Foster Wheeler Wood Group

Senior Planning Engineer, Foster Wheeler Wood Group, Mobil 1989 Subsea Development

START Date: 
October, 1989
END Date: 
January, 1989

Plan the detail design for the Mobil, 1989 Subsea Developments associated with the Beryl Field. Plan the conceptual and detail design for the B P Pipeline Safety Project covering all B P operated North Sea Platforms and Pipelines, plus all third party lines and platforms using B P facilities for transporting of oil and/or gas. 

Senior Planning Engineer, Foster Wheeler Wood Group, Ninian Third Party Project

START Date: 
September, 1993
END Date: 
April, 1991

Plan the Engineering and Design for Strathspey Field acceptance on Ninian Central Platform. Liase closely with Senior Cost Engineer in the incorporation, on an on-going basis, of all ECN's/RFV's into the integrated Planning and Cost Control System. Supervise the planning for the closeout of Detail Engineering and Design for both Ninian Central & Southern Platforms. Liase fully with Procurement and Construction to ensure detail design plans met with Procurement/On-shore Fabrication/Construction deadlines. 