Guild of Project Controls: Compendium | Roles | Assessment | Certifications | Membership

Planning Engineer Construction & Maintenance, "ARABIAN INDUSTRIES LLC., OMAN", EPC of New & Old Onshore Gas Plant upstream & Compression Facilities

START Date: 
November, 2002

 

Permanent Address:

Hutton Road, Masjid Gali, Asansol.

Dist. Burdwan (W.B) – INDIA

Mobile no.: + 968-95309723 (MUSCAT-OMAN)

Mobile no.: + 91-9679643874 (HOME)

Mobile no.: + 91-9749253379 (HOME)

E-mail: f.mumtaz@rediffmail.com

E-mail: f.mumtaz@yahoo.co.in

 

Faisal Mumtaz

 

Personal  Information

Date of Birth:                    13th Sep. 1982

Permanent Residency:      Asansol – (West Bengal)

Technical Education

 

Diploma in Mechanical Engineering (1999-2002)from Aligarh Muslim University (AMU) – Aligarh.

Computer Skills

 

  • Diploma in Computer Application.(MS-Office 2007)
  • Diploma in Auto Cad (R14 / 2009)
  • PRIMAVERA 6.0 training done from KLG Systel Ltd.
    • Worked in Primavera 6.0, SAP R/3 (PM Module), Primavera 3.0, MS Project, ERP, Auto Cad.

Training Courses

  • Hempel’s & Jotun basic paint knowledge with Saudi Aramco APCS system including QA/QC Awareness.
  • Attend HSE Supervisory & Management Level Induction for Contractors Training Course of PDO – Oman.
  • Attend H2S Awareness & Escape Training Course of PDO – Oman.

Professional Experience

 

Arabian Industries LLC. – Oman

 

Service Period     :               December 2008 – Present

Positions Held      :               Planning Engineer (Construction & Maintenance)

 

Dayim Punj Lloyd Ltd. – Saudi Arabia

 

Service Period     :               December 2007 – November 2008

Positions Held      :               Planning Engineer (Construction)

 

Olayan Descon Engineering / Industrial Co.Ltd. (U, U2, PP, S, A, R) – Saudi Arabia

 

Service Period     :               August 2005 – Nov. 2007

Positions Held      :               Planning Engineer

 

Neela Metal Finishing Co. Pvt.Ld. - Mumbai

 

Service Period     :               Nov. 2002 – July 2005

Positions Held      :               Planner cum Project Engineer

 

 

JOB RESPONSIBILITIES :

 

Arabian Industries LLC – Oman

 

Designation :Planning Engineer (Construction & Maintenance)

 

Arabian Industriesis a leading EPC Contracting Company specialized in Design, Engineering, Project Construction, and Fabrication and Maintenance of Process equipments & activities in Oil, Gas and Power Sectors. The company’s quality certifications include ISO-9001, ISO-14001, and OHSAS-18001.

EMC contract was awarded by PDO toArabian Industrieson 2005 for 05yrs and same WPAI JV was formed betweenArabian Industries and Worley Parsonto cater the same Engineering, Maintenance and Construction Contract of South Oman.

Project:

 

·Budour NE Phase 3B development-Detail Design, Procurement & Construction

·Birba Flare system Up grade Project – (EPC)

·Rabab S-2H1 Well Head Project – (PC)

·Marmul Modification of Sampling Points of Hydro-Cyclones – (FCP)

·Marmul: Installation of PIT and LIT on drains vessel V-2406 – (FCP)

·Several Integrity Pipe line Projects for Gathering Station, On Plot as well as

    Off Plot.

 

Client:  Petroleum Development Oman (PDO)

 

Responsibilities:

  • Prepare integrated plans and schedules for projects planning guide line for the approval.
  • Prepare WBS on receipt of estimate / schedule request for the estimation and budget allocations for Estimators
  • Prepare plan and schedules with resource loading in line with estimates based on WBS.
  • Responsible for activity progress reporting and regular update of plans and schedules.
  • Make the Visit of work shop and construction site regularly to monitor the actual progress as per schedule.
  • Prepare and submit weekly and monthly reports with the Coordination of Discipline Engineers and Construction Manager.   
  • Monitor and update overall activity plans and schedules for projects.
  • Early warning of schedule delays and proposals for mitigation to Project Engineers / Construction coordinator for resolution.
  • Responsible for the Level-1 to Level - 5 project schedule preparation, monitoring, reporting and generate the S-Curve, Resources Histograms with respect to construction,
  • Prepare the scope of work for Preventive & Corrective Maintenance activities.
  • Attending daily Operation, CMPT+YTT meeting with client PDO and plan to execute the job accordingly as per priority (P1, P2 or P3)
  • Preparation and monitoring the 14 days & 90 days plan activities in SAP subsequently book the Oil deferment.
  • Closely monitor the 14 days job to achieve the Planned KPI every week and follow up to complete the activity within LAFD.
  • Prepare the schedule for Turnaround or shutdown CM and PM activities accordingly prepare the arrangement for all resources (Manpower, Equipments, Special Tools)
  • Update the SAP as per planned resource for all Corrective and Preventive Maintenance activity.

 

Major Shut down attended with WPAI :

 

NRPS S/D:Duration was 24 Hr. & Oil Deferment was 20540 M3

MMPS S/D:  Duration was 20 Hr. & Oil Deferment was 14116 M3.

RTQ S/D:Duration was 22 Hr. & Oil Deferment was 4786 M3.

BIRBA S/D:Duration was 20 Hr. & Oil Deferment was 6492 M3.

 

DAYIM PUNJ LLOYD LTD.(Saudi Arabia – KSA )

 

Designation :Planning Engineer (Construction)

 

Punj Lloyd Limited is one of the largest engineering construction companies in India providing integrated design, engineering, procurement, construction and project management services for energy industry and infrastructure sector projects.

 

Project Summary: 

 

An EPC contract for Early Need Tankages (08 no. - 4169 Ton) as per API 650 & 01 vessel (Sphere – 310 Ton) as per ASME Sec. V111 Div. 1 with “U” Stamp.

 

Client:  Fluor Arabia Ltd.                   Owner: Saudi Kayan (SABIC)

 

 

Responsibilities:

  • Establish and maintain a full working knowledge of the project or specified area scope of work.
  • Preparation of critical path project programmes at a level of presentation, suitable for conveying an understanding of the project scope, targets and goals.

 

  • Submit Daily Progress Report (DPR) & Weekly Progress Report (WPR) to the client as per agreed contract.
  • Prepare the 3-week look a head schedule and also make the micro plan with the coordination of Discipline Engineer.
  • Technical specification review and approval of specification and drawings with co-ordination of discipline design engineer.
  • Prepare the resources (Manpower and equipment) histograms.
  • Prepare S-curve for progress, cash flow, and material status.
  • Prepare the method statement of erection and vendor shop activities.
  • Prepare, monitor, update project schedule and highlight project delays.
  • Project Planning, scheduling & progress monitoring work at various sites and timely reporting of progress & bottleneck.
  • Prepare project communication etiquette and intimate client so that effective communication is ensured.
  • Keeping in view contractually agreed project schedule, plan a project schedule to level II & I and obtain concurrence from internal sections/departments. In case of slippage, take timely necessary actions to avoid delays and to deliver a project on or before time.
  • Steer and ensure every activity is as per schedule & also ensure quality and budget margins.
  • Manage all sub-contracting activities of a job and verify sub-contractor’s invoices before payment.
  • Coordinate with commercial section for any changes.

OLAYAN DESCON ENGG./INDL.CO.LTD. (Saudi Arabia – KSA )

 

An engineering (ISO 9001:2000) company with ASME / NB stamps

(U, U2, PP, S, A, R)equipped to undertake large size turnkey Construction & Manufacturing projects for equipment such as Pressure Vessels & Columns, Heat exchangers & Fin Fan coolers, Storage Tanks etc. and other related equipment.

 

Designation:Planning Engineer (Project leader) for Design, fabrication & supply of Pressure Vessels, Heat exchangers, Column, Fin Fan Coolers & Storage Tanks.

 

Responsibilities:

  • Work as a single point of contact for all concerned persons (client, internal coordination etc.) and the total ownership of a project.
  • Attain a comprehensive familiarity on all commercial conditions and technical specifications and drawings of project.
  • Conduct or attend meetings (Kick-off, in house, pre-inspection.etc) with client & vendor and prepare their minutes and ensure the action has to be taken on or before time.
  • Preparation and submission of Project Schedule to client and ensured that programmes are specific, comprehensive, understandable and realistic.
  • Create bill of material, detailed instructions for manufacturing process of new part, specification for packaging, external supplier specification to provide standard cost structure and instructions for manufacturing.
  • Follow up contractors to submit work schedules, manpower/equipment/materials input plans, organization charts, key personnel lists, and other technical documents, and examine them to secure contractor’s readiness and compliance with technical requirements.
  • Effectively communicate the requirements of the programme to project management, engineering, procurement and construction staff.
  • Tracking, up dating and monitoring the project schedule.
  • Use ERP & PMS system for indenting & tracking of material.
  • Estimate the additional requirements of the project and getting waiver from client.
  • Prepare check list for project invoices and ensure release of all payments from client.

Major Projects Completed with Olayan Descon:

 

(1)   Client: TECNICAS REUNIDAS                                    Owner: SAUDI ARAMCO

        Location:  Jubail                                                         Duration:  OCT.06 ~ OCT.07

 

Project summary :Design, fabrication and supply of HIC, CLAD & SS Pr. Vessels  

(33 Nos – 567 Ton) & Column (04 Nos – 376Ton) as per ASME SEC. VIII, DIV.1- “U” STAMP for the project of HAWAIYAH GAS PLANT EXPANSION

 

 

(2)   Client:  SNAMPROGETTI                                            Owner: SAUDI ARAMCO

        Location:  KHURAIS-KUC                                            Duration:  MAR.07 ~ SEP.07

 

Project summary:Design, fabrication and supply of CS & SS Vessels  

(07 Nos – 147 Ton) as per ASME SEC.VIII, DIV.1- “U” STAMP for KHURAIS CENTRAL PROCESSING FACILITIES PROJECT.

 

(3)   Client: SNAMPROGETTI                                            Owner: SAUDI ARAMCO

        Location:  KHURAIS-KCC - KSA                               Duration:  SEP.07 ~ JULY.08

 

Project summary:Design, fabrication and supply of wet sour services HIC Drum (04 Nos – 192 Ton) as per ASME SEC.VIII DIV.1 - “U” STAMP for KHURAIS CRUDE CONTRACT (KCC) PROJECT.

 

(4)   Client: CTCI                                                                Owner: SABIC

        Location:  JUBAIL                                                      Duration:  SEP.07 ~ JUNE.08

 

Project summary:Design, fabrication and supply of Heat exchanger

(08 Nos – 364 Ton) as per ASME SEC.VIII DIV.1 - “U” STAMP for the project of SAUDI KAYAN PETRO CHEMICAL COMPLEX EO / EG FACILITY.

 

(5)   Client: SAUDI ARAMCO                                             Owner: S. ARAMCO

        Location:  HARADH GAS PLANT-KSA                      Duration:  DEC.07 ~ AUG.08

        

Project summary :Design, fabrication and supply of Overhead Gas Inter Cooler &

After Cooler (02 Nos – 21 Ton) as per ASME SEC.VIII /API 661/32-SAMSS-11 - “U” STAMP for DEBOTTLENECK CONDENSATE SYSTEM.

 

Achievements:

  • Project summary:Design, fabrication and supply of wet sour services of HIC Pr. Vessels (15 Nos – 339 Ton) as per ASME SEC.VIII DIV. 1 – “U” STAMP for KHURSANIYAH PRODUCING FACILITIES-KPF (SNAMPROGETTI-SAUDI ARAMCO).

 

 

 

  • Project summary:Design, fabrication and supply of CS & SS Pr. Vessels & Tanks (25 Nos – 190 Ton) as per ASME SEC.VIII DIV. 1 & API 650 – “U” STAMP for SHARQ III-RD EXPANSION (SAMSUNG-SABIC)

 

  • Project summary:Design, fabrication and supply of Tube bundle with Dummy shell (06 Nos – 114 Ton) as per ASME SEC.VIII DIV. 1 / TEMA ‘R’ – “U” STAMP for OLEFINS PLANT-JUBAIL (PETROKEMYA-SABIC)

 

  • Project summary:Design, fabrication and supply of Tube bundle for Depropanizer Overhead Condenser (02 Nos – 34 Ton) as per ASME SEC.VIII DIV. 1 / TEMA ‘R’ for MTBE COMPLEX-JUBAIL (IBN ZAHR-SABIC)

 

  • Project summary:Design, fabrication and supply of Pr. Vessel & Drum (24 nos – 880 Ton) for as per ASME SEC.VIII DIV. 1 for JCP PROJECT-JUBAIL (JGC CORPORATION)
  • Project summary:Shut down of Refurbishment of Kubota Valves (08 nos – 33 Ton) of sizes 18” & 42” for SAUDI POLYFIN COMPLEX.(NPIC & TASNEE)

Letter of Appreciation:

Certificate of appreciation by Olayan Descon for efficiently managing the material     handling for the Saudi Aramco KHURSANIYA GAS PROJECT.

 

Neela Metal Finishing Co. Pvt.Ld. – Mumbai (India)

 

An engineering company of Pharma, Biotech & Food and Beverage engaged in Turnkey Installation of Water and also involves in design, supply and installation of Pr.Vessels, Heat exchangers, Process column and process & pressure piping.

 

Designation :Planner cum Project engineer

 

Responsibilities:

­­­­­­­­­

  • Preparation of project schedule.
  • Planning & preparation of schedule for the execution of the project & up date the client with daily, weekly & monthly planning of project.
  • Preparation of bill of material and make the MRP of project.
  • Raised the requisition for raw material basically plates, pie & fittings.
  • Sole control for the issuance of material to shop floor.
  • Maintain minimum inventory level.
  • Managing all sub contracting activities/ services required for smooth execution of projects.

 

  • Follow up with client and vendors for all issuance of the project.
  • Preparation of invoices after completion of project

Majors Projects handled with Neela:

 

Client:Engineers India Ltd.

  • Design, fabrication and supply of Dummy shell for heavy tube bundle (01 NOS)

 

Client:Reliance Industries Ltd. Jamnagar

  • Design, fabrication and supply of Heat exchanger (01 Nos – 17.5 Ton) (Shut down) as per ASME SEC.VIII, DIV.1/TEMA “U” STAMP.

 

 

Client:Reliance Industries Ltd. Jamnagar

  • Fabrication and supply of feed nozzle, distribution and man hole cover with over lay (shut down)

 

Client:Larsen & Toubro Ltd. (Hazira)

  • Design, fabrication and supply of deaerators (01 Nos - ) as per ASME SEC.VIII, DIV.1 for IOCL , Panipat

Client:Reliance Industries Ltd. Jamnagar

  • 100% Re-tubing & installation of heat exchangers (Shut down) 03 NOS and modification of channels heads nozzles (03 NOS) “U-PART” STAMP.

Personal Information

Father’s Name                     :  Late Md. Mumtaz Siddique

Religion                                 :  Muslim (Islam)

Sex                                         :  Male
 

Language Known                                :  English, Urdu, Hindi, Bengali & Arabic

Passport no.                         :  H-1954800 (Valid up to Dec 2018).

Expected Salary                 :  Negotiable

Notice Period                      :  30 days

 Declaration                          :  I hereby declare that all the above statements are       correct to the best of my knowledge.