (Operations, Mechanical and Procurement) .Additional responsibilities include Budget Preparation and Cost Control Measures for Assam Road Project Package AS-23. Project Cost: Rs. 3170 Million.(East West Corridor)

 

 

JULY 2005 TO April 2007

 

M/s. GAMMON INDIA LTD. India.

 

  • As Assistant Engineer, at the Construction Site of 1.965 km long, 7 Ramp R.O.B (DOMORIA FLYOVER) JALLANDHAR.Govt of INDIA funded Project of Rs.250 Million. The project comprises of 47 spans of varying length (20-35m) super structure comprising of Box & I Girders (PSC) and 817 m of Reinforced Earthwall at ramps. Duties involving execution of Superstructure Work comprising of Casting of Pretension I-girders by using LONG LINE System of Prestressing, it’s launching and casting of Deck Slab. Preparation of Control Estimate and Daily planning and co-ordination of activities.

 

  • As Assistant Engineer, at the Construction Site of  310 m long R.C.C Spandrel Braced Arch and Prestressed Concrete Box Girder CLC Bridge at Bagchal Over Govind Sagar Reservoir (Himachal Pradesh) CLIENT: H.P (P.W.D)  Project Cost:230 Million (NABARD Funded Project). Duties involved Monitoring of excavation of Rock strata by Drilling and Blasting for open foundation of 45 m Ht. of Pier. Preparation of Concrete Mix Design, Soil Investigation, Billing of Sub-Contractors, Estimation of Quantities etc.Preparation of Control Estimate and Daily planning and co-ordination of activities.

 

MAY 2003 TO JULY 2005

 

Lea Associates South Asia Pvt. Ltd. In association with Lea International, Canada

 

  • Worked as a Field Engineer in Construction Supervision of National Highway Project Contract no. GTRIP/6 (Construction Package IV-A & IV-C) (World Bank Funded Project)-implemented under FIDIC Conditions of contract and ICB, Project Cost Rs. 5760 Million. CLIENT: NHAI (GOVT OF INDIA)

·         Responsible for Supervision of the Structural works along with Quality Assurance Wing for the construction of 4-laning and Strengthening of NH-2.which comprises Major Bridge-SoneBridge (3.065KM long prestressed concrete post tensioned with segmental box girder on Well Foundation) & 21 kms. New bypass (Sasaram Bypass), 5 minor bridges, 5 underpasses, 7 subways, 16 box culverts, 51 HP culverts and more than 9KM of Retaining Wall. Extensive Execution & Supervision construction experience related to Flexible Pavement, Cross Drainage Works & Minor Bridges. The duties include overall supervision of physical progress of work by using project management technique, ensuring establishment of proper quality assurance and standard controlled system of works maintaining safety and environmental practices under the able guidance of Bridge Engineer and Resident Engineer.

 

MAY 2002 TO MAY 2003 

 

M\s Amritalal Chatterjee (Govt.Contractor)

   

·         Worked as a Site Engineerat a construction site of a R.C.CBox Bridge (28m) with Open Foundation (R.O.B)at Anandapur, a project work of (P.W.D) Govt.ofWest Bengal. I have predominantly worked on CONCRETEmix design of different Grades such as M-20, M-25, M-35 as per workability and strength requirements of the different road structures of the project as per IS: 10262 – 1982 / SP-23.

·         I was responsible for preparing Bar Bending Schedule, quantity calculation, preparation of bill and construction execution of open foundation, & its superstructure. I was instrumental in establishing the Quality Control Laboratory at site regarding tests conducted for cubes, aggregates, & cement.

 

EDUCATIONAL QUALIFICATION:

 

Passed BACHELOR OF ENGINEERING IN CIVIL ENGINEERING from Jawaharlal Nehru National College of Engineering under Visveswaraiah TechnologicalUniversity, Belgaum, Karnataka in 2002 with 69.06% (FIRST CLASS) and an average of 63.86% (All Semesters)

 

IT EXPOSURE:

 

Languages:                           C++, C.

Operating Systems:             WINDOWS XP (MS-OFFICE)

Application Software:          STAAD Pro-2001, LS PLOT, AUTOCAD 2005

                                               AUTOPLOTTER-Road Estimator,

Project Management

Software                               :PRIMAVERA 3.1 (Basics), MS-Project-2003.

               

TRAINING:

  • Participated in the “WORKSHOP ON CONCRETE MIX DESIGN” under AMBUJA CEMENT on 6-7thJuly 2001.
  • Participated in the “‘WORKSHOPON RECENT CONSTRUCTION PRACTICES” under GAMMON INDIA LTD on 8th-12th AUG’05 at Agra-Makhanpur Project site.
  • Successful completion of on jobPlanning Engineer Development Program at NICMAR, Pune for 6 months under HCC Ltd.

    •    Internal ISO Auditing Workshop at VOLTAS Training Center, Thane on 7th -8th December, 2007.

       •    Workshop on Presentation Skills at H.O. on 10th December, 2007.

  • 7 Days Training Program on advanced use of MSP at Project site and  Primavera 6.0 at Nicmar, Pune on June-10

 

 

SEMINAR:

 

·         Presented a seminar on “GROUNDWATER ASSESMENT ITS DEVELOPMENT & MANAGEMENT”

  • Attended 2 days of National Seminar “WAVES OF FUTURE CIVIL ENGINEERING IN 21st CENTURY” held at J.N.Tata Auditorium, I.I.Sc. Bangalore organized by the Bangalore Center of The Association of Consulting Civil Engineers (INDIA)
  • Attended In house Seminar on “Contract Management of Construction Supervision Projects” by Mr. D.K.Verma (Sr.Contract Specialist-LASA)

 

PERSONAL SKILLS:

 

Comprehensive problem solving abilities, ability to deal with people rationally

Team facilitator. Acquainted with IRC/IS Design Code books and Manuals. Have preliminary idea of GCC and FIDIC Contract Clauses.

 

PERSONAL DETAILS:

 

NAME:                                                  SOUMYA ROY

 

PERMANENT ADDRESS:                   10, COLONEL BISWAS ROAD,

                                                              KOLKATA-700019

                                                              WEST BENGAL (INDIA)

 

DATE OF BIRTH:                                15th DECEMBER 1978

 

SEX:                                                     MALE

 

PASSPORT NO:                                   F 4576634 valid upto 2015

 

MARITAL STATUS:                             MARRIED

 

DEPENDANT:                                     Wife, Daughter (1 Month)

 

NATIONALITY:                                     INDIAN

 

LANGUAGES:                                      ENGLISH, BENGALI, AND HINDI