Method statement

6 replies [Last post]
rabbani wgl
User offline. Last seen 17 years 2 weeks ago. Offline
Joined: 9 May 2006
Posts: 15
Groups: None
Hello planners,

Can any one help me in defining the Method statement for a Design Schedule. I mean what will be topics covered under it and how detailed it should be. Appreciate your early responses. Thanks.

Regards

Replies

ashraf alawady
User offline. Last seen 10 years 35 weeks ago. Offline
Joined: 27 Aug 2006
Posts: 320
Groups: None
Excelent exeplenation , but i would like to add
*the utilities study and desgin such as(Water, electerical,sewarage , telephon, ....etc)proposed and protection for the existing.
*Planning and rout varifications.
*preoare the contract Bll of Quantities (quantities?& expected cost estimate ).
Richard Spedding
User offline. Last seen 6 years 31 weeks ago. Offline
Joined: 20 Mar 2007
Posts: 127
Think about how the designers will do their job, or ask them!

Feasibility desk study
Initial route survey
Preferred routes selection
Initial costings
Detailed land survey
Final route selection
Secondary costings
Initial value engineering
Detailed route design
Structures design
Drainage design
Landscaping design
Utilities diversions design / notification
Coordination meetings at regular intervals
Contract document preparation
Final estimate of costs
Value engineering
Tender prequalification notices
Tender period
Review of tenders
Final value engineering
Award of contract


Anoon Iimos
User offline. Last seen 3 years 20 weeks ago. Offline
Joined: 22 Sep 2006
Posts: 1422
conceptual reports, preliminary reports, design criteria, and most of all check your contract!

i’m not an expert!
rabbani wgl
User offline. Last seen 17 years 2 weeks ago. Offline
Joined: 9 May 2006
Posts: 15
Groups: None
Experts please............

Please guide us on this.

Thanks
Rodel Marasigan
User offline. Last seen 20 weeks 6 days ago. Offline
Joined: 25 Oct 2006
Posts: 1699
Use Google and type "Method Statement". There are hips of example and explanation. That’s what I use before.
rabbani wgl
User offline. Last seen 17 years 2 weeks ago. Offline
Joined: 9 May 2006
Posts: 15
Groups: None
Thanks for your suggestion, I tried that. It’s mostly a generic form. What I am looking is a specific list of items to be covered under a Infra structure Design Job.

I am sure, some of the experts may guide us a bit in detail.

Thanks