Knowledge Sharing

F
Forum Guest 👤 Member for 17 years 4 months
M
MUHAMMAD IQBAL 👤 Member for 20 years 9 months

jj



how can we measure the percent complete use in EVA



how can we forecast the completion date bases upon the performance of project(EVM)

E
Edgar Ariete 👤 Member for 20 years 10 months

Khalid Abdelaal,



I’m with you. Please advise further on how can you make planning easier & faster.



Regards,



Edgar

M
Mehdi Rashidi Alangeh 👤 Member for 22 years 11 months

Also E-knowledge is technologically realized by the fusion

of e-learning and knowledge management and through

the networking of knowledge workers.

F
Forum Guest 👤 Member for 17 years 4 months

Thamks mehdi

I just wanna to ask you about training this VSI, There is any refrence for study, if there is can you send it me.

M
Mehdi Rashidi Alangeh 👤 Member for 22 years 11 months

Dear morteza,

In fact, this item used in the high technlogy industries. but we use this methodology in PM.

The Virtual Socket Interface Alliance (VSIA) is an open, international organization that includes representatives from all segments of the system-on-chip industry: System houses, Semiconductor vendors, Electronic Design Automation (EDA) companies, and Intellectual Property (IP) providers. VSIAs vision is to dramatically accelerate system-chip development by specifying open standards that facilitate the mix and match of virtual components from multiple sources. VSIA has wide industry participation with more than 180 member companies from Asia, Europe, and the US. Membership is open to any corporation with an interest in the development and promotion of open standards used in the design of system-on-chip.



Best Regards

M
MK TSE 👤 Member for 24 years 3 months

Knowledge sharing is a process. There are lot of method, tools, etc. The forum providing a platform and IT is enabler on sharing. I think we need to think about those available information is knowledge or not.



For examplem, production rate database. "Data" are informative to planner. Can it be a guide line for programme preparation, I dont think so. If I search a production rate, I would like to know how to work it out, what resource, what environment condition, what $ be send. An integration and analysis, more like knowledge



BTW, planning planet already providing a chance among us for discussion, colebaration and information sharing. Thanks.

M
Mehdi Rashidi Alangeh 👤 Member for 22 years 11 months

Hi,

Knowledge sharing is power.

Are there ways for that? Do you know about VSI ( Virtual socket interface)



M.Rashidi

M
Morteza Jafari 👤 Member for 22 years 10 months

Knowledge sharing is very good suggestion, I have the same probelm, as he stated it, but my expericance says Risk and calture is a importance element for each project , we usually do not consider this factor in our estimation.

M
Mike Harvey 👤 Member for 24 years 3 months

Dear Jake

Please visit hpcconsult.co.uk and view 'Planning Academy'.

After 40 years in the industry I am trying to give something back to those looking to resolve problems.

Regards

Mike Harvey

R
Robin Jongen 👤 Member for 24 years 3 months

You are asking if people know new discussion categories. Well I know 1 new category.

Risk analyses.

The first question.
1. When do you use risk analyses on a project.
2. On which planning do you perform a risk analyses? Which level of planning?
3. What is the most used risk analyses on project planning and which risk analyses tool is the most used and why?

K
Khalid Abdelaal 👤 Member for 25 years 5 months

Productivity Rate

This not a question or subject to discuss this is just note from my Experience in the construction industry the productivity rates is the main problem when making schedule the productivity changed from time to time from place to place from Productivity Rate. This not a question or subject to discuss this is just note from my Experience in the construction industry the productivity rates is the main problem when making schedule the productivity changed from time to time from place to place from floor to floor. So assign resource and duration is the most difficult things in planning stage. This make the construction planning one of most difficult work in the world, but this our choice.

Thank you to give me chance to write the first subject in this forum.

Forum Sponsor

Top Posters

anwar zeb
1 posts
olva seselima
1 posts
Muhammd Muneer
0 posts
sairam
0 posts
MARAT BILYALOV
0 posts
RichTea66
0 posts
Muneer Muhammad
1 posts
Manny Onifade
5 posts
Hunais M J
0 posts
Soheil Barekat
4 posts