PSP study Guide references

1 reply [Last post]
Samer Zawaydeh
User offline. Last seen 5 years 8 weeks ago. Offline
Joined: 3 Aug 2008
Posts: 1664
Dear All,

Would you kindly share your recommeded reading material.

The following is the Reference list at the end of the study Guide:

1. Microsoft Project Documentation.
2. ASTM standard E833
3. US Department of Defense.
4. PMI Representative
5. Various Bectel project controls presentations and publications.
6. Internation Association for Professional Management of Construction.
7. NASA work breakdown structure reference Guide, 1994
8. Oregon Department of Human Services, PMO Glossary
9. Westinghouse Savannah River Company EVMS Pocket Guide.
10. Construction Delay Claims, 3e, Barry B Bramble et al 2006.
11. Construction Scheduling: Preparation, Liability and Claims, 2e, Jon M. Wickwire et al, 2006
12. SCL Delay and Disruption Protocol.
13. How to get paid for Construction Changes: Preparation and Resolution Tools and Techniques, Steven S. Pinnel 1998.
14. Primavera Project Planner Documentation.

Thank you for your contribution in advance.

With kind regards,

Samer

Replies

R. Catalan
User offline. Last seen 12 years 8 weeks ago. Offline
Joined: 15 Aug 2005
Posts: 314
Groups: None
All,

RS Means Scheduling Manual

Best regards,