Website Upgrade Incoming - we're working on a new look (and speed!) standby while we deliver the project

South Africa (AF.ZA)

Chief Operations Officer, Concreteman SA, V-drains, Curbs, Manholes,Farm stores

START Date: 
May, 2014

Construction of RDP housing.

  • Excavation of foundation
  • Level and compacting of foundation
  • Steel fixing
  • Pouring concrete
  • Power float floors

 

Concreteman SA 

Experience Hours (Planning & Scheduling): 
4000
Experience Hours (Cost Management): 
4000
Experience Hours (Forensic Analysis): 
50

Dean Noton

First Name: 
Dean
Last Name: 
Noton

Currently working for DRA Africa, for the Mineral Projects devision. I am the Lead Senior Planner for the Proposals an Studies group. I also consult on various projects for setting up systems for planning.

Professional Since: 
Aug-2006 (18.8 yrs experience)
Oldest experience: 
Aug 2001 (23.8 yrs experience, WARNING: 5.0 years variance with Professional Since)
Years Experience: 
15

Senior Planner, DRA, Various & Proposals

START Date: 
August, 2010

Senior Planner at DRA Projects. Currently heading up planning for their proposals & studies group. I also coordinate with multiple studies & projects, supporting the planners & planning systems. I also produce scheduls for our planning department. I am currently the lead expert on Primavera P6 and Micosoft Projects (2013) for DRA.

Experience Hours (Planning & Scheduling): 
21000
Experience Hours (Cost Management): 
4500
Experience Hours (Forensic Analysis): 
1000

Planning Manager & Senior Planning Engineer, SAPREF, Oil Refinery Shutdown

START Date: 
February, 2013
END Date: 
January, 2014

Regional Planning Manager, KZN

Operations and Engineering planning for SAPREF Refinery

All planning functions required to setup the Refinery Shutdown and Start Up schedule. Liason with Operators and analysis of the shutdown and start up procedures and producing a meaningful schedule for this.

I moved to the Engineering department after the Turnaround and proceeded to produce planning for a number of small projects that were being executed throughout the refinery

Experience Hours (Planning & Scheduling): 
1950
Experience Hours (Forensic Analysis): 
500

Senior Site Planner, Foster Wheeler, NMPP Feeder Line Project

START Date: 
November, 2012
END Date: 
February, 2013

Senior Site Planner - NMPP Feeder Line Project based at Island View.

Responsible for all planning, updates, forecasts, and highlighting foreseeable problem areas.

Experience Hours (Planning & Scheduling): 
700
Experience Hours (Forensic Analysis): 
200

Darren McCarthy

First Name: 
Darren
Last Name: 
McCarthy

After graduating from high school in 2007, I decided to take the opportunity to further my studies through tertiary education as I was offered a full bursary to do so. I have obtained a Diploma in Business Administration and majored in finance and business management.

Professional Since: 
Jul-2012 (12.9 yrs experience)
Years Experience: 
0

Senior Planner, Bateman, SNC-Lavalin, Evra Consulting, Kusile Coal Fired Power Station – South Africa

START Date: 
June, 2016

I currently perform the role of a Senior Planning Consultant for a specilist project Planning consultancy called Evra Consulting.

I occupy a role which involves business development and plannig supervison. 

EVRA COnsultancy offers planning services primariliy in the Construction, Power and Infrastructure. Inaddidtion to this the firm specializes in Forensic Planning services. 

Experience Hours (Planning & Scheduling): 
6600

Construction Planner, Group Five Coastal, (various projects)

START Date: 
December, 2014
END Date: 
January, 2016

· Recently started with Autodesk software & Linking the CCS programme to a 3D Revit Model         

Studying tender document (Contract, drawings, specifications, reports etc)

·         Extracting information which might be risk to our business unit, identifying opportunities and defining whether or not the timeframe given is achievable

Planning & Site Engineer, Group Five Coastal, IRT Open Feeders

START Date: 
January, 2012
END Date: 
December, 2014

I Started out on the IRT Open Feeders Project as Part of the My Citi Bus stop enrollment to the greater Cape Town area.  Roles and duties included, but were not limited to:

 

·         Implementation and monitoring of QCP and QMS system on site

·         Communicating with Foreman  and Site Agent

·         Managing a team and myself

Paul van Rensburg

First Name: 
Paul
Last Name: 
van Rensburg

I started my career in 2012 on the IRT My Citi Bus stops in and around Cape Town where I was a Site Engineer. 

 

Towards the end of 2014 I applied for an internal post as a Planner in our Estimating & Tendering Department and I have worked with a wide range of Tenders for this duration. I have also started to assist our on-site teams with their programming (Construction and Target programmes).

 

Professional Since: 
Jan-2012 (13.4 yrs experience)
Oldest experience: 
Jan 2007 (18.4 yrs experience, WARNING: 5.0 years variance with Professional Since)
Years Experience: 
9

Market Place

No results found... (try selecting a different content filter)