Saudi Oger Ltd.

QA/ QC Electrical Engineer (Low Current), Saudi Oger Ltd., King Abdullah project for Development of security compounds – Kap1 –Ministry of Interior - ($2019

START Date: 
October, 2009

*  Conduct site survey prior to design execution to assist engineering department in case of any modifications and/ or extensions.

*  Review and implement designs in conformance with specifications and standards (ISO, NFPA, BICSI) and analyze soundness of the design scope.

*  Following up approval of execution drawings and material submittal sheets prior to any electrical works.

Experience Hours (Planning & Scheduling): 
4500

QA/ QC Electrical Engineer (Low Current), Saudi Oger Ltd., King Abdullah project for Development of security compounds – Kap1 –Ministry of Interior - ($2019

START Date: 
October, 2009

*  Conduct site survey prior to design execution to assist engineering department in case of any modifications and/ or extensions.

*  Review and implement designs in conformance with specifications and standards (ISO, NFPA, BICSI) and analyze soundness of the design scope.

*  Following up approval of execution drawings and material submittal sheets prior to any electrical works.

Experience Hours (Planning & Scheduling): 
4500

Marcelo Cobrador

First Name: 
Marcelo
Last Name: 
Cobrador
Professional Since: 
Aug-1995 (29.9 yrs experience)
Oldest experience: 
Jun 2010 (15.1 yrs experience, WARNING: 14.8 years variance with Professional Since)
Years Experience: 
0

Project Controls Manager, Saudi Oger Ltd., King Abdullah Project for the Development of Security Centers – Phase 1 (KAP1)

START Date: 
September, 2012
END Date: 
June, 2014

Project: King Abdullah Project for the Development of Security Centers – Phase 1 (305 sites) – KAP1.

Location: Riyadh, Saudi Arabia.

Value: US$ 2 Billion.

Client: Ministry Of Interior (MOI)

Team Composition: 22 (2 Section Planning Managers) + 6 Senior Schedulers + 12 Schedulers + 2 Reporting Engineers).

Prject Controls Manager, Saudi Oger Ltd., Rehabilitation, Expansion, Operation, Development, and Maintenance of Prince Mohamed Bin Abdulaziz International Airport, Madinah

START Date: 
December, 2011
END Date: 
August, 2012

Project: Rehabilitation, Expansion, Operation, Development, and Maintenance of Prince Mohamed Bin Abdulaziz International Airport.

A joint venture project (Saudi Oger Ltd., TAV, ACC)

Location: Madinah Munawwarah, Saudi Arabia.

Value: US$ 1.2 Billion.

Client: General Authority of Civil Aviation (GACA)

Team Composition:7 (1 Senior Scheduler + 2 Schedulers + 2 Reporting Engineers + 2

Project Controls Manager, Saudi Oger Ltd., King Abdullah WAGF Project Package 2

START Date: 
June, 2011
END Date: 
December, 2011

Project: King Abdullah WAGF Project Package 2, Construction of 5 hotels.

Location: Madinah Munawwarah, Saudi Arabia.

Value: US$ 560 Million.

Client: King Abdullah WAGF

Consultant: Omrania & Associates

Team Composition: 7 (2 Senior Planning Engineers + 5 Planning/PCS Engineers).

Planning Manager, Saudi Oger Ltd., Princess Nora Bint Abdulrahman University For Women PNU – Package 1

START Date: 
November, 2009
END Date: 
May, 2011

Project: Princess Nora Bint Abdulrahman University For Women PNU – Package 1. Project components are 19 academic and administrative buildings, a hospital, 400 staff villas, 3 mosques, a clock tower, 5 gates, and 10 security buildings and guard houses. Total build-up areas is 1 million m².

Value: US$ 3 Billion.

Location: Riyadh, Saudi Arabia.

Client: Ministry of Higher Education and Ministry of Finance

Project Controls manager, Saudi Oger Ltd., Jabal Omar Development Project JODP

START Date: 
May, 2009
END Date: 
November, 2009

Project: Jabal Omar Development Project JODP. Project components are 15 hotel and seasonal residential towers including podiums, 13,600 m² mussallah building, and external works). Total build-up areas is 1,260,000 m².

Value: US$ 2.9 Billion.

Location: Makkah, Saudi Arabia.

Client: Jabal Omar Development Company

Team Composition:11 (5 Senior Planning Engineers + 6 Planning and Project Controls

PLANNING ENGINEER, Saudi Oger Ltd., King Abdullah Project for Development of Security Centers (KAP-1)

START Date: 
October, 2013
END Date: 
October, 2014

1.Contract documents study.
2.Detailed Time Schedule.
3.Resources & Cost loading.
4.Updating, Monitoring & Controlling.
5.Progress reports.
6.Tracking issues.
7.Recovery Schedule.
8.Sites coordination for civil works.
9.Monitoring S/C's productivity on sites.

Experience Hours (Planning & Scheduling): 
750
Experience Hours (Cost Management): 
250
Experience Hours (Forensic Analysis): 
50

PLANNING ENGINEER, Saudi Oger Ltd., Saudi Arabia National Guards Housing Project

START Date: 
November, 2010
END Date: 
May, 2011

1.Contract documents study.
2.Detailed Time Schedule.
3.Resources & Cost loading.
4.Progressive elaboration throughout different project stages.
5.Updating, Monitoring & Controlling.
6.Progress reports.
7.Tracking issues.
8.Preparation of Claims & V.O.'s.
9.Recovery Schedule.
10.Site coordination for civil works.
11.Monitoring material usage for restrict controlling

Experience Hours (Planning & Scheduling): 
1050