Mapping Primavera P6’s WBS in into Deltek Cobra’s WBS Code Field

No replies
Emily Foster
User offline. Last seen 1 year 47 weeks ago. Offline
Joined: 19 Aug 2011
Posts: 625
Groups: None

One of the issues with the integration of Primavera P6 and Deltek Cobra is how to best use the integration to update the Cobra WBS (Work Breakdown Structure) code file with the P6 WBS. Here we take a look at how to do this http://ow.ly/DFfO3082MOl