Construction Scheduling & Planning Consultant, MDCD Corporation, NY, USA, NYCSCA, NYCT, NYCDEP, NYCDOT, NYSDOT, NYCDDC

START Date: 
October, 2001
END Date: 
October, 2017
Michael Dellaquila    
Dix Hills, NY 11746
mdellaquila@mdcdcorp.com    
      
WORK HISTORYCPM Scheduling Consultant/Owner of MDCD Corp. (September 2010 - Present)
• Project Estimating, Cost Analysis, Bidding, Purchasing, Expediting, CPM Scheduling, Project Analysis, Project Controls,
• Build New and Repair Current CPM construction Schedules, CPM Schedule Time Extensions
• Oracle Primavera Project Management P6 Certified CPM Scheduler for the Following Municipal Contracts:
 NYDEP Jamaica Waste Water Treatment Plant Improvement Phase II (260 Million)
 706 11th Avenue GM Potamkin Auto Dealership Rehab (12 Million)
 NYCT 4/5 Fulton Street Station and the Dey Street Headhouse Rehabilitation - Contract #: A-36137  (57 Million) - Assistant PM and  NYCT Approved Project Scheduler
 NYCSCA East NY Family Academy, Brooklyn College Academy, PS 101 and PS 29 - Surveillance Camera Installation ($1 Million)
 NYCSCA PS 138, PS 156, PS 181 and PS 270 - Surveillance Camera Installation ($1 Million)
 NYCSCA R373 SPED, PS 36, PS 53 and PS 45 - Surveillance Camera Installations ($1 Million)
 NYCSCA PS 180, A. Philip Randolph HS, PS 194, PS 189 and PS 163 - Surveillance Camera Installation ($1.4 Million)
 NYCSCA IS 244 X Roofs, Access Ramp, Wall, Parapets and Flood Elimination ($4.7 Million)
 NYCSCA IS 208 Flood Elimination, Masonry Repair, Windows ($2.17 Million)
 NYCSCA IS 383 Boiler Construction and Climate Control ($7.8 Million)
 NYCSCA PS 14 X Lighting Fixture Replacements ($750,000.00)
 NYCSCA PS 235 Lighting Replacements ($2.3 Million)
 NYCSCA PS 398 New 4 Story Building ($62 Million)
 NYCSCA IS 71 Fire Alarm, PA and Clock Systems ($1.7 Million)
 PANYNJ LaGuardia Emergency Storm Drainage Outfalls Contract #: LGA-774.133B ($2.8 Million)
 NYCSCA PS 242 Flood Elimination, Masonry Repair, Windows ($980,000)
 NYCSCA PS 75 PLANNYC Boiler Conversion/Climate Control ($6.6 Million)
 AMTRAK Sunny Side Yards Rehabilitation Tracks 1-36, Contract #: 9500001588 ($35 Million)
 NYCT Contract A-36944 Furnish and Install Flood Mitigation/Resiliency Measures at Six Locations in Brooklyn, Manhattan and Queens ($3.2 Million) NYCT Approved Project Scheduler Project Manager for the Following Municipal Contracts:
 NYC DPR Soundview Park Sport Court and Playground Reconstruction (3.6 Million)
 NYCSCA Jill Chaifetz Transfer High School - Lease Building Renovation (14 Million)
 NYCSCA PS 188 - Boiler Replacement and Exterior Windows/Brick Renovation (12.5 Million)
 NYCSCA PS 111 - Intermediary School Rehab (16.5 Million)
 NYC EDC Contract Schaefer Brewery Esplanade Upland Construction  (1.3 Million)
 NYC DPR Contract Restoration of the Wyckoff House Historical Landmark (1.5 Million)
 NYC MTA Contract Corona Yard Phase III, Building a Signal Tower Facility (1.5 Million)
 NYC Health & Hospitals Contract - The September 11th Memorial at Jacobi Medical Center (1.2 Million)
 NYC DDC Contract - Curb and Sidewalk Reconstruction Work in 163rd Street to 159th Street between 29th Avenue to 30th Avenue ($800,000.00 Project Manager / Superintendent for Dell Tech Enterprises (2004 – June 2008, September 2010 - February 2013)
• Oversight of project from estimation to job completion
• Management of on-site construction and project capital, coordination and cooperation of subcontractors, management of union trades and labor, completing projects on time and within budget
• Collection of project earnings, project work scheduling, problem solving, and appropriate build methods to ensure project quality
• Engineering work including: design review, drafting in AutoCAD, P3 & P6 CPM project scheduling, Correspondence with agencies, Subcontract negotiations, Submission of RFI’s, Change Orders, Payment Requisitions, As-builts and Close Out Documents Project Manager for WDF Inc. (June 2008 - September 2010)
• Responsibilities same as described above. Field Construction Supervisor (2001 - 2004)
• Supervision of the project jobsite construction according to proper design-build methods, specs and drawings, Layout of project scope in the field, Measurement and sketching for unit price payments, Daily Logs, Daily Reports,
• Work scheduling, hiring of subcontractors, material ordering, recording daily logs, field work layout and measurement, shooting elevation grades, taking inventory and overseeing maintenance and repair of company equipment, ordering of new equipment and tools, creating "as built" drawings contract, preparing estimates and bid proposals, reporting to city agencies, communicating and corresponding with city inspectors EDUCATION:Bachelor of Science in Mechanical Engineering, New York Institute of Technology (September 2002 - September 2006)
Aviation Administration, SUNY Farmingdale University (September 2001 - December 2002)
Power Curber Mechanics School for a 5700B Power Curber (Spring 2004) CERTIFICATIONS & SPECIAL SKILLS:• Certified in Oracle Primavera Project Management P6 - CPM Scheduling Software
• Microsoft Office, AutoCAD, Microsoft Project, Primavera Project Planner P3, Quickbooks, Solidworks 2013, Adobe Pro X, Google Sketch
• Surveying (Unlicensed) and use of Total Station Transit and Surveying Techniques
• Heavy Machinery Operator
• 80 WPM
• Fluent in Spanish 

 

Experience Hours (Planning & Scheduling): 
24950
Experience Hours (Cost Management): 
15550
Experience Hours (Forensic Analysis): 
4200