Mining Works

Dave Dodds

First Name: 
Dave
Last Name: 
Dodds
Professional Since: 
Jul-1998 (27.1 yrs experience)
Oldest experience: 
Jul 2006 (19.1 yrs experience, WARNING: 8.0 years variance with Professional Since)
Years Experience: 
13

P6 Administrator and Scheduler, Aecon, Multiple

START Date: 
December, 2009

Multiple Infrastructure, Mining and Industrial projects.

Administrator for Enterprise P6. 

Experience Hours (Planning & Scheduling): 
10000
Experience Hours (Cost Management): 
600
Experience Hours (Forensic Analysis): 
600

Area Planning Manager, FCB Fives, Cement Plant

START Date: 
March, 2017
END Date: 
June, 2019

Responsable Planning 

Projet : Construction of a cement Plant in CHelf 

Client : ECDE 

Location : Algeria

Project Control Manager, AMEC Foster Wheeler, Anagold

START Date: 
January, 2017
END Date: 
December, 2017

Project Control Manager

Planning, Risk, Monitoring, Control, Reporting, Devolpment project control tools, resources teaching and coaching

Project Control Manager, AMEC Foster Wheeler, Anagold

START Date: 
January, 2017
END Date: 
December, 2017

Project Control Manager

Planning, Risk, Monitoring, Control, Reporting, Devolpment project control tools, resources teaching and coaching

israel torres

First Name: 
israel
Last Name: 
torres
Mineral Business Trader ALL MINERAL AVAILABLE FROM MEXICO MANGANESE ORE 40%+MAGNETIC METAL IRON 64%SULPHUR GRANULAR 99% & 50%COPPER ORE 8% & 25%SILICA SAND 69%IRON ORE 62% & 64%IRON ORE FINE 56% TO 62%ZINC ORE 45% + LEAD ORE 20% 60%METAL IRON 46%min 59%max
Professional Since: 
May-2005 (20.3 yrs experience)
Years Experience: 
0

Lead Planner Scheduler, snc lavalin inc Canada, Ambatovey Project

START Date: 
July, 2006
END Date: 
February, 2016

Lead Planner & Scheduler, supervised a team of 16 Schedulers, 8 on Engineering and Design and 8 on construction.

My work experience contains, Planning and scheduling for Communications projects, Mining Projects, Metals refining Projects, Plower Plants, Gas Plants, Refineries, Large scale mega construction projects.

Experience Hours (Planning & Scheduling): 
12000
Experience Hours (Cost Management): 
2000
Experience Hours (Forensic Analysis): 
2000

Project Planning and Control, Non-Ferrous Mines & Metals Co. , Copper Mine, Copper complex EPC project

START Date: 
December, 2000
END Date: 
July, 2005
  • Conceptualized and launched processes and set of tools for capturing project metrics and funneling that information to easy-to understand reports. Enabled executive management to keep a pulse on project health, revenue expectations, and strategic analysis of projects.
  • Managed project of a fully in house developed PMIS (Project Management Information System) built on a .Net + SQL platform in integration with MS Project 2003, Excel and VBA macros.
Experience Hours (Planning & Scheduling): 
3800
Experience Hours (Cost Management): 
800
Experience Hours (Forensic Analysis): 
300

Project Manager, BEUMER Group (Thailand) Co. Ltd., Various Palletizer and Bag Transport project

START Date: 
August, 2018
END Date: 
June, 2019

Managing and coordinating varied projects for Southeast Asia Region, i.e. (Materials Handling/Industrial Automation projects) Palletizing and Packaging, and material transport projects.

Projects

• TAFiCO Tay Ninh Plant, Vietnam - Palletizer SBBQA 3000 and Bag Transport

• Thai Polyethylene Co., Ltd., Rayong Thailand – Palletizer KBBQA 2500 and Bag Transport

• Asia Cement, Jechon South Korea – Palletizer SBBQA 3000 and Bag Transport

Freelance Planning Manager / Lead Planner, Lundin Mining, ZEP - Lundin Mining (Somincor)

START Date: 
April, 2017
END Date: 
August, 2018

Zinc Expantion Project (ZEP) Lead Planner

 

This was a Very complex Brown Field Project representing an invstment made by Lundin Mining to Explore the new Zinc ore Bodies named Lombador North/South that will allow the increase of Zinc Production and extend the Life of Mine.

Responsible for defining Planning and Scheduling Concept, Progress measuring procedure, Sub-contractors scheduling co-ordination.

Implementation of reporting procedures, KPIs monitoring, Operations coordination.

Experience Hours (Planning & Scheduling): 
3000
Experience Hours (Cost Management): 
200
Experience Hours (Forensic Analysis): 
150