Website Upgrade Incoming - we're working on a new look (and speed!) standby while we deliver the project

Tips on using this forum..

(1) Explain your problem, don't simply post "This isn't working". What were you doing when you faced the problem? What have you tried to resolve - did you look for a solution using "Search" ? Has it happened just once or several times?

(2) It's also good to get feedback when a solution is found, return to the original post to explain how it was resolved so that more people can also use the results.

waste water treatment plant

3 replies [Last post]
Rola Sabbah
User offline. Last seen 11 years 37 weeks ago. Offline
Joined: 5 Dec 2009
Posts: 61
HI every body
i have a new project which is waste water treatment plant, any help by descriping how the elements work together ? any discription about how these plants work?

Replies

Saeed Shaikh
User offline. Last seen 12 years 37 weeks ago. Offline
Joined: 12 Jan 2012
Posts: 2
Groups: None

wysiwyg_imageupload::

889
join_cata_2.jpg

Please allow us to submit you small introduction of our company, products, Distributions and Services and etc. which might be you need to instaling west water plant projects.

ASALI INTERNATIONALEngaged in Manufacturing, Business Development, Sales and Marketing, Supply and Solution etc. for our own products Flow meters, Capacitance Level Transmitters, Level Indicators, Valves, Strainers, and other engineering and mechanical products.

Please find some copies of our new 2012 brochure and introduction in attachment, after your approval and confirmation I would like to have small business meeting with to submit you technical data of our products Flow Meters and etc as per your valuable orders and positive comments.

Awaiting your prompt and positive response.Thanking you and best rgds.

For  M/s. ASALI INTERNATIONAL.

Flow meters & Industrial Products Manufacturing,

Proprietor:-  SHAIKH SAEED.

Contact details:-.

Tel / Fax.+91 (022) 2741 6355

Dir Line. +91 (022) 6565 6355

Cell. +91 8108 55 63 55.

Cell. +91 9768 920 924.

email. asaliintl@asaliintl.com

www.asaliintl.com

Address:-

OFFICE:- B-137 PLOT NO. J7-J9 KOHINUR INDUSTRIAL COMPLEX,TALOJA MIDC,NEW BOMBAY TALUKA PANVEL DIST. RAIGAD, PIN CODE. 410208,M.S. INDIA.

FACTORY:- 39-40 RAUTARA INDUSTRIAL ESTATE, POST PADHLE, NEAR SHIL PHATA OCTRAI NAKA, MAHAPE MIDC MUMBRA THANE M.S. INDIA.

Samer Zawaydeh
User offline. Last seen 6 years 20 weeks ago. Offline
Joined: 3 Aug 2008
Posts: 1664
Dear Rola,

This is like any other project, you need to start with

Material Submittals (civil, electrical, mechanical and maybe chemical)
Engineering Drawings
Procurement
Construction
Testing and Commissioning
Handing Over

What Gary is describing is the actual process. It is wounderful to be able to understand it in order to be able to monitor the construction and record the progress. Of course, you will be able to identify the Changes from design as well.

Review the BOQs for the material, and the Issued For Construction drawings for the shop drawings to be prepared, and then sit with the Construction team to determine the sequence of construction.

With kind regards,

Samer
Gary Whitehead
User offline. Last seen 6 years 6 weeks ago. Offline
There are a number of different potential treatment options, so the below is fairly generic. Do you not have any kind of scope or spec to work with?

-Screens & screenings handling plant (metal mesh to filter out major detritous which could harm pumps, etc. Screenings handling might be washing it & conveying to skips)
-Stone / grit removal (eg constant velocity grit channels with dredging pump)
-Inlet pumping station
-Primary Settlement tanks (floating scum removed from the top, settled sludge removed from bottom via bellmouth)
-Biological treatment –either
a) Aeration lanes (settled sewerage passes through aerated channels seeded with bugs which eat biological matter)
b) mineral beds (sewerage trickles through the packed mineral beds, with the bugs seeded on top)
-Final Settlement Tanks (similar process to PSTs above)
-Effluent outflow

In addition, the sludge taken from PSTs and FSTs has it’s own process stream:
Sludge storage tanks
Sludge thickening / dewatering
Then 1 or more of the following :
a) anerobic digestion tanks, with gas being recovered as renewable energy
b) Liming plant to reduce odour & raise ph
c) Incineration
d) Thermal drying (export to agriculture)
e) Pasteurisation
f) Thermal Hydrolysis