Senior Planning Engineer, consortium of Technip Germany GmbH and Al Jaber Energy Services of Abu Dhabi, United Arab Emirates, Fujairah Water & Power Project, Fujairah-Al Ain-Al Dhaid in United Arab Emirates

START Date: 
April, 2002
END Date: 
November, 2002

SENIOR PLANNING ENGINEER in consortium of Technip Germany GmbH and

                                                        Al Jaber Energy Services of Abu Dhabi, United Arab Emirates

              Project                                     :       Fujairah Water & Power Project, Fujairah-Al Ain-Al Dhaid in United Arab Emirates

              Consultant & Client              :       Fichtner Consulting Engineers, Germany and UAE Offsets Group (UOG)

              Value                                       :       UAE Dirhams Two (2) Billion i.e. US Dollars 546 Million

Scope of Work of the project:

Turnkey construction of Potable Water Transmission System from Qidfa Water & Power Plant to Al Ain (with a design capacity of 100 MIGD) and to Al Dhaid (with a design capacity of 20 MIGD). Water Transmission System include 2 x 64” Æ  pipelines of 178.165 km. length from Qidfa to Al Ain,2 x 24” Æ pipelines of  18 km. length from Qidfa to Al Dhaid, Qidfa Pumping Station (capacity 100 MIGD), 2 intermediate reservoirs (5 MIG each) at highest altitude of routing, 5 storage reservoirs (20 MIG each i.e. 2 at Al Oha & Al Ain, 1 at Al Hayer), 2 storage reservoirs (10 MIG each) at Al Dhaid, associated civil works, buildings, HVAC, piping systems, pumping stations, electrical, instrumentation, control.

                            Duties & Responsibilities

Planning, Scheduling & Control of the project by preparing & updating Schedules (CPM Networks & Bar Charts), manpower & equipment loading schedules & histograms,  progress curves, progress reports using

computer  software viz.  Primavera Project Planner (P3 for Windows) and Microsoft Excel & Word.