Guild of Project Controls: Compendium | Roles | Assessment | Certifications | Membership

varity

planner, rok group, varity

START Date: 
July, 2008
END Date: 
July, 2000
  • Construction phase planning including:
    • Controls and early warning systems
    • Report writing and presentation,
    • As-built programming,
    • Progress drawings and photos
    • Critical path and float analysis
  • Tender planning including;
    • Pre-construction phase planning,            
    • Design and procurement controls and management,
    • Production of detailed methodology and logistics and

Preliminaries work book 

planner, rok group, varity

START Date: 
July, 2008
END Date: 
July, 2000
  • Construction phase planning including:
    • Controls and early warning systems
    • Report writing and presentation,
    • As-built programming,
    • Progress drawings and photos
    • Critical path and float analysis
  • Tender planning including;
    • Pre-construction phase planning,            
    • Design and procurement controls and management,
    • Production of detailed methodology and logistics and

Preliminaries work book 

planner, rok group, varity

START Date: 
July, 2012
  • Construction phase planning including:
    • Controls and early warning systems
    • Report writing and presentation,
    • As-built programming,
    • Progress drawings and photos
    • Critical path and float analysis
  • Tender planning including;
    • Pre-construction phase planning,            
    • Design and procurement controls and management,
    • Production of detailed methodology and logistics and

Preliminaries work book 

Market Place

Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher. Teach yourself using on-line or book based learning or run your own in-house or public courses.
Syndicate content