Lead Planning Engineer, Project Coordinator, Petroserv Limited, Oil & Gas Projects and Infrastructural

START Date: 
September, 2005
END Date: 
March, 2013
PETROSERV LIMITED, Doha, Qatar Aug 2011 – Mar 2013PROJECT COORDINATOR • Managed a team of 11 key members at peak consisting of Engineers, Logistic Coordinators, Resource Coordinators, Planners etc.• Handled the task of, preparing the budget, laying out the execution plan & schedule, analyzing and detailing the design package, estimating the resource requirement, developing and implementing cost control procedures etc. • Carried out activities like:Pipeline works, earthmoving, pipe laying (gravity and pressure pipes), reservoir construction, micro-tunnelling works and pump stations. • Undertook a greater role in execution, and was involved with arbitration (Time and cost related). • Eminently played a good role in strategic planning of the company Worked on Following Projects during the tenure • Al Azizia Area Drainage & Outfall, Ashghal (PWA), Doha. (QR. 28 Million) PETROSERV LIMITED, Doha, Qatar Mar 2009 – Aug 2011LEAD PLANNING ENGINEER • Been the Lead Planning Engineer and the control point of 3 projects with 3 different authorities; Qatar Armed Force, Emiri Guard and QP.• Prepared Management reports, Cash flow charts and handled presentations.• Prepared and administered Project budgets. Developed and implemented cost control procedures. • Successfully negotiated through 3 Claims, out of which 2 were cost & time related and 1 was exclusively time related. • Prepared project execution plan in accordance with the quality, safety and contractual requirements. • Held discussions with Project Management Team to analyze and evaluate the functionality of the Project Work Schedule.  Worked on Following Projects during the tenure • Potable, Fire Fighting and Sewage Disposal System for Emiri Guards at Barzan Camp.. (QR. 44 Million)• EPIC Of Duplex Strainers at SW Inlet Lines of AGR 1 & 2 NGL3, Qatar Petroleum, Messaid. .(QR. 28 Million)• Water and Drainage related infrastructural services for central training camp development at Sailiyah – Qatar Armed Force.(QR. 38 Million) PETROSERV LIMITED, Doha, Qatar Sep 2005 – Mar 2009PLANNING ENGINEER • Dealt with multiple projects during my tenure. Been the focal point in planning of 12 projects (QP, QAFCO, QASCO, ASHGAL) over the span of 4 years.• Prepared weightage distribution for activities and documents in conjunction with BOQ.• Liaised with client on a daily basis about various contractual matters, work schedules, and document and material approvals, Monthly invoicing etc. • Prepared Progress Evaluation Criteria and Payment Schedule to best suit the Sub-Contractor’s Scope of Work. • Prepared  Procurement Schedule in line with the vendors Compliances. • Prepared Document Submittal Registers to account the traceability of documents and progress evaluation of submittals. • Prepared and evaluate Weekly look-ahead schedule and listedthe anticipated manpower and equipment requirement as per schedule. • Conducted root cause analysis on all slippages in the project progress. Prepared, compiled and presented of Project Close-out Dossier. Worked on Following Projects during the tenure • EPIC for Replacement of Mechanical Seals for Hydrocarbon Process Pumps in NGL Plants, Qatar Petroleum,Mesaieed. (QR. 44 Million)• EPIC for Installation of Sand Filter & Sequencing Batch Reactor (SBR) at Dukhan Sewage Treatment Plant (STP), Qatar Petroleum, Dukhan. (QR. 40 Milion)• Miscellaneous Instrumentation works at Arab–D Plant in the Dukhan Fields, Qatar Petroleum, Dhukhan.• EPIC OF 24" Water Line Installation, Qatar Petroleum Dukhan• Cultural Village Developemtn Project, Cultural Village Committee.• Construction of TSE Main to Al-Rakhiya Farm, Ashgal• Redevelopment of Doha Sailing Club, QNOC• Modification of Sanitary system Onshore and Offshore, Qatar Gas,RasLaffan.• Major Overhaul of Crude Oil Tanks, Qatar Petroleum,Halul Island.• N° 1 Auxiliary Boiler 200 ton/h, QAFCO 2, Mesaieed.• New Bar Mill Project – QASCO, Mesaieed.• Abu Hamour Area Drainage Project – Ashgal.
Experience Hours (Planning & Scheduling): 
22000
Experience Hours (Cost Management): 
6000
Experience Hours (Forensic Analysis): 
4000