Project Planner, Louwill Engineering/ Power Steel Construction, Steel Construction -Fabrication Of Steel, Erecting Of Steel , Building Of Headgears, Winder Houses , Re- Building Headgears

START Date: 
October, 2010
END Date: 
May, 2011

 

Project Planner  PowerSteel Constuction (2010/10/24 - 2011/05/31)

 

 Herewith some of the basic tasks I’ve done at the above mentioned company:

  • Attending Tender Meetings (To get information for tender program-schedule)
  • Design A Tender Program-Schedule (With minimum detail –baseline program /schedule Level 1-2)
  • Attending Tender Award Meeting (To get information for more detail program/schedule Level 2-3)
  • Attending Site Meeting (To see site layout and getting t

Project Planner, Louwill Engineering/ Power Steel Construction, Steel Construction -Fabrication Of Steel, Erecting Of Steel , Building Of Headgears, Winder Houses , Re- Building Headgears

START Date: 
October, 2010
END Date: 
May, 2011

 

Project Planner  PowerSteel Constuction (2010/10/24 - 2011/05/31)

 

 Herewith some of the basic tasks I’ve done at the above mentioned company:

  • Attending Tender Meetings (To get information for tender program-schedule)
  • Design A Tender Program-Schedule (With minimum detail –baseline program /schedule Level 1-2)
  • Attending Tender Award Meeting (To get information for more detail program/schedule Level 2-3)
  • Attending Site Meeting (To see site layout and getting t

Project Planner, Masters Splice & Termination, Koepe Winder Electrical Installation, Central Balsting System Installations, Re - Building Mining Shafts(Electrical), Switch Gear , Substations

START Date: 
August, 2009
END Date: 
September, 2010

Project Planner  Master Splice & Termination (2009/08/11 - 2010/09/31)

 

 Herewith some of the basic tasks I’ve done at the above mentioned company:

  • Attending Tender Meetings (To get information for tender program-schedule)
  • Design A Tender Program-Schedule (With minimum detail –baseline program /schedule Level 1-2)
  • Attending Tender Award Meeting (To get information for more detail program/schedule Level 2-3)
  • Attending Site Meeting (To see site layout and getting the fin

Junoir Project Planner, B&W Instrumentation And Electrical, Coal Refinery Plant, Crusher Plant, Workshops. I was responsible for more than 15 Projects small and major

START Date: 
January, 2008
END Date: 
March, 2009

Planner  B&W Instrumentation and Electrical Limited (2008/01/25 – 2009/03/01)

 

Herewith some of the basic tasks I’ve done at the above mentioned company:

  • Attending Tender Meetings (To get information for tender program-schedule)
  • Design A Tender Program-Schedule (With minimum detail –baseline program /schedule Level 1-2)
  • Attending Tender Award Meeting (To get information for more detail program/schedule Level 2-3)
  • Attending Site Meeting (To see site layout and getting the fi

Junoir Project Planner, B&W Instrumentation And Electrical, Coal Refinery Plant, Crusher Plant, Workshops. I was responsible for more than 15 Projects small and major

START Date: 
January, 2008
END Date: 
March, 2009

Planner  B&W Instrumentation and Electrical Limited (2008/01/25 – 2009/03/01)

 

Herewith some of the basic tasks I’ve done at the above mentioned company:

  • Attending Tender Meetings (To get information for tender program-schedule)
  • Design A Tender Program-Schedule (With minimum detail –baseline program /schedule Level 1-2)
  • Attending Tender Award Meeting (To get information for more detail program/schedule Level 2-3)
  • Attending Site Meeting (To see site layout and getting the fi

Assistant Planner , Saudi Oger Ltd., KSA MOI - Civil Defense Buildings

START Date: 
September, 2010

- Prepares Planning & Scheduling and Progress Reporting for 14 project Sites.

Assistant Planner , Saudi Oger Ltd., KSA MOI - Civil Defense Buildings

START Date: 
September, 2010

- Prepares Planning & Scheduling and Progress Reporting for 14 project Sites.

Project Controls Specialist (EPC), Doyon Utilities, adyard abudhabi LLC, P2074 Fort Wayne Wright Utilidor Upgrade, MH E6-7-8 to MH E6-9-6, Phase 2

START Date: 
September, 2008
END Date: 
January, 2013

Project Controls Specialist for the Engineering Department at Doyon Utilities LLC in Fairbanks Ak.

We have a 50 years contract for Fort Greely, Fort Wayne Wright and Fort Richardson Army installations in Alaska.

Started with DU in March 2013.  Prior to that I was assigned to the Activity Planning Department within BP Alaska.  I scheduled for Endicott, Milne Point and the East side facilities of Prudhoe Bay for 5 years.  We started scheduling on the North Slope in MS Project.  BP soon recognized, due to the hierarchy of P6, the need to move to Primevara.&n

Senior Associate, AECOM, Rail Project

START Date: 
January, 1980

Senior Associate -  Project Controller for Mega Transportation Projects all over the World.

Aviation, Highway Bridge, Rail etc.

Area Planning Manager, Balfour Beatty Construction, Brigg REP power plant

START Date: 
June, 2013
A committed, conscientious & experienced professional with a dedicated enthusiastic approach to the Planning discipline. I have a vast experience of a varied number of differing types of projects & construction methods.