Planning Technician, PETROLEO BRASILEIRO S.A. - PETROBRAS - TELSAN ENGENHARIA, Construction Project of the Abreu e Lima Refinery

START Date: 
July, 2013
END Date: 
June, 2014
  • Responsible for ensure together with the Planning Engineer to integrate all the schedules of the construction Project of the Abreu e Lima Refinery.
  • Application the checklist in the schedules submitted by contractors to ensure the quality and integration of it.
  • Preparation of Physical Advancement curves and management reports to the Directors and the President of Petrobras.
  • Preparation and review of planning procedures..
Experience Hours (Planning & Scheduling): 
1950

Planning Technician, PETROLEO BRASILEIRO S.A. - PETROBRAS - LOGICTEL SA, Construction Project of the Abreu e Lima Refinery

START Date: 
October, 2011
END Date: 
June, 2013

• Responsible for the Telecommunications contract schedule in the construction project of the refinery Abreu e Lima. • Preparation of monthly and bimonthly schedules of activities. • Preparation of manpower histogram. • Preparation of Physical Advancement curves Telecommunications Agreement. • Preparation of Measurement Reports.

Experience Hours (Planning & Scheduling): 
3450
Experience Hours (Cost Management): 
3450

Construction Planning Consultant, PETROLEO BRASILEIRO S.A. - PETROBRAS - STEI SERVIÇOS TÉCNICOS, Construction Project of the Abreu e Lima Refinery

START Date: 
June, 2014
END Date: 
July, 2015
  • Responsible for ensure together with the Planning Engineer to integrate all the schedules of the construction Project of the Abreu e Lima Refinery.
  • Application the checklist in the schedules submitted by contractors to ensure the quality and integration of it.
  • Preparation of Physical Advancement curves and management reports to the Directors and the President of Petrobras.
  • Preparation and review of planning procedures..
  • Integration of all Project schedules by checking the interfaces between units and evaluating the impacts.
  • Realization the 4D Pla
Experience Hours (Planning & Scheduling): 
2000

Frederico Oliveira

First Name: 
Frederico
Last Name: 
Oliveira

Professional B.S in Electrical Engineering, Executive MBA in Project Management and Esp. in Safety Engineering.  English advanced and Spanish basic.

Professional with more than 10 years of experience in Industrial Project Planning, include site planning,  shutdowns and commissioning.

Electromechanical assembly Contract Management, following the execution, measurement and control services.

Experience in expediting and inspection of electromechanical equipment for the implementation of oil and gas plants, mining and power generation.

Professional Since: 
Aug-2006 (18.8 yrs experience)
Oldest experience: 
Oct 2011 (13.6 yrs experience, WARNING: 5.2 years variance with Professional Since)
Years Experience: 
46

Area Planning Engineer, CVRD (Companhia Vale dos Rio Doce) (Brazillian Com, First Line of Brucutu

START Date: 
October, 2011
END Date: 
July, 2015
  • Management of civil construction, electromechanical assembly and commissioning contracts, following the planning, measurement and execution of services, in total 8,400 m³ concrete, 3,300 tons of metal structures, 6,600 tons of equipment and boiler, 344,000 meters of cables and 35,000 m of pipe.
  • Coordination of a team with 6 people updating and producing many project documents: schedule, physical progress curves, WBS, histograms of equipment and labor, milestones and Capex (reduction of 8% of the budgeted cost and anticipation in the delivery of the project in nine months), acti
Experience Hours (Planning & Scheduling): 
1600

Scheduller Planning technician, ENGECAMPO engineering, Construction thermoelectric plant

START Date: 
January, 2011
END Date: 
April, 2011
Stop: the Thermoelectric Jose Carlos Preste in Tres Lagoas MS, Planning and Control of the activities of "Diverter Damper" and pipe installation, MSProject System, Measurement, weekly and monthly report, Histogram MOI, MOD and EQUIPMENT.
Experience Hours (Planning & Scheduling): 
250
Experience Hours (Cost Management): 
250
Experience Hours (Forensic Analysis): 
150

Cleberson Ferreira

First Name: 
Cleberson
Last Name: 
Ferreira

Professional with solid experience developed in national and multinational companies large size in the areas of Construction, Procurement, Natural Gas, Sanitation (water supply), Mining and Project Management.

I have a degree in Civil Engineering and an MBA in Management, Project Management and certified by the Project Management Institute. I have good knowledge of the English language.

Professional Since: 
May-2010 (15.0 yrs experience)
Years Experience: 
0

Edson Castro

First Name: 
Edson
Last Name: 
Castro
  • Participation in Electromechanical Projects: FPSOs, Drill Ships, Refineries and Metallurgy, and Civil Projects: Expansion of Pharmaceutical Industry, Construction of PCH (Small Hydroelectric Plant) and Extension of Metallurgical Industry.
  • International Experience having worked in Singapore and China and participated in Meetings in Norway and Poland.
  • Experience with Clients of diverse areas such as CHEVRON, ROCHE, GERDAU, PETROBRAS, ELETROSUL and SETE BRASIL.
  • Contract Administration in editing, approval and control of Change Orders, Claim's and Scope Control.
Professional Since: 
Jan-1996 (29.4 yrs experience)
Years Experience: 
0

Fernando Suchek

First Name: 
Fernando
Last Name: 
Suchek

I have over 12 years of experience in Oil and Gas industry and also have experience with project planning and management, cost engineering, and quality control program.

Professional Since: 
Mar-2000 (25.2 yrs experience)
Years Experience: 
0

Rodrigo Vinícius Alvarenga Andrade

First Name: 
Rodrigo Vinícius
Last Name: 
Alvarenga Andrade
Professional Since: 
Jan-2010 (15.4 yrs experience)
Years Experience: 
0

Market Place

No results found... (try selecting a different content filter)

Syndicate content